REHABILITASI KAWASAN RUTAN PELAIHARI KALIMANTAN SELATAN (Forest Rehabilitation at Pelaihari. South Kalimantan)

<p>The plantation forest (HTI) at Pelaihari. South Kalimantan was developed by PT. INHUTANIIII in<br /> forest area functioning as permanent production forest, with designated a total area of 27 5000 ha. Up<br /> untill now it has been established around 13 000 ha plantation of Aca...

Full description

Saved in:
Bibliographic Details
Main Author: , Soeyoto Wongsoredjo
Format: Article NonPeerReviewed
Published: [Yogyakarta] : Fak. Kehutanan UGM 2000
Online Access:https://repository.ugm.ac.id/94720/
http://repository.ugm.ac.id/digitasi/index.php?module=cari_hasil_full&idbuku=2519
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universitas Gadjah Mada
id id-ugm-repo.94720
record_format dspace
spelling id-ugm-repo.947202014-11-28T07:37:49Z https://repository.ugm.ac.id/94720/ REHABILITASI KAWASAN RUTAN PELAIHARI KALIMANTAN SELATAN (Forest Rehabilitation at Pelaihari. South Kalimantan) , Soeyoto Wongsoredjo <p>The plantation forest (HTI) at Pelaihari. South Kalimantan was developed by PT. INHUTANIIII in<br /> forest area functioning as permanent production forest, with designated a total area of 27 5000 ha. Up<br /> untill now it has been established around 13 000 ha plantation of Acacia sp and Eucalyptus sp. At 5 - 7<br /> years of age the mean wood poduction is 100 mJ per ha.. The HTI project was funded using from<br /> reforestation fund. ADB loan and internal source. The objective of HTI project is to produce wood for<br /> sawn timber and pulp.<br /> To increase the productivity of forest land. the application of intensive silviculture is a must. One of<br /> the component of intesive silvikulture is the use of impoved seed. IHUTANI III has been actively<br /> cooperated with other research institutions to establsih seed orchards of Acacia mangium and Eucalyptus<br /> pellita.<br /> At the momentwe has been reengineeringour entire working area, including Pelaihari. It is intended to<br /> create our forest to become an economic unit which is autonomous without neglecting sustainable principles<br /> of forest management. The reeingineering of HTI at Pelaihari is used as a support to compile a<br /> document of policy planning program which is integral strategy of the company management in plantation<br /> forests.</p> [Yogyakarta] : Fak. Kehutanan UGM 2000 Article NonPeerReviewed , Soeyoto Wongsoredjo (2000) REHABILITASI KAWASAN RUTAN PELAIHARI KALIMANTAN SELATAN (Forest Rehabilitation at Pelaihari. South Kalimantan). text. http://repository.ugm.ac.id/digitasi/index.php?module=cari_hasil_full&idbuku=2519
institution Universitas Gadjah Mada
building UGM Library
country Indonesia
collection Repository Civitas UGM
description <p>The plantation forest (HTI) at Pelaihari. South Kalimantan was developed by PT. INHUTANIIII in<br /> forest area functioning as permanent production forest, with designated a total area of 27 5000 ha. Up<br /> untill now it has been established around 13 000 ha plantation of Acacia sp and Eucalyptus sp. At 5 - 7<br /> years of age the mean wood poduction is 100 mJ per ha.. The HTI project was funded using from<br /> reforestation fund. ADB loan and internal source. The objective of HTI project is to produce wood for<br /> sawn timber and pulp.<br /> To increase the productivity of forest land. the application of intensive silviculture is a must. One of<br /> the component of intesive silvikulture is the use of impoved seed. IHUTANI III has been actively<br /> cooperated with other research institutions to establsih seed orchards of Acacia mangium and Eucalyptus<br /> pellita.<br /> At the momentwe has been reengineeringour entire working area, including Pelaihari. It is intended to<br /> create our forest to become an economic unit which is autonomous without neglecting sustainable principles<br /> of forest management. The reeingineering of HTI at Pelaihari is used as a support to compile a<br /> document of policy planning program which is integral strategy of the company management in plantation<br /> forests.</p>
format Article
NonPeerReviewed
author , Soeyoto Wongsoredjo
spellingShingle , Soeyoto Wongsoredjo
REHABILITASI KAWASAN RUTAN PELAIHARI KALIMANTAN SELATAN (Forest Rehabilitation at Pelaihari. South Kalimantan)
author_facet , Soeyoto Wongsoredjo
author_sort , Soeyoto Wongsoredjo
title REHABILITASI KAWASAN RUTAN PELAIHARI KALIMANTAN SELATAN (Forest Rehabilitation at Pelaihari. South Kalimantan)
title_short REHABILITASI KAWASAN RUTAN PELAIHARI KALIMANTAN SELATAN (Forest Rehabilitation at Pelaihari. South Kalimantan)
title_full REHABILITASI KAWASAN RUTAN PELAIHARI KALIMANTAN SELATAN (Forest Rehabilitation at Pelaihari. South Kalimantan)
title_fullStr REHABILITASI KAWASAN RUTAN PELAIHARI KALIMANTAN SELATAN (Forest Rehabilitation at Pelaihari. South Kalimantan)
title_full_unstemmed REHABILITASI KAWASAN RUTAN PELAIHARI KALIMANTAN SELATAN (Forest Rehabilitation at Pelaihari. South Kalimantan)
title_sort rehabilitasi kawasan rutan pelaihari kalimantan selatan (forest rehabilitation at pelaihari. south kalimantan)
publisher [Yogyakarta] : Fak. Kehutanan UGM
publishDate 2000
url https://repository.ugm.ac.id/94720/
http://repository.ugm.ac.id/digitasi/index.php?module=cari_hasil_full&idbuku=2519
_version_ 1681229684900102144