Perhitungan Volume dan Sebaran Sedimentasi Waduk Sermo Berdasarkan Kondisi Awal Pembangunan dan Keadaan Terkini di Tahun 2016

Sermo Dam was built in the Hargowilis village, Kokap, Kulonprogo, DI Yogyakarta. The Dam is blocking river’s water flow of the Ngerancah river and several rivers in this area. It fills certain part of Hargowilis area with approximately 25 million cubic meters fresh water. Because of the water potent...

Full description

Saved in:
Bibliographic Details
Main Authors: Cahyono, Bambang Kun, Permadi, Oktavinno, Waljiyanto, Waljiyanto, Maharani, Rofika Dyah
Format: Conference or Workshop Item PeerReviewed
Language:English
Published: 2017
Subjects:
Online Access:https://repository.ugm.ac.id/274369/1/FullPaper_PerhitunganVolumeDanSebaranSedimentasiWadukSermoBerdasarkanKondisiAwalPembangunanDanKeadaanTerkiniDiTahun2016_BambangKun-Waljiyanto-Oktavinno-2.pdf
https://repository.ugm.ac.id/274369/
http://sntt.sv.ugm.ac.id/
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universitas Gadjah Mada
Language: English
id id-ugm-repo.274369
record_format dspace
spelling id-ugm-repo.2743692018-04-03T07:44:07Z https://repository.ugm.ac.id/274369/ Perhitungan Volume dan Sebaran Sedimentasi Waduk Sermo Berdasarkan Kondisi Awal Pembangunan dan Keadaan Terkini di Tahun 2016 Cahyono, Bambang Kun Permadi, Oktavinno Waljiyanto, Waljiyanto Maharani, Rofika Dyah Geomatic Engineering Sermo Dam was built in the Hargowilis village, Kokap, Kulonprogo, DI Yogyakarta. The Dam is blocking river’s water flow of the Ngerancah river and several rivers in this area. It fills certain part of Hargowilis area with approximately 25 million cubic meters fresh water. Because of the water potential and side view of the area, Sermo dam was developed to various beneficial function such as irrigation, fresh water needs for surrounding area, flooding and drying control, and tourism. Due to this mentioned functions, therefore good management and maintenance for the dam is needed. One of the problems that can not be avoided be cause of blocking rivers flow is sedimentation. If the sedimentation is uncontroled it will fill up the dam, and will reduce water storage capacity of the dam. To control the sedimentation, so some measurements must be executed to know the current condition and the acceleration of sedimentation. It is necessary to measure the volume of water storage and predict the sedimentation rate. This paper trying to determine volume of Sermo Dam water storage in 2016, and predict Sermo Dam sedimentation rate since it was first built (1996) to the present (2016). Based on resulted data it can be analysis using geospatial based data analysis, the volume of Sermo Dam water storage is 13,153,894.056 cubic meters (water level at 130 meter), and the rate of sedimentation acceleration in Sermo Dam is 184,569.687m3/year. In addition, spread of sedimentation patterns also served in the distribution map and profile changes of sedimentation 2017-11-11 Conference or Workshop Item PeerReviewed application/pdf en https://repository.ugm.ac.id/274369/1/FullPaper_PerhitunganVolumeDanSebaranSedimentasiWadukSermoBerdasarkanKondisiAwalPembangunanDanKeadaanTerkiniDiTahun2016_BambangKun-Waljiyanto-Oktavinno-2.pdf Cahyono, Bambang Kun and Permadi, Oktavinno and Waljiyanto, Waljiyanto and Maharani, Rofika Dyah (2017) Perhitungan Volume dan Sebaran Sedimentasi Waduk Sermo Berdasarkan Kondisi Awal Pembangunan dan Keadaan Terkini di Tahun 2016. In: Seminar Nasional Teknologi Terapan 2017, 11 November 2017, Sekolah Vokasi Universitas Gadjah Mada. http://sntt.sv.ugm.ac.id/
institution Universitas Gadjah Mada
building UGM Library
country Indonesia
collection Repository Civitas UGM
language English
topic Geomatic Engineering
spellingShingle Geomatic Engineering
Cahyono, Bambang Kun
Permadi, Oktavinno
Waljiyanto, Waljiyanto
Maharani, Rofika Dyah
Perhitungan Volume dan Sebaran Sedimentasi Waduk Sermo Berdasarkan Kondisi Awal Pembangunan dan Keadaan Terkini di Tahun 2016
description Sermo Dam was built in the Hargowilis village, Kokap, Kulonprogo, DI Yogyakarta. The Dam is blocking river’s water flow of the Ngerancah river and several rivers in this area. It fills certain part of Hargowilis area with approximately 25 million cubic meters fresh water. Because of the water potential and side view of the area, Sermo dam was developed to various beneficial function such as irrigation, fresh water needs for surrounding area, flooding and drying control, and tourism. Due to this mentioned functions, therefore good management and maintenance for the dam is needed. One of the problems that can not be avoided be cause of blocking rivers flow is sedimentation. If the sedimentation is uncontroled it will fill up the dam, and will reduce water storage capacity of the dam. To control the sedimentation, so some measurements must be executed to know the current condition and the acceleration of sedimentation. It is necessary to measure the volume of water storage and predict the sedimentation rate. This paper trying to determine volume of Sermo Dam water storage in 2016, and predict Sermo Dam sedimentation rate since it was first built (1996) to the present (2016). Based on resulted data it can be analysis using geospatial based data analysis, the volume of Sermo Dam water storage is 13,153,894.056 cubic meters (water level at 130 meter), and the rate of sedimentation acceleration in Sermo Dam is 184,569.687m3/year. In addition, spread of sedimentation patterns also served in the distribution map and profile changes of sedimentation
format Conference or Workshop Item
PeerReviewed
author Cahyono, Bambang Kun
Permadi, Oktavinno
Waljiyanto, Waljiyanto
Maharani, Rofika Dyah
author_facet Cahyono, Bambang Kun
Permadi, Oktavinno
Waljiyanto, Waljiyanto
Maharani, Rofika Dyah
author_sort Cahyono, Bambang Kun
title Perhitungan Volume dan Sebaran Sedimentasi Waduk Sermo Berdasarkan Kondisi Awal Pembangunan dan Keadaan Terkini di Tahun 2016
title_short Perhitungan Volume dan Sebaran Sedimentasi Waduk Sermo Berdasarkan Kondisi Awal Pembangunan dan Keadaan Terkini di Tahun 2016
title_full Perhitungan Volume dan Sebaran Sedimentasi Waduk Sermo Berdasarkan Kondisi Awal Pembangunan dan Keadaan Terkini di Tahun 2016
title_fullStr Perhitungan Volume dan Sebaran Sedimentasi Waduk Sermo Berdasarkan Kondisi Awal Pembangunan dan Keadaan Terkini di Tahun 2016
title_full_unstemmed Perhitungan Volume dan Sebaran Sedimentasi Waduk Sermo Berdasarkan Kondisi Awal Pembangunan dan Keadaan Terkini di Tahun 2016
title_sort perhitungan volume dan sebaran sedimentasi waduk sermo berdasarkan kondisi awal pembangunan dan keadaan terkini di tahun 2016
publishDate 2017
url https://repository.ugm.ac.id/274369/1/FullPaper_PerhitunganVolumeDanSebaranSedimentasiWadukSermoBerdasarkanKondisiAwalPembangunanDanKeadaanTerkiniDiTahun2016_BambangKun-Waljiyanto-Oktavinno-2.pdf
https://repository.ugm.ac.id/274369/
http://sntt.sv.ugm.ac.id/
_version_ 1681234413384368128