PENGARUH PENAMBANGAN GALIAN C DI SUNGAI SOMBE DAN SUNGAI LEWARA TERHADAP SISTEM PENGENDALIAN ALIRAN DEBRIS

Sombe River and Lewara River is a torrent river where the bottom slope in the upstream is relatively steep and the debris flow could potentially occur. As a debris flow mitigation efforts, there are 6 units of check dams in the Sombe River and 2 units in the Lewara River. The development of physical...

Full description

Saved in:
Bibliographic Details
Main Authors: , Yanty Ardhyanti Bawias, , Prof. Dr. Ir. Djoko Legono
Format: Theses and Dissertations NonPeerReviewed
Published: [Yogyakarta] : Universitas Gadjah Mada 2011
Subjects:
ETD
Online Access:https://repository.ugm.ac.id/90264/
http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=52777
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universitas Gadjah Mada
id id-ugm-repo.90264
record_format dspace
spelling id-ugm-repo.902642014-08-20T02:54:25Z https://repository.ugm.ac.id/90264/ PENGARUH PENAMBANGAN GALIAN C DI SUNGAI SOMBE DAN SUNGAI LEWARA TERHADAP SISTEM PENGENDALIAN ALIRAN DEBRIS , Yanty Ardhyanti Bawias , Prof. Dr. Ir. Djoko Legono ETD Sombe River and Lewara River is a torrent river where the bottom slope in the upstream is relatively steep and the debris flow could potentially occur. As a debris flow mitigation efforts, there are 6 units of check dams in the Sombe River and 2 units in the Lewara River. The development of physical infrastructure caused the material needs also increased. Excessive material exploitation may cause the environmental damage (degradation) including the defect of sediment control dam, so therefore the sediment balance management needs to be done. This study aims to assess the sediment balance based on the estimated of sediment flowing from the Sombe River and Lewara River upstream to the meeting point of the two rivers (control points). The analysis of the sediment inflow volume was approached with Takahashi (1991) and Mizuyama (1977) empirical formula while the sediment outflow volume was approached with Shimoda (1995) empirical formula. The balance simulation result is used to determine the ability of existing check dam in controlling the sediment inflow volume without mining activities and if mining activities occur. The results obtained that the sediment balance without any mining activities that accounted by volume of sediment inflow assuming with rainfall limit 10 mm to 60 mm per day can lead to sediment runoff at the control points. The sediment inflow volume that can be controlled by checkdam is 10.22% to 70.70%. In the condition of mining activities occured, the sediment runoff developed at the control points that accounted by volume of sediment inflow assuming rainfall limit 10 mm to 40 mm per day. The sediment inflow volume that can be controlled by checkdam capacity and reduced by mining activity is 23,64% to 84,23%. Optimization functions of the existing sediment control dam by returning the storage capacity and effecting the checkdam control function can improve the ability of structural mitigation of debris flow disaster. [Yogyakarta] : Universitas Gadjah Mada 2011 Thesis NonPeerReviewed , Yanty Ardhyanti Bawias and , Prof. Dr. Ir. Djoko Legono (2011) PENGARUH PENAMBANGAN GALIAN C DI SUNGAI SOMBE DAN SUNGAI LEWARA TERHADAP SISTEM PENGENDALIAN ALIRAN DEBRIS. UNSPECIFIED thesis, UNSPECIFIED. http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=52777
institution Universitas Gadjah Mada
building UGM Library
country Indonesia
collection Repository Civitas UGM
topic ETD
spellingShingle ETD
, Yanty Ardhyanti Bawias
, Prof. Dr. Ir. Djoko Legono
PENGARUH PENAMBANGAN GALIAN C DI SUNGAI SOMBE DAN SUNGAI LEWARA TERHADAP SISTEM PENGENDALIAN ALIRAN DEBRIS
description Sombe River and Lewara River is a torrent river where the bottom slope in the upstream is relatively steep and the debris flow could potentially occur. As a debris flow mitigation efforts, there are 6 units of check dams in the Sombe River and 2 units in the Lewara River. The development of physical infrastructure caused the material needs also increased. Excessive material exploitation may cause the environmental damage (degradation) including the defect of sediment control dam, so therefore the sediment balance management needs to be done. This study aims to assess the sediment balance based on the estimated of sediment flowing from the Sombe River and Lewara River upstream to the meeting point of the two rivers (control points). The analysis of the sediment inflow volume was approached with Takahashi (1991) and Mizuyama (1977) empirical formula while the sediment outflow volume was approached with Shimoda (1995) empirical formula. The balance simulation result is used to determine the ability of existing check dam in controlling the sediment inflow volume without mining activities and if mining activities occur. The results obtained that the sediment balance without any mining activities that accounted by volume of sediment inflow assuming with rainfall limit 10 mm to 60 mm per day can lead to sediment runoff at the control points. The sediment inflow volume that can be controlled by checkdam is 10.22% to 70.70%. In the condition of mining activities occured, the sediment runoff developed at the control points that accounted by volume of sediment inflow assuming rainfall limit 10 mm to 40 mm per day. The sediment inflow volume that can be controlled by checkdam capacity and reduced by mining activity is 23,64% to 84,23%. Optimization functions of the existing sediment control dam by returning the storage capacity and effecting the checkdam control function can improve the ability of structural mitigation of debris flow disaster.
format Theses and Dissertations
NonPeerReviewed
author , Yanty Ardhyanti Bawias
, Prof. Dr. Ir. Djoko Legono
author_facet , Yanty Ardhyanti Bawias
, Prof. Dr. Ir. Djoko Legono
author_sort , Yanty Ardhyanti Bawias
title PENGARUH PENAMBANGAN GALIAN C DI SUNGAI SOMBE DAN SUNGAI LEWARA TERHADAP SISTEM PENGENDALIAN ALIRAN DEBRIS
title_short PENGARUH PENAMBANGAN GALIAN C DI SUNGAI SOMBE DAN SUNGAI LEWARA TERHADAP SISTEM PENGENDALIAN ALIRAN DEBRIS
title_full PENGARUH PENAMBANGAN GALIAN C DI SUNGAI SOMBE DAN SUNGAI LEWARA TERHADAP SISTEM PENGENDALIAN ALIRAN DEBRIS
title_fullStr PENGARUH PENAMBANGAN GALIAN C DI SUNGAI SOMBE DAN SUNGAI LEWARA TERHADAP SISTEM PENGENDALIAN ALIRAN DEBRIS
title_full_unstemmed PENGARUH PENAMBANGAN GALIAN C DI SUNGAI SOMBE DAN SUNGAI LEWARA TERHADAP SISTEM PENGENDALIAN ALIRAN DEBRIS
title_sort pengaruh penambangan galian c di sungai sombe dan sungai lewara terhadap sistem pengendalian aliran debris
publisher [Yogyakarta] : Universitas Gadjah Mada
publishDate 2011
url https://repository.ugm.ac.id/90264/
http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=52777
_version_ 1681228932398972928