DETAIL ENGINEERING DRAWING PEMBUATAN CONVEYOR PADA TOSO TRAINING ROOM 6*0A PROJECT DI PT. TOYOTA MOTOR MANUFACTURING INDONESIA KARAWANG � JAWA BARAT

The quality of each unit produced by Toyota is a priority that makes Toyota became the primary car choice of Indonesian society. To maintain the quality of each unit that produced by Toyota, need a perfect end result and have high competitiveness. One of the external factors which attract the consum...

Full description

Saved in:
Bibliographic Details
Main Authors: , ASTRI RATNA SARI, , Hidayat Nur Isnianto, S.T., M.Eng.
Format: Theses and Dissertations NonPeerReviewed
Published: [Yogyakarta] : Universitas Gadjah Mada 2014
Subjects:
ETD
Online Access:https://repository.ugm.ac.id/132141/
http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=72659
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universitas Gadjah Mada
Description
Summary:The quality of each unit produced by Toyota is a priority that makes Toyota became the primary car choice of Indonesian society. To maintain the quality of each unit that produced by Toyota, need a perfect end result and have high competitiveness. One of the external factors which attract the consumers is the color of unit. To produce the body paint color so it has to do the painting for several steps in order to produce attractive colors and durable. In addition to painting process is done automatically by the machine or robot, are also done manually by the operator. Where the skill and ability of each operator are different, then to achieve maximum results need to be simulated before works in the real line. Therefore needed a conveyor that capable to pulling a load body of the car and there is the equipments for painting process. In this case the process which will be simulated is the sealer process (seal distributing), frame tape ( mounting tape on the border of door), and spray booth ( spraying ). Conveyor is a mechanical system which has the function to moving things from one place to another. In this time the subject of conveyors that used is a simple conveyor in terms of both mechanic and electric material but was able to pull the load of the car body. In the training room there is three conveyors that every conveyor have an operational box and control systems of the three conveyors are set by a central control panel .