Probabilistic Project Time Management: Integrating Risk Register and Project Schedule Network.

This paper presents a spreadsheet-based simulation model for analyzing project time management using probabilistic approach. The new feature in the proposed model is that the model recognizes the existence of risks and uncertainty and includes those factors directly on determining the lower-level pr...