PENENTUAN WAKTU ISTIRAHAT PEKERJA PEMBUATAN TEMPE �MUCHLAR� BERDASARKAN KRITERIA FISIOLOGIS
Tempe Murni Muchlar Industry is a home-based industry since 1985 and now engaged in the business of the making of tempe with traditional processing in the area of Kasihan, Bantul, Yogyakarta. The business owned by Mr. H. Muchlar and he has 10 employees, where the workers are doing activities of raw...
Saved in:
Main Authors: | , AGRA ZULFANUDDIN, , Ir. Guntarti Tatik Mulyati, MT. |
---|---|
Format: | Theses and Dissertations NonPeerReviewed |
Published: |
[Yogyakarta] : Universitas Gadjah Mada
2014
|
Subjects: | |
Online Access: | https://repository.ugm.ac.id/132038/ http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=72554 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universitas Gadjah Mada |
Similar Items
-
PENENTUAN JUMLAH PEKERJA BERDASARKAN WAKTU BAKU (Studi di Bagian Produksi GNP Snack, Muntilan)
by: , RHAMADHANI RIO SATRIA NOVRIAN, et al.
Published: (2013) -
ANALISIS CAPACITY CONSTRAINED WORKER (CCW) DENGAN PENDEKATAN WAKTU BAKU DAN DENYUT JANTUNG PEKERJA (STUDI PADA : INDUSTRI TEMPE �MUCHLAR�KASIHAN BANTUL
YOGYAKARTA)
by: , MAMAN ZURIWIATMA, et al.
Published: (2013) -
PENENTUAN JUMLAH TENAGA KERJA DAN MESIN PADA PROSES PRODUKSI MIE LETHEK DI UD REVOLUSI DENGAN MENGGUNAKAN DATA STUDI WAKTU
by: , IVAN YOSPRIMA, et al.
Published: (2014) -
PENENTUAN LAMA WAKTU ISTIRAHAT BAGI PEKERJA UNIT FORMULASI, WAREHOUSE DAN WASTE WATER TREATMENT DI PT. DU PONT AGRICULTURAL PRODUCTS INDONESIA
by: RISKA WAHYUNINGTIAS UTAMI, 101310113037
Published: (2016) -
PENGARUH LAMA DAN INTERVAL ISTIRAHAT TERHADAP PRODUKTIVITAS PEKERJA
by: , MAHRUS KHOIRUL UMAMI, et al.
Published: (2011)