Sistem informasi biaya proyek berorientasi objek dengan memanfaatkan Unified Modeling Language (UML) :: Studi kasus pada PILARS ASSOCIATES Kontraktor, Jakarta
Saved in:
Main Authors: | , YUNIARTI, Wenty Dwi, , Dra. Sri Hartati, MSc.,PhD |
---|---|
Format: | Theses and Dissertations NonPeerReviewed |
Published: |
[Yogyakarta] : Universitas Gadjah Mada
2005
|
Subjects: | |
Online Access: | https://repository.ugm.ac.id/67038/ http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=27903 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universitas Gadjah Mada |
Similar Items
-
PEMODELAN BERORIENTASI OBJEK MENGGUNAKAN UNIFIED MODELING LANGUAGE UNTUK PENERAPAN SISTEM SELEKSI MAHASISWA BERPRESTASI DI LINGKUNGAN UNIVERSITAS SEMARANG
by: , TITIS HANDAYANI, et al.
Published: (2011) -
Pemodelan berorientasi objek menggunakan Objek Modeling Technique untuk sistem seleksi penerimaan pegawai
by: , ABDULLAH, Atje Setiawan, et al.
Published: (2004) -
Sistem informasi penggajian karyawan dengan analisis dan perancangan berorientasi objek
by: , DEWANTO, Adi, et al.
Published: (2004) -
Optimasi proses bisnis dengan penerapan metode orientasi objek berbasis UML (Unified Modelling System) :: Studi kasus PT Cendrawasih Ascapada Putera
by: , LISTIANINGSIH, Widias, et al.
Published: (2006) -
PERANAN ANGGARAN BIAYA PROYEK DAN ACTIVITY
SCHEDULING SEBAGAI KONTROL MANAJEMEN PADA
PELAKSANAAN PROYEK KONSTRUKSI PADA PERUSAHAAN
KONTRAKTOR CV. BANAWA RAYA DI PALU
by: DIMAS HENDRACIPTA, 040013272-B
Published: (2004)