STUDI SISTEM MONITORING JARINGAN PDAM DAN RANCANG BANGUN MONITORING PLTMH PADA BAK PELEPAS TEKAN IV PDAM KOTA MALANG
Micro hydro as one of the current renewable energy power plants can be used as an alternative energy for areas that have not been powered by PLN. The constructiom does not always require a high cost, one of the solution is to utilize the Water Release Chamber owned by PDAM. In this research takes pl...
Saved in:
Main Authors: | , |
---|---|
Format: | Theses and Dissertations NonPeerReviewed |
Published: |
[Yogyakarta] : Universitas Gadjah Mada
2011
|
Subjects: | |
Online Access: | https://repository.ugm.ac.id/89601/ http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=51461 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|