EVALUASI PENYEBAB KEGAGALAN DAN PERBAIKAN STRUKTUR JEMBATAN RANGKA BAJA DENGAN BENTANG 54 M Studi Kasus Jembatan Perusahaan Daerah Air Minum (PDAM) di Sungai Cisadane Kabupaten Bogor
One of the failure indicator of a bridge is a large deflection. As the truss bridge was owned by Regional Water Company (PDAM) Bogor Regency with span 54 m has deflection 42,5 cm. It was occurred when the buffer removed before the bridge load test, where the deflection has exceed the maximum require...
Saved in:
Main Authors: | , |
---|---|
Format: | Theses and Dissertations NonPeerReviewed |
Published: |
[Yogyakarta] : Universitas Gadjah Mada
2012
|
Subjects: | |
Online Access: | https://repository.ugm.ac.id/99482/ http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=55983 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universitas Gadjah Mada |
Be the first to leave a comment!