Prarancangan Pabrik Dimetil Formamid dari Metil Formiat dan Dimetil Amin Kapasitas 75000 Ton/Tahun

Dimethylformamide manufacturing process takes place in the flow stirred tank reactor. The reaction takes place in the gas phase with a temperature of 60ºC and a pressure of 5 atm. Due to the exothermic reaction of running, water used as a coolant. The need for water utilities include as much 55.056...

Full description

Saved in:
Bibliographic Details
Main Authors: , LARS STARNER REGEN, , Prof.Ir.Arief Budiman,M.S.,D.Eng
Format: Theses and Dissertations NonPeerReviewed
Published: [Yogyakarta] : Universitas Gadjah Mada 2014
Subjects:
ETD
Online Access:https://repository.ugm.ac.id/133062/
http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=73613
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universitas Gadjah Mada