EVALUASI KINERJA PENYULANG MEDARI 7 SETELAH PEMINDAHAN WILAYAH BEBAN DI SAMIGALUH DAN KALIBAWANG

Medari substation has two transformers, with each capacity of 30 MVA. Transformers III connected with MDI-7 feeder that supplies the area of Sleman and Wates. In 2011, feeder MDI-7 serve the load in the Wates area after take it from feeder WT-5. This load is in Kalibawang and Samigaluh region, which...

Full description

Saved in:
Bibliographic Details
Main Authors: , SATRIO AGUNG NUGROHO, , Ir. M. Isnaeni, B.S., M.T
Format: Theses and Dissertations NonPeerReviewed
Published: [Yogyakarta] : Universitas Gadjah Mada 2014
Subjects:
ETD
Online Access:https://repository.ugm.ac.id/130647/
http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=71073
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universitas Gadjah Mada