DETAIL ENGINEERING DRAWING PEMBUATAN CONVEYOR PADA TOSO TRAINING ROOM 6*0A PROJECT DI PT. TOYOTA MOTOR MANUFACTURING INDONESIA KARAWANG � JAWA BARAT
The quality of each unit produced by Toyota is a priority that makes Toyota became the primary car choice of Indonesian society. To maintain the quality of each unit that produced by Toyota, need a perfect end result and have high competitiveness. One of the external factors which attract the consum...
Saved in:
Main Authors: | , |
---|---|
Format: | Theses and Dissertations NonPeerReviewed |
Published: |
[Yogyakarta] : Universitas Gadjah Mada
2014
|
Subjects: | |
Online Access: | https://repository.ugm.ac.id/132141/ http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=72659 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universitas Gadjah Mada |
Summary: | The quality of each unit produced by Toyota is a priority that makes
Toyota became the primary car choice of Indonesian society. To maintain the
quality of each unit that produced by Toyota, need a perfect end result and have
high competitiveness. One of the external factors which attract the consumers is
the color of unit. To produce the body paint color so it has to do the painting for
several steps in order to produce attractive colors and durable.
In addition to painting process is done automatically by the machine or
robot, are also done manually by the operator. Where the skill and ability of each
operator are different, then to achieve maximum results need to be simulated
before works in the real line. Therefore needed a conveyor that capable to pulling
a load body of the car and there is the equipments for painting process. In this
case the process which will be simulated is the sealer process (seal distributing),
frame tape ( mounting tape on the border of door), and spray booth ( spraying ).
Conveyor is a mechanical system which has the function to moving things
from one place to another. In this time the subject of conveyors that used is a
simple conveyor in terms of both mechanic and electric material but was able to
pull the load of the car body. In the training room there is three conveyors that
every conveyor have an operational box and control systems of the three
conveyors are set by a central control panel . |
---|