PENGEMBANGAN MODEL HIDROLOGI-HIDRAULIKA UNTUK PENGENDALIAN BANJIR WILAYAH SUNGAI BENGAWAN SOLO HULU

Flood control of the upper Bengawan Solo River basin that conducted by the Wonogiri Reservoir authority is related to the decision making process for spillway gates opening operation so that excess outflow does not occur in the downstream area. The decision-making have to be done rapidly and accurat...

全面介紹

Saved in:
書目詳細資料
Main Authors: , Ridwan Fauzi Rakhman, , Dr. Ir. Rachmad Jayadi, M. Eng.
格式: Theses and Dissertations NonPeerReviewed
出版: [Yogyakarta] : Universitas Gadjah Mada 2012
主題:
ETD
在線閱讀:https://repository.ugm.ac.id/99489/
http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=55718
標簽: 添加標簽
沒有標簽, 成為第一個標記此記錄!