PERENCANAAN PEMBANGUNAN PARKIR DAN URBAN PLAZA SEBAGAI KATALISATOR KAWASAN AMBARUKMO, SLEMAN
Ambarukmo region posseses several urban problems. The problems are road parkings that cause traffic jam, street vendors that occupy the pedestrian area, the cramped Nogopuro street, and the vile neighborhood. These problems need to be resolved through a development plan. Therefore, the development o...
Saved in:
Main Authors: | , |
---|---|
Format: | Theses and Dissertations NonPeerReviewed |
Published: |
[Yogyakarta] : Universitas Gadjah Mada
2014
|
Subjects: | |
Online Access: | https://repository.ugm.ac.id/132316/ http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=72844 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universitas Gadjah Mada |
id |
id-ugm-repo.132316 |
---|---|
record_format |
dspace |
spelling |
id-ugm-repo.1323162016-03-04T07:52:39Z https://repository.ugm.ac.id/132316/ PERENCANAAN PEMBANGUNAN PARKIR DAN URBAN PLAZA SEBAGAI KATALISATOR KAWASAN AMBARUKMO, SLEMAN , ARUJI SULAKSONO , Ir. Didik Kristiadi, MLA., MAUD. ETD Ambarukmo region posseses several urban problems. The problems are road parkings that cause traffic jam, street vendors that occupy the pedestrian area, the cramped Nogopuro street, and the vile neighborhood. These problems need to be resolved through a development plan. Therefore, the development of parking lot and urban plaza as the catalisator is urgently needed in order to boost up the growth of this area. The development project goes by the name of �Taman Tawon Ambarukmo�. The development plan is concepted on the urban catalyst. Urban catalyst is purposed to extend its effect to other areas by producing social and economical activity placed in the comercial development site. The effect is also meant to be accessible by foot or bike. Meanwhile, some activists also become magnet in this project for international batik trade, traditional foodcourt, crative economy, exhibition of industrial art and culture of Yogyakarta (gamelan, pantomime, painting, and fashion show). Moreover, this project is tested for its feasibility by using benefit cost ratio (BCR) and net present value (NPV). The calculated BCR value is 3.65 with NPV of Rp. 126,269,618,620,-. Needless to say, this project is feasible, economically beneficial, and directly or indirectly providing social impact. Keywords: Parking lot and Urban Plazz, Urban Catalisator, BCR and NPV [Yogyakarta] : Universitas Gadjah Mada 2014 Thesis NonPeerReviewed , ARUJI SULAKSONO and , Ir. Didik Kristiadi, MLA., MAUD. (2014) PERENCANAAN PEMBANGUNAN PARKIR DAN URBAN PLAZA SEBAGAI KATALISATOR KAWASAN AMBARUKMO, SLEMAN. UNSPECIFIED thesis, UNSPECIFIED. http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=72844 |
institution |
Universitas Gadjah Mada |
building |
UGM Library |
country |
Indonesia |
collection |
Repository Civitas UGM |
topic |
ETD |
spellingShingle |
ETD , ARUJI SULAKSONO , Ir. Didik Kristiadi, MLA., MAUD. PERENCANAAN PEMBANGUNAN PARKIR DAN URBAN PLAZA SEBAGAI KATALISATOR KAWASAN AMBARUKMO, SLEMAN |
description |
Ambarukmo region posseses several urban problems. The problems are road
parkings that cause traffic jam, street vendors that occupy the pedestrian area, the cramped
Nogopuro street, and the vile neighborhood. These problems need to be resolved through a
development plan. Therefore, the development of parking lot and urban plaza as the
catalisator is urgently needed in order to boost up the growth of this area. The development
project goes by the name of �Taman Tawon Ambarukmo�.
The development plan is concepted on the urban catalyst. Urban catalyst is
purposed to extend its effect to other areas by producing social and economical activity
placed in the comercial development site. The effect is also meant to be accessible by foot
or bike. Meanwhile, some activists also become magnet in this project for international
batik trade, traditional foodcourt, crative economy, exhibition of industrial art and culture
of Yogyakarta (gamelan, pantomime, painting, and fashion show).
Moreover, this project is tested for its feasibility by using benefit cost ratio (BCR)
and net present value (NPV). The calculated BCR value is 3.65 with NPV of Rp.
126,269,618,620,-. Needless to say, this project is feasible, economically beneficial, and
directly or indirectly providing social impact.
Keywords: Parking lot and Urban Plazz, Urban Catalisator, BCR and NPV |
format |
Theses and Dissertations NonPeerReviewed |
author |
, ARUJI SULAKSONO , Ir. Didik Kristiadi, MLA., MAUD. |
author_facet |
, ARUJI SULAKSONO , Ir. Didik Kristiadi, MLA., MAUD. |
author_sort |
, ARUJI SULAKSONO |
title |
PERENCANAAN PEMBANGUNAN PARKIR DAN URBAN PLAZA SEBAGAI KATALISATOR KAWASAN AMBARUKMO, SLEMAN |
title_short |
PERENCANAAN PEMBANGUNAN PARKIR DAN URBAN PLAZA SEBAGAI KATALISATOR KAWASAN AMBARUKMO, SLEMAN |
title_full |
PERENCANAAN PEMBANGUNAN PARKIR DAN URBAN PLAZA SEBAGAI KATALISATOR KAWASAN AMBARUKMO, SLEMAN |
title_fullStr |
PERENCANAAN PEMBANGUNAN PARKIR DAN URBAN PLAZA SEBAGAI KATALISATOR KAWASAN AMBARUKMO, SLEMAN |
title_full_unstemmed |
PERENCANAAN PEMBANGUNAN PARKIR DAN URBAN PLAZA SEBAGAI KATALISATOR KAWASAN AMBARUKMO, SLEMAN |
title_sort |
perencanaan pembangunan parkir dan urban plaza sebagai katalisator kawasan ambarukmo, sleman |
publisher |
[Yogyakarta] : Universitas Gadjah Mada |
publishDate |
2014 |
url |
https://repository.ugm.ac.id/132316/ http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=72844 |
_version_ |
1681233480831205376 |