EVALUASI KINERJA PENYULANG MEDARI 7 SETELAH PEMINDAHAN WILAYAH BEBAN DI SAMIGALUH DAN KALIBAWANG
Medari substation has two transformers, with each capacity of 30 MVA. Transformers III connected with MDI-7 feeder that supplies the area of Sleman and Wates. In 2011, feeder MDI-7 serve the load in the Wates area after take it from feeder WT-5. This load is in Kalibawang and Samigaluh region, which...