PEMBUATAN PERENCANAAN BAHAN BAKU ATAU MRP (MATERIAL REQUIREMENT PLANNING) DAN KENDALA PADA PRODUKSI TAS ADIDAS FIBA1011 BULAN JANUARI DI PT.KOMITRANDO EMPORIO YOGYAKARTA
The methods of this study are literature study from relevant books to the topic, data collection from company, and interview with company�s staffs. Raw material is the most important thing in the production process. Material Requirement Planning (MRP) is a company strategy for raw material plannin...
Saved in:
Main Authors: | , |
---|---|
Format: | Theses and Dissertations NonPeerReviewed |
Published: |
[Yogyakarta] : Universitas Gadjah Mada
2014
|
Subjects: | |
Online Access: | https://repository.ugm.ac.id/129015/ http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=69390 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universitas Gadjah Mada |
id |
id-ugm-repo.129015 |
---|---|
record_format |
dspace |
spelling |
id-ugm-repo.1290152016-03-04T07:55:07Z https://repository.ugm.ac.id/129015/ PEMBUATAN PERENCANAAN BAHAN BAKU ATAU MRP (MATERIAL REQUIREMENT PLANNING) DAN KENDALA PADA PRODUKSI TAS ADIDAS FIBA1011 BULAN JANUARI DI PT.KOMITRANDO EMPORIO YOGYAKARTA , DWIOCTA SYAFITRI , Yuni Wachid Asrori, M.A. ETD The methods of this study are literature study from relevant books to the topic, data collection from company, and interview with company�s staffs. Raw material is the most important thing in the production process. Material Requirement Planning (MRP) is a company strategy for raw material planning, so that the company wouldn�t shortage and excess of raw materials. Based on the results of this study concluded that the process that the process of making Material Requirement Planning (MRP) in PT. Komitrando Emporio requires two interrelated phases are Master Planning Schedule (MPS) and Bill of Materials (BOM). In the process of making the implementation of MRP there are still have problem. The problem is about how to manage the raw materials that the bag is still not well, because during the production process many raw materials that have been prepared depleted, disappear, and some raw materials has not arrived at this company. [Yogyakarta] : Universitas Gadjah Mada 2014 Thesis NonPeerReviewed , DWIOCTA SYAFITRI and , Yuni Wachid Asrori, M.A. (2014) PEMBUATAN PERENCANAAN BAHAN BAKU ATAU MRP (MATERIAL REQUIREMENT PLANNING) DAN KENDALA PADA PRODUKSI TAS ADIDAS FIBA1011 BULAN JANUARI DI PT.KOMITRANDO EMPORIO YOGYAKARTA. UNSPECIFIED thesis, UNSPECIFIED. http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=69390 |
institution |
Universitas Gadjah Mada |
building |
UGM Library |
country |
Indonesia |
collection |
Repository Civitas UGM |
topic |
ETD |
spellingShingle |
ETD , DWIOCTA SYAFITRI , Yuni Wachid Asrori, M.A. PEMBUATAN PERENCANAAN BAHAN BAKU ATAU MRP (MATERIAL REQUIREMENT PLANNING) DAN KENDALA PADA PRODUKSI TAS ADIDAS FIBA1011 BULAN JANUARI DI PT.KOMITRANDO EMPORIO YOGYAKARTA |
description |
The methods of this study are literature study from relevant books to the topic,
data collection from company, and interview with company�s staffs. Raw material is
the most important thing in the production process. Material Requirement Planning
(MRP) is a company strategy for raw material planning, so that the company
wouldn�t shortage and excess of raw materials.
Based on the results of this study concluded that the process that the process
of making Material Requirement Planning (MRP) in PT. Komitrando Emporio
requires two interrelated phases are Master Planning Schedule (MPS) and Bill of
Materials (BOM). In the process of making the implementation of MRP there are still
have problem. The problem is about how to manage the raw materials that the bag is
still not well, because during the production process many raw materials that have
been prepared depleted, disappear, and some raw materials has not arrived at this
company. |
format |
Theses and Dissertations NonPeerReviewed |
author |
, DWIOCTA SYAFITRI , Yuni Wachid Asrori, M.A. |
author_facet |
, DWIOCTA SYAFITRI , Yuni Wachid Asrori, M.A. |
author_sort |
, DWIOCTA SYAFITRI |
title |
PEMBUATAN PERENCANAAN BAHAN BAKU ATAU MRP (MATERIAL REQUIREMENT PLANNING) DAN KENDALA PADA PRODUKSI TAS ADIDAS FIBA1011 BULAN JANUARI DI PT.KOMITRANDO EMPORIO YOGYAKARTA |
title_short |
PEMBUATAN PERENCANAAN BAHAN BAKU ATAU MRP (MATERIAL REQUIREMENT PLANNING) DAN KENDALA PADA PRODUKSI TAS ADIDAS FIBA1011 BULAN JANUARI DI PT.KOMITRANDO EMPORIO YOGYAKARTA |
title_full |
PEMBUATAN PERENCANAAN BAHAN BAKU ATAU MRP (MATERIAL REQUIREMENT PLANNING) DAN KENDALA PADA PRODUKSI TAS ADIDAS FIBA1011 BULAN JANUARI DI PT.KOMITRANDO EMPORIO YOGYAKARTA |
title_fullStr |
PEMBUATAN PERENCANAAN BAHAN BAKU ATAU MRP (MATERIAL REQUIREMENT PLANNING) DAN KENDALA PADA PRODUKSI TAS ADIDAS FIBA1011 BULAN JANUARI DI PT.KOMITRANDO EMPORIO YOGYAKARTA |
title_full_unstemmed |
PEMBUATAN PERENCANAAN BAHAN BAKU ATAU MRP (MATERIAL REQUIREMENT PLANNING) DAN KENDALA PADA PRODUKSI TAS ADIDAS FIBA1011 BULAN JANUARI DI PT.KOMITRANDO EMPORIO YOGYAKARTA |
title_sort |
pembuatan perencanaan bahan baku atau mrp (material requirement planning) dan kendala pada produksi tas adidas fiba1011 bulan januari di pt.komitrando emporio yogyakarta |
publisher |
[Yogyakarta] : Universitas Gadjah Mada |
publishDate |
2014 |
url |
https://repository.ugm.ac.id/129015/ http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=69390 |
_version_ |
1681232897059586048 |