Cost Overrun in Construction Projects in Malaysia: A Study on Contractor Related Factors

In construction industry, the key to a successful project lies on the quality of works, completed within the stipulated time with the planned budget. However, unexpected situations from different parties involved may lead to the delay of the works that eventually affect the whole cost of the project...

Full description

Saved in:
Bibliographic Details
Main Authors: Norul Izzati, M. Ashaari, Mohd Amir Shazwan, Hashim, Yong, Sheve Huey
Format: Article
Language:English
Published: INTI International University 2019
Subjects:
Online Access:http://eprints.intimal.edu.my/1326/1/ij2019_52.pdf
http://eprints.intimal.edu.my/1326/
https://intijournal.intimal.edu.my
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: INTI International University
Language: English
id my-inti-eprints.1326
record_format eprints
spelling my-inti-eprints.13262024-04-19T06:31:58Z http://eprints.intimal.edu.my/1326/ Cost Overrun in Construction Projects in Malaysia: A Study on Contractor Related Factors Norul Izzati, M. Ashaari Mohd Amir Shazwan, Hashim Yong, Sheve Huey HD28 Management. Industrial Management HG Finance T Technology (General) TH Building construction In construction industry, the key to a successful project lies on the quality of works, completed within the stipulated time with the planned budget. However, unexpected situations from different parties involved may lead to the delay of the works that eventually affect the whole cost of the project. The contractor is always been the main party who is dealing with the actual construction scenario that may affect the overall process of the construction project. Hence, this paper aim to investigate the contractor related factors that lead to cost overrun in the Malaysian construction project in Malaysia. A quantitative method was employed in this research by obtaining the data from questionnaire survey to G7 contractors in Selangor. The data were analysed using statistic method and Relative Importance Index (RII) method. The results indicate that improper planning and poor site management ranked the main factors that affect the cost overrun in construction project. Therefore, the results of this study will be beneficial to the contractors in achieving effective cost performance in construction projects in Malaysia. INTI International University 2019 Article PeerReviewed text en cc_by_4 http://eprints.intimal.edu.my/1326/1/ij2019_52.pdf Norul Izzati, M. Ashaari and Mohd Amir Shazwan, Hashim and Yong, Sheve Huey (2019) Cost Overrun in Construction Projects in Malaysia: A Study on Contractor Related Factors. INTI JOURNAL, 2019 (52). ISSN e2600-7320 https://intijournal.intimal.edu.my
institution INTI International University
building INTI Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider INTI International University
content_source INTI Institutional Repository
url_provider http://eprints.intimal.edu.my
language English
topic HD28 Management. Industrial Management
HG Finance
T Technology (General)
TH Building construction
spellingShingle HD28 Management. Industrial Management
HG Finance
T Technology (General)
TH Building construction
Norul Izzati, M. Ashaari
Mohd Amir Shazwan, Hashim
Yong, Sheve Huey
Cost Overrun in Construction Projects in Malaysia: A Study on Contractor Related Factors
description In construction industry, the key to a successful project lies on the quality of works, completed within the stipulated time with the planned budget. However, unexpected situations from different parties involved may lead to the delay of the works that eventually affect the whole cost of the project. The contractor is always been the main party who is dealing with the actual construction scenario that may affect the overall process of the construction project. Hence, this paper aim to investigate the contractor related factors that lead to cost overrun in the Malaysian construction project in Malaysia. A quantitative method was employed in this research by obtaining the data from questionnaire survey to G7 contractors in Selangor. The data were analysed using statistic method and Relative Importance Index (RII) method. The results indicate that improper planning and poor site management ranked the main factors that affect the cost overrun in construction project. Therefore, the results of this study will be beneficial to the contractors in achieving effective cost performance in construction projects in Malaysia.
format Article
author Norul Izzati, M. Ashaari
Mohd Amir Shazwan, Hashim
Yong, Sheve Huey
author_facet Norul Izzati, M. Ashaari
Mohd Amir Shazwan, Hashim
Yong, Sheve Huey
author_sort Norul Izzati, M. Ashaari
title Cost Overrun in Construction Projects in Malaysia: A Study on Contractor Related Factors
title_short Cost Overrun in Construction Projects in Malaysia: A Study on Contractor Related Factors
title_full Cost Overrun in Construction Projects in Malaysia: A Study on Contractor Related Factors
title_fullStr Cost Overrun in Construction Projects in Malaysia: A Study on Contractor Related Factors
title_full_unstemmed Cost Overrun in Construction Projects in Malaysia: A Study on Contractor Related Factors
title_sort cost overrun in construction projects in malaysia: a study on contractor related factors
publisher INTI International University
publishDate 2019
url http://eprints.intimal.edu.my/1326/1/ij2019_52.pdf
http://eprints.intimal.edu.my/1326/
https://intijournal.intimal.edu.my
_version_ 1797548184999821312