OPTIMALISASI DAN RANCANGAN SISTEM PROTEKSI PENUTUP BALIK OTOMATIS (RECLOSER) JARINGAN DISTRIBUSI LISTRIK 1 FASE DAYA 3KW PADA PLTMh SINGOSAREN WUKIRSARI IMOGIRI BANTUL YOGYAKARTA (Berbasis Mikrokontroler ATmega16)

MHP began many built in several areas but to obtain security comfort electrically to the load-more (overload) or other disorders that are still desperately needed extreme protective equipment that can prevent damage to the generator so that the continuity of electricity distribution services is well...

Full description

Saved in:
Bibliographic Details
Main Authors: , IMAM SYAFI'I, , Prof.(Emr). Adhi Susanto, M.Sc., Ph.D.
Format: Theses and Dissertations NonPeerReviewed
Published: [Yogyakarta] : Universitas Gadjah Mada 2011
Subjects:
ETD
Online Access:https://repository.ugm.ac.id/90079/
http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=52417
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universitas Gadjah Mada