EVALUASI BETON PASCA PENGECORAN PADA PROYEK PEMBANGUNAN QUEST HOTEL SOLO PT. ADHI KARYA (PERSERO) Tbk. � DIVISI KONSTRUKSI IV
Every process of building structure, especially in pouring process, therefore needs to repaired. Based on these problems it is necessary to check the postscasting concrete. Similarly, the Quest Hotel Solo project which is under the structure of the work. It aims to assess the results of casting to t...
Saved in:
Main Authors: | , |
---|---|
Format: | Theses and Dissertations NonPeerReviewed |
Published: |
[Yogyakarta] : Universitas Gadjah Mada
2014
|
Subjects: | |
Online Access: | https://repository.ugm.ac.id/132179/ http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=72699 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universitas Gadjah Mada |
id |
id-ugm-repo.132179 |
---|---|
record_format |
dspace |
spelling |
id-ugm-repo.1321792016-03-04T07:52:04Z https://repository.ugm.ac.id/132179/ EVALUASI BETON PASCA PENGECORAN PADA PROYEK PEMBANGUNAN QUEST HOTEL SOLO PT. ADHI KARYA (PERSERO) Tbk. � DIVISI KONSTRUKSI IV , ANANDA APRILIA SUKOR , Edi Kurniadi, ST.,MT. ETD Every process of building structure, especially in pouring process, therefore needs to repaired. Based on these problems it is necessary to check the postscasting concrete. Similarly, the Quest Hotel Solo project which is under the structure of the work. It aims to assess the results of casting to the planning standards to get quality concrete quality according to plan. In this project used concrete K-300 with slump value of 12 ± 2 cm. The evaluation process uses a method of Non-Conformance Report (NCR), which reports the discrepancies the failure to meet the requirements of casting concrete results. visual concrete evaluation, judged by physical form concrete form work when unloaded. Based on the evaluation during the study, the results of casting concrete which fulfill the requirements or not there is a defect, will be continued on the next job. While the results were classified as non conformance (NC) as porous, less average casting results, there is dirt and so forth, then the evaluation carried out for improvement. NC porous column is a common postcasting, so that part of the loss must be done immediately filling with cement paste to get better quality results. [Yogyakarta] : Universitas Gadjah Mada 2014 Thesis NonPeerReviewed , ANANDA APRILIA SUKOR and , Edi Kurniadi, ST.,MT. (2014) EVALUASI BETON PASCA PENGECORAN PADA PROYEK PEMBANGUNAN QUEST HOTEL SOLO PT. ADHI KARYA (PERSERO) Tbk. � DIVISI KONSTRUKSI IV. UNSPECIFIED thesis, UNSPECIFIED. http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=72699 |
institution |
Universitas Gadjah Mada |
building |
UGM Library |
country |
Indonesia |
collection |
Repository Civitas UGM |
topic |
ETD |
spellingShingle |
ETD , ANANDA APRILIA SUKOR , Edi Kurniadi, ST.,MT. EVALUASI BETON PASCA PENGECORAN PADA PROYEK PEMBANGUNAN QUEST HOTEL SOLO PT. ADHI KARYA (PERSERO) Tbk. � DIVISI KONSTRUKSI IV |
description |
Every process of building structure, especially in pouring process, therefore
needs to repaired. Based on these problems it is necessary to check the postscasting
concrete. Similarly, the Quest Hotel Solo project which is under the structure of the
work. It aims to assess the results of casting to the planning standards to get quality
concrete quality according to plan. In this project used concrete K-300 with slump
value of 12 ± 2 cm.
The evaluation process uses a method of Non-Conformance Report (NCR),
which reports the discrepancies the failure to meet the requirements of casting
concrete results. visual concrete evaluation, judged by physical form concrete form
work when unloaded.
Based on the evaluation during the study, the results of casting concrete
which fulfill the requirements or not there is a defect, will be continued on the next
job. While the results were classified as non conformance (NC) as porous, less
average casting results, there is dirt and so forth, then the evaluation carried out for
improvement. NC porous column is a common postcasting, so that part of the loss
must be done immediately filling with cement paste to get better quality results. |
format |
Theses and Dissertations NonPeerReviewed |
author |
, ANANDA APRILIA SUKOR , Edi Kurniadi, ST.,MT. |
author_facet |
, ANANDA APRILIA SUKOR , Edi Kurniadi, ST.,MT. |
author_sort |
, ANANDA APRILIA SUKOR |
title |
EVALUASI BETON PASCA PENGECORAN PADA PROYEK PEMBANGUNAN QUEST HOTEL SOLO PT. ADHI KARYA (PERSERO) Tbk. � DIVISI KONSTRUKSI IV |
title_short |
EVALUASI BETON PASCA PENGECORAN PADA PROYEK PEMBANGUNAN QUEST HOTEL SOLO PT. ADHI KARYA (PERSERO) Tbk. � DIVISI KONSTRUKSI IV |
title_full |
EVALUASI BETON PASCA PENGECORAN PADA PROYEK PEMBANGUNAN QUEST HOTEL SOLO PT. ADHI KARYA (PERSERO) Tbk. � DIVISI KONSTRUKSI IV |
title_fullStr |
EVALUASI BETON PASCA PENGECORAN PADA PROYEK PEMBANGUNAN QUEST HOTEL SOLO PT. ADHI KARYA (PERSERO) Tbk. � DIVISI KONSTRUKSI IV |
title_full_unstemmed |
EVALUASI BETON PASCA PENGECORAN PADA PROYEK PEMBANGUNAN QUEST HOTEL SOLO PT. ADHI KARYA (PERSERO) Tbk. � DIVISI KONSTRUKSI IV |
title_sort |
evaluasi beton pasca pengecoran pada proyek pembangunan quest hotel solo pt. adhi karya (persero) tbk. � divisi konstruksi iv |
publisher |
[Yogyakarta] : Universitas Gadjah Mada |
publishDate |
2014 |
url |
https://repository.ugm.ac.id/132179/ http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=72699 |
_version_ |
1681233456252583936 |