Usulan Penerapan Total Productive Maintenance (TPM) Office Menggunakan Overall Resource Equipment (ORE) untuk Mesin Air Jet Loom (AJL)
—PT XYZ is an Indonesian industrial company in Pekalongan district which manufactures sarong using an Air Jet Loom (AJL) machine. AJL machine is a machine that produces various types of textiles from warp yarns. The method used by Total Productive Maintenance (TPM) on the AJL machine to find out th...
Saved in:
Main Authors: | Maulana, Fachry Edwa, Atmaji, Fransiskus Tatas Dwi, Pamoso, Aji |
---|---|
Format: | Conference or Workshop Item NonPeerReviewed |
Language: | English |
Published: |
2020
|
Subjects: | |
Online Access: | https://repository.ugm.ac.id/276390/1/MSP%203_Fachry%20Edwa_Usulan%20Penerapan%20Total%20Productive%20Maintenance.pdf https://repository.ugm.ac.id/276390/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universitas Gadjah Mada |
Language: | English |
Similar Items
-
Overall Equipment Effectiveness pada Mesin Packer 641-PM1
by: Fauzi, Rifqi, et al.
Published: (2020) -
Implementation of the overall equipment cost loss (OECL) methodology for comparison with overall equipment effectiveness (OEE)
by: Ratapol Wudhikarn
Published: (2018) -
Implementation of the overall equipment cost loss (OECL) methodology for comparison with overall equipment effectiveness (OEE)
by: Wudhikarn R.
Published: (2017) -
Overall weighting equipment effectiveness
by: R. Wudhikarn
Published: (2018) -
Overall weighting equipment effectiveness
by: Wudhikarn R.
Published: (2014)