PENGADAAN BARANG / JASA DAN PELAKSANAAN KONSTRUKSI PENINGKATAN KAPASITAS JALAN TOL PALIMANAN - KANCI

Traffic in highway keep increase so it is necessary to increase capacity, it is intended to drive swiftly, secure and comfortable accordance with PT. Jasa Marga vision and mission �give quality services in a optimal toll road to road users�. Increase capacity work includes the procurement of goo...

Full description

Saved in:
Bibliographic Details
Main Authors: , SHOFA SYAHIDI, , Dr. Eng. Iman Haryanto, MT.
Format: Theses and Dissertations NonPeerReviewed
Published: [Yogyakarta] : Universitas Gadjah Mada 2014
Subjects:
ETD
Online Access:https://repository.ugm.ac.id/132430/
http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=72964
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universitas Gadjah Mada
id id-ugm-repo.132430
record_format dspace
spelling id-ugm-repo.1324302016-03-04T08:12:32Z https://repository.ugm.ac.id/132430/ PENGADAAN BARANG / JASA DAN PELAKSANAAN KONSTRUKSI PENINGKATAN KAPASITAS JALAN TOL PALIMANAN - KANCI , SHOFA SYAHIDI , Dr. Eng. Iman Haryanto, MT. ETD Traffic in highway keep increase so it is necessary to increase capacity, it is intended to drive swiftly, secure and comfortable accordance with PT. Jasa Marga vision and mission �give quality services in a optimal toll road to road users�. Increase capacity work includes the procurement of goods / services and and physical work. Realization lane add at Km 222+550 to 223+000 track A on Palimanan � Kanci highway. The purpose of this research is know the scope of procurement activities and construction work on the capacity building of segment toll booths Cipema Utama. The method used is the method of observation is by direct observation of the implementation of the field work, literature study is a way to use some of the literature related to content writing reports reinforce, documentation is to take some photos of observation, interview method is to ask the stakeholders involved directly and also responsible for the technical problems in the field. The conclusion that can be drawn is the procurement of services electoral system uses pre-qualification, method 2 cover and use the evaluation system value. Construction using flexible pavement construction (flexible pavement). Work being tested (trialtest) is setting traffic signs, and pavement testing consists of, scrapping, filing, and core drill. [Yogyakarta] : Universitas Gadjah Mada 2014 Thesis NonPeerReviewed , SHOFA SYAHIDI and , Dr. Eng. Iman Haryanto, MT. (2014) PENGADAAN BARANG / JASA DAN PELAKSANAAN KONSTRUKSI PENINGKATAN KAPASITAS JALAN TOL PALIMANAN - KANCI. UNSPECIFIED thesis, UNSPECIFIED. http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=72964
institution Universitas Gadjah Mada
building UGM Library
country Indonesia
collection Repository Civitas UGM
topic ETD
spellingShingle ETD
, SHOFA SYAHIDI
, Dr. Eng. Iman Haryanto, MT.
PENGADAAN BARANG / JASA DAN PELAKSANAAN KONSTRUKSI PENINGKATAN KAPASITAS JALAN TOL PALIMANAN - KANCI
description Traffic in highway keep increase so it is necessary to increase capacity, it is intended to drive swiftly, secure and comfortable accordance with PT. Jasa Marga vision and mission �give quality services in a optimal toll road to road users�. Increase capacity work includes the procurement of goods / services and and physical work. Realization lane add at Km 222+550 to 223+000 track A on Palimanan � Kanci highway. The purpose of this research is know the scope of procurement activities and construction work on the capacity building of segment toll booths Cipema Utama. The method used is the method of observation is by direct observation of the implementation of the field work, literature study is a way to use some of the literature related to content writing reports reinforce, documentation is to take some photos of observation, interview method is to ask the stakeholders involved directly and also responsible for the technical problems in the field. The conclusion that can be drawn is the procurement of services electoral system uses pre-qualification, method 2 cover and use the evaluation system value. Construction using flexible pavement construction (flexible pavement). Work being tested (trialtest) is setting traffic signs, and pavement testing consists of, scrapping, filing, and core drill.
format Theses and Dissertations
NonPeerReviewed
author , SHOFA SYAHIDI
, Dr. Eng. Iman Haryanto, MT.
author_facet , SHOFA SYAHIDI
, Dr. Eng. Iman Haryanto, MT.
author_sort , SHOFA SYAHIDI
title PENGADAAN BARANG / JASA DAN PELAKSANAAN KONSTRUKSI PENINGKATAN KAPASITAS JALAN TOL PALIMANAN - KANCI
title_short PENGADAAN BARANG / JASA DAN PELAKSANAAN KONSTRUKSI PENINGKATAN KAPASITAS JALAN TOL PALIMANAN - KANCI
title_full PENGADAAN BARANG / JASA DAN PELAKSANAAN KONSTRUKSI PENINGKATAN KAPASITAS JALAN TOL PALIMANAN - KANCI
title_fullStr PENGADAAN BARANG / JASA DAN PELAKSANAAN KONSTRUKSI PENINGKATAN KAPASITAS JALAN TOL PALIMANAN - KANCI
title_full_unstemmed PENGADAAN BARANG / JASA DAN PELAKSANAAN KONSTRUKSI PENINGKATAN KAPASITAS JALAN TOL PALIMANAN - KANCI
title_sort pengadaan barang / jasa dan pelaksanaan konstruksi peningkatan kapasitas jalan tol palimanan - kanci
publisher [Yogyakarta] : Universitas Gadjah Mada
publishDate 2014
url https://repository.ugm.ac.id/132430/
http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=72964
_version_ 1681233501471375360