The Incorporation Of It System Of Quantity Surveying Profession

The Objectives of this study are to identify the causes of delays in construction delays. Based on the literature review and survey questionnaire of this research were carry out, there are total seven categories are take part in the causes of delays in construction industry, six factors that impact...

Full description

Saved in:
Bibliographic Details
Main Author: Yap, Hao Ying
Format: Thesis
Language:English
Published: 2014
Subjects:
Online Access:http://eprints.intimal.edu.my/1235/1/BQSI%2013.pdf
http://eprints.intimal.edu.my/1235/
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: INTI International University
Language: English
id my-inti-eprints.1235
record_format eprints
spelling my-inti-eprints.12352018-11-21T08:43:52Z http://eprints.intimal.edu.my/1235/ The Incorporation Of It System Of Quantity Surveying Profession Yap, Hao Ying T Technology (General) TA Engineering (General). Civil engineering (General) TH Building construction The Objectives of this study are to identify the causes of delays in construction delays. Based on the literature review and survey questionnaire of this research were carry out, there are total seven categories are take part in the causes of delays in construction industry, six factors that impacts of delays in construction project and fifteen ways to mitigate the construction delays. The survey questionnaires were distributed to the targeted respondents either in consultant, contractor or client/developer type of organization. All the three objectives in this study are fully achieved. The top five important factors that are chosen by three parties involved contributed to the causes of delays are shortage of labour, rework due to errors during construction, improper construction methods implement low productivity level of labours and ineffective planning and scheduling of projects. The impacts of delays the most common are time and cost overrun. The effective ways to mitigate the delays in construction are identified by the top five consist of frequent coordination between the parties involved, site management and supervision, proper project planning and scheduling, clear information and communication channels and effective strategic planning 2014-04-01 Thesis NonPeerReviewed text en http://eprints.intimal.edu.my/1235/1/BQSI%2013.pdf Yap, Hao Ying (2014) The Incorporation Of It System Of Quantity Surveying Profession. Other thesis, INTI INTERNATIONAL UNIVERSITY.
institution INTI International University
building INTI Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider INTI International University
content_source INTI Institutional Repository
url_provider http://eprints.intimal.edu.my
language English
topic T Technology (General)
TA Engineering (General). Civil engineering (General)
TH Building construction
spellingShingle T Technology (General)
TA Engineering (General). Civil engineering (General)
TH Building construction
Yap, Hao Ying
The Incorporation Of It System Of Quantity Surveying Profession
description The Objectives of this study are to identify the causes of delays in construction delays. Based on the literature review and survey questionnaire of this research were carry out, there are total seven categories are take part in the causes of delays in construction industry, six factors that impacts of delays in construction project and fifteen ways to mitigate the construction delays. The survey questionnaires were distributed to the targeted respondents either in consultant, contractor or client/developer type of organization. All the three objectives in this study are fully achieved. The top five important factors that are chosen by three parties involved contributed to the causes of delays are shortage of labour, rework due to errors during construction, improper construction methods implement low productivity level of labours and ineffective planning and scheduling of projects. The impacts of delays the most common are time and cost overrun. The effective ways to mitigate the delays in construction are identified by the top five consist of frequent coordination between the parties involved, site management and supervision, proper project planning and scheduling, clear information and communication channels and effective strategic planning
format Thesis
author Yap, Hao Ying
author_facet Yap, Hao Ying
author_sort Yap, Hao Ying
title The Incorporation Of It System Of Quantity Surveying Profession
title_short The Incorporation Of It System Of Quantity Surveying Profession
title_full The Incorporation Of It System Of Quantity Surveying Profession
title_fullStr The Incorporation Of It System Of Quantity Surveying Profession
title_full_unstemmed The Incorporation Of It System Of Quantity Surveying Profession
title_sort incorporation of it system of quantity surveying profession
publishDate 2014
url http://eprints.intimal.edu.my/1235/1/BQSI%2013.pdf
http://eprints.intimal.edu.my/1235/
_version_ 1644541427356532736