TINJAUAN HUKUM INVESTASI DALAM PEMBANGUNAN PEMBANGKIT LISTRIK TENAGA NUKLIR DI SEMENAJUNG MURIA JEPARA JAWA TENGAH
The development of PLTN (nuclear power plant) in Jepara has long been planned since 1972. There is Preparatory Commission for the Development of PLTN (KP2-PLN), in 1989 there was the National Energy Coordinating Agency (BAKOREN) that assign tasks to BATAN to search the site and feasibility study of...
Saved in:
Main Authors: | , Heri Iskandar, , Prof. M.Hawin, S.H., LL.M.,Ph.D. |
---|---|
Format: | Theses and Dissertations NonPeerReviewed |
Published: |
[Yogyakarta] : Universitas Gadjah Mada
2013
|
Subjects: | |
Online Access: | https://repository.ugm.ac.id/127887/ http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=68196 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universitas Gadjah Mada |
Similar Items
-
Interaksi Kepentingan Stakeholder Dalam Rencana Pembangunan Pembangkit Listrik Tenaga Nuklir (Pltn) Di Indonesia
by: Raisa Akmalie
Published: (2020) -
Respon masyarakat desa terhadap rencana pembangunan pembangkit listrik tenaga nuklir (PLTN) dan implikasinya bagi ketahanan wilayah :: Studi di Desa Balong Kecamatan Kembang Kabupaten Jepara Provinsi Jawa Tengah
by: , BADRUDDIN, et al.
Published: (2010) -
Perancangan Pembangkit Listrik Tenaga Surya di Kawasan PLTU Tanjung Jati B, Jepara, Jawa Tengah
by: , AHMAD RAHMA W, et al.
Published: (2013) -
Pengembangan Pembangkit Listrik Tenaga Ombak
by: Perpustakaan UGM, i-lib
Published: (1998) -
ANALISIS EKSERGI PADA PEMBANGKIT LISTRIK TENAGA UAP
by: , PUJI SRI NINGSIH, et al.
Published: (2013)