PABRIK BIOMETHANE DARI SAMPAH KOTA KAPASITAS BAHAN BAKU 90.000 TON/TAHUN

Biomethane plants from municipal solid waste was designed with capacity 90,000 tons solid waste per year and operate for 330 days a year. Biomethane as the main product can be used as fuel gas for vehicles as well as fuel for electricity generation. The manufacturing process by following these steps...

Full description

Saved in:
Bibliographic Details
Main Authors: , NANDA PRAWIRA A., , Ir. Siti Syamsiah Ph.D.
Format: Theses and Dissertations NonPeerReviewed
Published: [Yogyakarta] : Universitas Gadjah Mada 2010
Subjects:
ETD
Online Access:https://repository.ugm.ac.id/127617/
http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=67881
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universitas Gadjah Mada
id id-ugm-repo.127617
record_format dspace
spelling id-ugm-repo.1276172016-03-04T08:50:42Z https://repository.ugm.ac.id/127617/ PABRIK BIOMETHANE DARI SAMPAH KOTA KAPASITAS BAHAN BAKU 90.000 TON/TAHUN , NANDA PRAWIRA A. , Ir. Siti Syamsiah Ph.D. ETD Biomethane plants from municipal solid waste was designed with capacity 90,000 tons solid waste per year and operate for 330 days a year. Biomethane as the main product can be used as fuel gas for vehicles as well as fuel for electricity generation. The manufacturing process by following these steps: separation processes municipal solid waste into organic and inorganic waste, and then organic waste went through anaerobic digestion process inside the reactor to produce biogas and biogas upgrading process using water scrubbing process (absorption by water) to produce biomethane . Degradation process in the reactor takes place in an anaerobic environment or no oxygen exist. The temperature inside the reactor is maintained at 40 o C which is still classified at mesophilic temperature range (30-40 o C), because the exothermic reaction takes place in the reactor cooling coil is added by using cooling water. Factory is planned to be located in areas Piyungan, Yogyakarta, on the land of 15,000 m 2 (1.5 ha). Utilities required are as much as 64066.90 kg / hr water, 1649.50 kVA electricity and 431.03 m 3 /hr of compressed air. From the calculation of economic evaluation results obtained by fixed capital investment, FCI = US $ 4,447,840.91 + Rp 22.860.029.406,72, working capital, WC = US $ 1,913,663.48 + Rp 9,446,911,588.44, profit before tax of Rp 20,199,495,131.07 per year , profit after tax of Rp 10,099,747,565.54 per year, return on investment before taxes = 32.12%, return on investment after taxes = 16.06%, payout time before taxes = 2.49 year, pay out time after taxes = 4.16 years, break even point, the BEP = 48.57%, shut down point, SDP = 29.82%, discounted cash flow rate of return, DCFRR = 28.1%. Based on the calculation above, the biomethane plant with a capacity of 90,000 tons of raw material / year should be studied further. [Yogyakarta] : Universitas Gadjah Mada 2010 Thesis NonPeerReviewed , NANDA PRAWIRA A. and , Ir. Siti Syamsiah Ph.D. (2010) PABRIK BIOMETHANE DARI SAMPAH KOTA KAPASITAS BAHAN BAKU 90.000 TON/TAHUN. UNSPECIFIED thesis, UNSPECIFIED. http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=67881
institution Universitas Gadjah Mada
building UGM Library
country Indonesia
collection Repository Civitas UGM
topic ETD
spellingShingle ETD
, NANDA PRAWIRA A.
, Ir. Siti Syamsiah Ph.D.
PABRIK BIOMETHANE DARI SAMPAH KOTA KAPASITAS BAHAN BAKU 90.000 TON/TAHUN
description Biomethane plants from municipal solid waste was designed with capacity 90,000 tons solid waste per year and operate for 330 days a year. Biomethane as the main product can be used as fuel gas for vehicles as well as fuel for electricity generation. The manufacturing process by following these steps: separation processes municipal solid waste into organic and inorganic waste, and then organic waste went through anaerobic digestion process inside the reactor to produce biogas and biogas upgrading process using water scrubbing process (absorption by water) to produce biomethane . Degradation process in the reactor takes place in an anaerobic environment or no oxygen exist. The temperature inside the reactor is maintained at 40 o C which is still classified at mesophilic temperature range (30-40 o C), because the exothermic reaction takes place in the reactor cooling coil is added by using cooling water. Factory is planned to be located in areas Piyungan, Yogyakarta, on the land of 15,000 m 2 (1.5 ha). Utilities required are as much as 64066.90 kg / hr water, 1649.50 kVA electricity and 431.03 m 3 /hr of compressed air. From the calculation of economic evaluation results obtained by fixed capital investment, FCI = US $ 4,447,840.91 + Rp 22.860.029.406,72, working capital, WC = US $ 1,913,663.48 + Rp 9,446,911,588.44, profit before tax of Rp 20,199,495,131.07 per year , profit after tax of Rp 10,099,747,565.54 per year, return on investment before taxes = 32.12%, return on investment after taxes = 16.06%, payout time before taxes = 2.49 year, pay out time after taxes = 4.16 years, break even point, the BEP = 48.57%, shut down point, SDP = 29.82%, discounted cash flow rate of return, DCFRR = 28.1%. Based on the calculation above, the biomethane plant with a capacity of 90,000 tons of raw material / year should be studied further.
format Theses and Dissertations
NonPeerReviewed
author , NANDA PRAWIRA A.
, Ir. Siti Syamsiah Ph.D.
author_facet , NANDA PRAWIRA A.
, Ir. Siti Syamsiah Ph.D.
author_sort , NANDA PRAWIRA A.
title PABRIK BIOMETHANE DARI SAMPAH KOTA KAPASITAS BAHAN BAKU 90.000 TON/TAHUN
title_short PABRIK BIOMETHANE DARI SAMPAH KOTA KAPASITAS BAHAN BAKU 90.000 TON/TAHUN
title_full PABRIK BIOMETHANE DARI SAMPAH KOTA KAPASITAS BAHAN BAKU 90.000 TON/TAHUN
title_fullStr PABRIK BIOMETHANE DARI SAMPAH KOTA KAPASITAS BAHAN BAKU 90.000 TON/TAHUN
title_full_unstemmed PABRIK BIOMETHANE DARI SAMPAH KOTA KAPASITAS BAHAN BAKU 90.000 TON/TAHUN
title_sort pabrik biomethane dari sampah kota kapasitas bahan baku 90.000 ton/tahun
publisher [Yogyakarta] : Universitas Gadjah Mada
publishDate 2010
url https://repository.ugm.ac.id/127617/
http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=67881
_version_ 1681232647827750912