EVALUASI KINERJA DAN PENGEMBANGAN TERMINAL PENUMPANG GAMALAMA KOTA TERNATE MALUKU UTARA
Passenger station is part of the transport system network which is needed by public means of transportation that it has dominant role and function in the system. Station Gamalama in Ternate is consideret as passenger station type C. This type of station needs special consideration, especially in its...
Saved in:
Main Authors: | , |
---|---|
Format: | Theses and Dissertations NonPeerReviewed |
Published: |
[Yogyakarta] : Universitas Gadjah Mada
2011
|
Subjects: | |
Online Access: | https://repository.ugm.ac.id/88328/ http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=50777 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universitas Gadjah Mada |
Summary: | Passenger station is part of the transport system network which is needed
by public means of transportation that it has dominant role and function in the
system. Station Gamalama in Ternate is consideret as passenger station type C.
This type of station needs special consideration, especially in its development
planning, due to its function as connector between urban and rural transportation.
This research analyzes the circulation of public transport facilities, the
average headway of public transport�s departure and arrival, the facility of
passenger and visitor, the traffic around the station, as well as the development of
the station itself.
The result of the analysis shows that the VC ratio of road network�s
performance around station Gamalama is 0.517. Type of public transport in
ternate is Suzuki Carry of which capacity is 8 passenger and its load factor 0.69.
The average headway of public transport which arriver and departs from Station
Gamalama is 27.3 second and 28,5 second. The average idle time of public
transport inside the station is 15.53 minutes per day. On the peak hours, the
average number of public transports to enter the station is 56 per 15 minutes. The
development of Station Gamalama is suggested in relation with its function as
Station type C. Based on the analysis, the total area needed for the development
of the station is 8.811 m2. |
---|