PEMODELAN ESTIMASI KERUSAKAN PERKERASAN JALAN (Studi Kasus Ruas Jalan Nasional di Wilayah Kerja PPK 3, Satker PJN Wilayah Propinsi DIY)

Pavement Management System (PMS) gives information which is required in road management decision making, for example maintenance and rehabilitation (M&R) planning. Planning is required in order to choose the right scheme between repairing poor pavement and maintaining good pavement to prevent fu...

Full description

Saved in:
Bibliographic Details
Main Authors: , Emma Kartika C, , Arief Setiawan Budi Nugroho, S.T, M.Eng, Ph.D
Format: Theses and Dissertations NonPeerReviewed
Published: [Yogyakarta] : Universitas Gadjah Mada 2014
Subjects:
ETD
Online Access:https://repository.ugm.ac.id/128400/
http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=68743
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universitas Gadjah Mada
id id-ugm-repo.128400
record_format dspace
spelling id-ugm-repo.1284002016-03-04T07:55:47Z https://repository.ugm.ac.id/128400/ PEMODELAN ESTIMASI KERUSAKAN PERKERASAN JALAN (Studi Kasus Ruas Jalan Nasional di Wilayah Kerja PPK 3, Satker PJN Wilayah Propinsi DIY) , Emma Kartika C , Arief Setiawan Budi Nugroho, S.T, M.Eng, Ph.D ETD Pavement Management System (PMS) gives information which is required in road management decision making, for example maintenance and rehabilitation (M&R) planning. Planning is required in order to choose the right scheme between repairing poor pavement and maintaining good pavement to prevent further degradation. PMS requires accurate pavement condition monitoring and appropriate pavement performance prediction so that M&R plan can be effective. This research was conducted by developing pavement distress estimation models. The developed models were used as base on road maintenance planning. This research used the national road network of PPK 3, Satker PJN, Yogyakarta Province as a case study. Pavement distress estimation models were developed based on Markov and Artificial Neural Network (ANN) theory, that used crack area, crack width, potholes, rutting, IRI and SDI as parameter. Markov model development used homogen Markov Chain which was generated based on condition transition probability for low and high traffic load category. Meanwhile, ANN model used data from traffic and road condition survey as input variable. Future road condition estimation values in ANN model were simulated by Matlab software . Both models were evaluated using regression from degradation curve approach. Analysis result shown that in general, based on regression of degradation curve approach, the R2 value of ANN model is higher compared to Markov model. ANN model is better than Markov model in case of its generality in modeling structure so that it can be used flexibly. Because of its flexibility, using related input variables, ANN model is able to develop road deterioration model based on IRI and SDI parameter which is not able to be developed by Markov model for high traffic load category. On the other hand, Markov model is superior in term of its easiness for maintenance plan arrangement. Maintenance plan which was made based on the developed model shown that annual routine maintenance gives optimum result, considered from cost term. [Yogyakarta] : Universitas Gadjah Mada 2014 Thesis NonPeerReviewed , Emma Kartika C and , Arief Setiawan Budi Nugroho, S.T, M.Eng, Ph.D (2014) PEMODELAN ESTIMASI KERUSAKAN PERKERASAN JALAN (Studi Kasus Ruas Jalan Nasional di Wilayah Kerja PPK 3, Satker PJN Wilayah Propinsi DIY). UNSPECIFIED thesis, UNSPECIFIED. http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=68743
institution Universitas Gadjah Mada
building UGM Library
country Indonesia
collection Repository Civitas UGM
topic ETD
spellingShingle ETD
, Emma Kartika C
, Arief Setiawan Budi Nugroho, S.T, M.Eng, Ph.D
PEMODELAN ESTIMASI KERUSAKAN PERKERASAN JALAN (Studi Kasus Ruas Jalan Nasional di Wilayah Kerja PPK 3, Satker PJN Wilayah Propinsi DIY)
description Pavement Management System (PMS) gives information which is required in road management decision making, for example maintenance and rehabilitation (M&R) planning. Planning is required in order to choose the right scheme between repairing poor pavement and maintaining good pavement to prevent further degradation. PMS requires accurate pavement condition monitoring and appropriate pavement performance prediction so that M&R plan can be effective. This research was conducted by developing pavement distress estimation models. The developed models were used as base on road maintenance planning. This research used the national road network of PPK 3, Satker PJN, Yogyakarta Province as a case study. Pavement distress estimation models were developed based on Markov and Artificial Neural Network (ANN) theory, that used crack area, crack width, potholes, rutting, IRI and SDI as parameter. Markov model development used homogen Markov Chain which was generated based on condition transition probability for low and high traffic load category. Meanwhile, ANN model used data from traffic and road condition survey as input variable. Future road condition estimation values in ANN model were simulated by Matlab software . Both models were evaluated using regression from degradation curve approach. Analysis result shown that in general, based on regression of degradation curve approach, the R2 value of ANN model is higher compared to Markov model. ANN model is better than Markov model in case of its generality in modeling structure so that it can be used flexibly. Because of its flexibility, using related input variables, ANN model is able to develop road deterioration model based on IRI and SDI parameter which is not able to be developed by Markov model for high traffic load category. On the other hand, Markov model is superior in term of its easiness for maintenance plan arrangement. Maintenance plan which was made based on the developed model shown that annual routine maintenance gives optimum result, considered from cost term.
format Theses and Dissertations
NonPeerReviewed
author , Emma Kartika C
, Arief Setiawan Budi Nugroho, S.T, M.Eng, Ph.D
author_facet , Emma Kartika C
, Arief Setiawan Budi Nugroho, S.T, M.Eng, Ph.D
author_sort , Emma Kartika C
title PEMODELAN ESTIMASI KERUSAKAN PERKERASAN JALAN (Studi Kasus Ruas Jalan Nasional di Wilayah Kerja PPK 3, Satker PJN Wilayah Propinsi DIY)
title_short PEMODELAN ESTIMASI KERUSAKAN PERKERASAN JALAN (Studi Kasus Ruas Jalan Nasional di Wilayah Kerja PPK 3, Satker PJN Wilayah Propinsi DIY)
title_full PEMODELAN ESTIMASI KERUSAKAN PERKERASAN JALAN (Studi Kasus Ruas Jalan Nasional di Wilayah Kerja PPK 3, Satker PJN Wilayah Propinsi DIY)
title_fullStr PEMODELAN ESTIMASI KERUSAKAN PERKERASAN JALAN (Studi Kasus Ruas Jalan Nasional di Wilayah Kerja PPK 3, Satker PJN Wilayah Propinsi DIY)
title_full_unstemmed PEMODELAN ESTIMASI KERUSAKAN PERKERASAN JALAN (Studi Kasus Ruas Jalan Nasional di Wilayah Kerja PPK 3, Satker PJN Wilayah Propinsi DIY)
title_sort pemodelan estimasi kerusakan perkerasan jalan (studi kasus ruas jalan nasional di wilayah kerja ppk 3, satker pjn wilayah propinsi diy)
publisher [Yogyakarta] : Universitas Gadjah Mada
publishDate 2014
url https://repository.ugm.ac.id/128400/
http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=68743
_version_ 1681232787732955136