HUBUNGAN MASA KERJA DAN TINGKAT KEBI
The Relationship of the Noisy Level and Working Time with the Value of Hearing Limitation and Hearing Disturbance Woman Worker's at Weaving Department PT. Samitex Yogyakarta PT. Samitex Yogyakarta is a company, who produces unbleached plain textile. In the production process, mainly in the wea...
Saved in:
Main Author: | Perpustakaan UGM, i-lib |
---|---|
Format: | Article NonPeerReviewed |
Published: |
[Yogyakarta] : Universitas Gadjah Mada
2005
|
Subjects: | |
Online Access: | https://repository.ugm.ac.id/26747/ http://i-lib.ugm.ac.id/jurnal/download.php?dataId=9788 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universitas Gadjah Mada |
Similar Items
-
Hubungan Masa Kerja Dengan Stres Kerja PadaPustakawan Perpustakaan Universitas Gadjaii Mada Yogyakarta
by: Perpustakaan UGM, i-lib
Published: (2006) -
Hubungan Lama Kerja, Masa Kerja, Dan Lokasi Kerja Dengan Kadar TimbalDalam Urin Petugas Pencatat Waktu Angkutan Kota Yogjakarta
by: Perpustakaan UGM, i-lib
Published: (2002) -
Re-Evaluasi Dan Masa Depan Hubungan
by: Perpustakaan UGM, i-lib
Published: (2004) -
Lembaga pemerintahan Tingkat pusat pada masa Gunapriyadharmapatni Dharmodayana warmadewa.
by: Perpustakaan UGM, i-lib
Published: (2002) -
Hubungan Mmasa Kerja dan Tingkat Kebisingan dengan Nilai Ambang Pendengaran dan Gangguan Pendengaran Tenaga Kerja Wanita pada Unit Tenun
by: Perpustakaan UGM, i-lib
Published: (2005)