KAJIAN PEMANFAATAN BENDUNGAN TILONG DAN MATA AIR BAUMATA SEBAGAI SUMBER AIR BERSIH PDAM KUPANG PROVINSI NUSA TENGGARA TIMUR (STUDI KASUS WILAYAH IV DAN VII)

PDAM Kupang Regency has experienced losses in recent years. This is due the current distribution system can not meet customer needs and highly operational and maintenance costs. Meanwhile, on the one hand, there are two potential water resource as alternative raw water resource of PDAM Kupang regenc...

Full description

Saved in:
Bibliographic Details
Main Authors: , OKTAVIANUS PANDIE, , Prof. Dr. Ir. Radianta Triatmadja, Ph.D.
Format: Theses and Dissertations NonPeerReviewed
Published: [Yogyakarta] : Universitas Gadjah Mada 2011
Subjects:
ETD
Online Access:https://repository.ugm.ac.id/89553/
http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=51267
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universitas Gadjah Mada
id id-ugm-repo.89553
record_format dspace
spelling id-ugm-repo.895532014-08-20T02:53:06Z https://repository.ugm.ac.id/89553/ KAJIAN PEMANFAATAN BENDUNGAN TILONG DAN MATA AIR BAUMATA SEBAGAI SUMBER AIR BERSIH PDAM KUPANG PROVINSI NUSA TENGGARA TIMUR (STUDI KASUS WILAYAH IV DAN VII) , OKTAVIANUS PANDIE , Prof. Dr. Ir. Radianta Triatmadja, Ph.D. ETD PDAM Kupang Regency has experienced losses in recent years. This is due the current distribution system can not meet customer needs and highly operational and maintenance costs. Meanwhile, on the one hand, there are two potential water resource as alternative raw water resource of PDAM Kupang regency, i.e., Tilong Reservoir and Baumata Springs. Therefore, it required a utilization review on its technical and economic side of both potential sources of water. A review was conducted by comparing the existing and the planning condition. The existing conditions and new network planning modeling was analyzed by Waternet Software version 2.1, of total water demand is based estimated population in 2025 with a target service level of 50%. The economic feasibility Analysis of the new network was based on BCR value (bennefit cost ratio) by bennefit components were selling water to the new network and losses of existing condition, while the cost components were initial construction and operating costs and maintenance of new network. Modeling results indicate that alternative networks capable of distributing water to customers without rotation. Economically, new network planning is eligible to be built of design life over than 11 years. Assuming banking interest rate of 15%, new network planning gives BCR 1.1 on 11th year. [Yogyakarta] : Universitas Gadjah Mada 2011 Thesis NonPeerReviewed , OKTAVIANUS PANDIE and , Prof. Dr. Ir. Radianta Triatmadja, Ph.D. (2011) KAJIAN PEMANFAATAN BENDUNGAN TILONG DAN MATA AIR BAUMATA SEBAGAI SUMBER AIR BERSIH PDAM KUPANG PROVINSI NUSA TENGGARA TIMUR (STUDI KASUS WILAYAH IV DAN VII). UNSPECIFIED thesis, UNSPECIFIED. http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=51267
institution Universitas Gadjah Mada
building UGM Library
country Indonesia
collection Repository Civitas UGM
topic ETD
spellingShingle ETD
, OKTAVIANUS PANDIE
, Prof. Dr. Ir. Radianta Triatmadja, Ph.D.
KAJIAN PEMANFAATAN BENDUNGAN TILONG DAN MATA AIR BAUMATA SEBAGAI SUMBER AIR BERSIH PDAM KUPANG PROVINSI NUSA TENGGARA TIMUR (STUDI KASUS WILAYAH IV DAN VII)
description PDAM Kupang Regency has experienced losses in recent years. This is due the current distribution system can not meet customer needs and highly operational and maintenance costs. Meanwhile, on the one hand, there are two potential water resource as alternative raw water resource of PDAM Kupang regency, i.e., Tilong Reservoir and Baumata Springs. Therefore, it required a utilization review on its technical and economic side of both potential sources of water. A review was conducted by comparing the existing and the planning condition. The existing conditions and new network planning modeling was analyzed by Waternet Software version 2.1, of total water demand is based estimated population in 2025 with a target service level of 50%. The economic feasibility Analysis of the new network was based on BCR value (bennefit cost ratio) by bennefit components were selling water to the new network and losses of existing condition, while the cost components were initial construction and operating costs and maintenance of new network. Modeling results indicate that alternative networks capable of distributing water to customers without rotation. Economically, new network planning is eligible to be built of design life over than 11 years. Assuming banking interest rate of 15%, new network planning gives BCR 1.1 on 11th year.
format Theses and Dissertations
NonPeerReviewed
author , OKTAVIANUS PANDIE
, Prof. Dr. Ir. Radianta Triatmadja, Ph.D.
author_facet , OKTAVIANUS PANDIE
, Prof. Dr. Ir. Radianta Triatmadja, Ph.D.
author_sort , OKTAVIANUS PANDIE
title KAJIAN PEMANFAATAN BENDUNGAN TILONG DAN MATA AIR BAUMATA SEBAGAI SUMBER AIR BERSIH PDAM KUPANG PROVINSI NUSA TENGGARA TIMUR (STUDI KASUS WILAYAH IV DAN VII)
title_short KAJIAN PEMANFAATAN BENDUNGAN TILONG DAN MATA AIR BAUMATA SEBAGAI SUMBER AIR BERSIH PDAM KUPANG PROVINSI NUSA TENGGARA TIMUR (STUDI KASUS WILAYAH IV DAN VII)
title_full KAJIAN PEMANFAATAN BENDUNGAN TILONG DAN MATA AIR BAUMATA SEBAGAI SUMBER AIR BERSIH PDAM KUPANG PROVINSI NUSA TENGGARA TIMUR (STUDI KASUS WILAYAH IV DAN VII)
title_fullStr KAJIAN PEMANFAATAN BENDUNGAN TILONG DAN MATA AIR BAUMATA SEBAGAI SUMBER AIR BERSIH PDAM KUPANG PROVINSI NUSA TENGGARA TIMUR (STUDI KASUS WILAYAH IV DAN VII)
title_full_unstemmed KAJIAN PEMANFAATAN BENDUNGAN TILONG DAN MATA AIR BAUMATA SEBAGAI SUMBER AIR BERSIH PDAM KUPANG PROVINSI NUSA TENGGARA TIMUR (STUDI KASUS WILAYAH IV DAN VII)
title_sort kajian pemanfaatan bendungan tilong dan mata air baumata sebagai sumber air bersih pdam kupang provinsi nusa tenggara timur (studi kasus wilayah iv dan vii)
publisher [Yogyakarta] : Universitas Gadjah Mada
publishDate 2011
url https://repository.ugm.ac.id/89553/
http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=51267
_version_ 1681228799130206208