Cost Overrun in Construction Projects in Malaysia: A Study on Contractor Related Factors
In construction industry, the key to a successful project lies on the quality of works, completed within the stipulated time with the planned budget. However, unexpected situations from different parties involved may lead to the delay of the works that eventually affect the whole cost of the project...
Saved in:
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
INTI International University
2019
|
Subjects: | |
Online Access: | http://eprints.intimal.edu.my/1326/1/ij2019_52.pdf http://eprints.intimal.edu.my/1326/ https://intijournal.intimal.edu.my |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | INTI International University |
Language: | English |
id |
my-inti-eprints.1326 |
---|---|
record_format |
eprints |
spelling |
my-inti-eprints.13262024-04-19T06:31:58Z http://eprints.intimal.edu.my/1326/ Cost Overrun in Construction Projects in Malaysia: A Study on Contractor Related Factors Norul Izzati, M. Ashaari Mohd Amir Shazwan, Hashim Yong, Sheve Huey HD28 Management. Industrial Management HG Finance T Technology (General) TH Building construction In construction industry, the key to a successful project lies on the quality of works, completed within the stipulated time with the planned budget. However, unexpected situations from different parties involved may lead to the delay of the works that eventually affect the whole cost of the project. The contractor is always been the main party who is dealing with the actual construction scenario that may affect the overall process of the construction project. Hence, this paper aim to investigate the contractor related factors that lead to cost overrun in the Malaysian construction project in Malaysia. A quantitative method was employed in this research by obtaining the data from questionnaire survey to G7 contractors in Selangor. The data were analysed using statistic method and Relative Importance Index (RII) method. The results indicate that improper planning and poor site management ranked the main factors that affect the cost overrun in construction project. Therefore, the results of this study will be beneficial to the contractors in achieving effective cost performance in construction projects in Malaysia. INTI International University 2019 Article PeerReviewed text en cc_by_4 http://eprints.intimal.edu.my/1326/1/ij2019_52.pdf Norul Izzati, M. Ashaari and Mohd Amir Shazwan, Hashim and Yong, Sheve Huey (2019) Cost Overrun in Construction Projects in Malaysia: A Study on Contractor Related Factors. INTI JOURNAL, 2019 (52). ISSN e2600-7320 https://intijournal.intimal.edu.my |
institution |
INTI International University |
building |
INTI Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
INTI International University |
content_source |
INTI Institutional Repository |
url_provider |
http://eprints.intimal.edu.my |
language |
English |
topic |
HD28 Management. Industrial Management HG Finance T Technology (General) TH Building construction |
spellingShingle |
HD28 Management. Industrial Management HG Finance T Technology (General) TH Building construction Norul Izzati, M. Ashaari Mohd Amir Shazwan, Hashim Yong, Sheve Huey Cost Overrun in Construction Projects in Malaysia: A Study on Contractor Related Factors |
description |
In construction industry, the key to a successful project lies on the quality of works, completed within the stipulated time with the planned budget. However, unexpected situations from different parties involved may lead to the delay of the works that eventually affect the whole cost of the project. The contractor is always been the main party who is dealing with the actual construction scenario that may affect the overall process of the construction project. Hence, this paper aim to investigate the contractor related factors that lead to cost overrun in the Malaysian construction project in Malaysia. A quantitative method was employed in this research by obtaining the data from questionnaire survey to G7 contractors in Selangor. The data were analysed using statistic method and Relative Importance Index (RII) method. The results indicate that improper planning and poor site management ranked the main factors that affect the cost overrun in construction project. Therefore, the results of this study will be beneficial to the contractors in achieving effective cost performance in construction projects in Malaysia. |
format |
Article |
author |
Norul Izzati, M. Ashaari Mohd Amir Shazwan, Hashim Yong, Sheve Huey |
author_facet |
Norul Izzati, M. Ashaari Mohd Amir Shazwan, Hashim Yong, Sheve Huey |
author_sort |
Norul Izzati, M. Ashaari |
title |
Cost Overrun in Construction Projects in Malaysia: A Study on Contractor Related Factors |
title_short |
Cost Overrun in Construction Projects in Malaysia: A Study on Contractor Related Factors |
title_full |
Cost Overrun in Construction Projects in Malaysia: A Study on Contractor Related Factors |
title_fullStr |
Cost Overrun in Construction Projects in Malaysia: A Study on Contractor Related Factors |
title_full_unstemmed |
Cost Overrun in Construction Projects in Malaysia: A Study on Contractor Related Factors |
title_sort |
cost overrun in construction projects in malaysia: a study on contractor related factors |
publisher |
INTI International University |
publishDate |
2019 |
url |
http://eprints.intimal.edu.my/1326/1/ij2019_52.pdf http://eprints.intimal.edu.my/1326/ https://intijournal.intimal.edu.my |
_version_ |
1797548184999821312 |