MODIFIKASI PADA SALURAN TRANSISI PELIMPAH BENDUNGAN UNTUK MENGURANGI TERBENTUKNYA ALIRAN SILANG DI SALURAN PELUNCUR (Studi Kasus : Model Bendungan Bener)
Before having it functioned for irrigation purposes as well as to provide potable water and electric power generator, a preliminary plan by constructing the Bener Weir is required. The weir is situated on Bogowonto River within the administration boundaries of the Purworejo Regency. As an expensive...
Saved in:
Main Authors: | , |
---|---|
Format: | Theses and Dissertations NonPeerReviewed |
Published: |
[Yogyakarta] : Universitas Gadjah Mada
2014
|
Subjects: | |
Online Access: | https://repository.ugm.ac.id/127949/ http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=68269 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universitas Gadjah Mada |