Primierly Study of Kinematic Analysis and Potential Prospection of Geothermal Mountain Pandan with Ordinary Kriging Method
In Indonesia, Geothermal has 312 potential points, 67 work areas, with total electricity generated 28,910 MWe. This paper discusses the geothermal system in Pandan mountain Bojonegoro regency. The method used is the study of previous research and then conducted surface mapping on the area that is...
Saved in:
Main Authors: | , , , , , |
---|---|
格式: | Article PeerReviewed |
語言: | English |
出版: |
Departemen Teknik Geologi
2018
|
主題: | |
在線閱讀: | https://repository.ugm.ac.id/274917/1/PTF-4_PRIMIERLY%20STUDY%20OF%20KINEMATIC%20ANALYSIS%20AND%20POTENTIAL%20PROSPECTION%20OF%20GEOTHERMAL%20MOUNTAIN%20PANDAN%20WITH%20ORDINARY%20KRIGING%20METHOD.pdf https://repository.ugm.ac.id/274917/ |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|