A Potential Study of Automation System in Industrialised Building System (IBS) in Enhancing Malaysian Construction Industry’s Performance
Automation is one of the advanced technologies which can be used for improving the efficiency and performance of construction projects in various aspects of the construction industry. Although the introduction of automation technologies can enhance efficiency, many manufacturers of the Malaysian...
Saved in:
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
INTI International University
2020
|
Subjects: | |
Online Access: | http://eprints.intimal.edu.my/1422/1/ij2020_14.pdf http://eprints.intimal.edu.my/1422/ http://intijournal.newinti.edu.my |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | INTI International University |
Language: | English |
id |
my-inti-eprints.1422 |
---|---|
record_format |
eprints |
spelling |
my-inti-eprints.14222024-03-18T04:14:07Z http://eprints.intimal.edu.my/1422/ A Potential Study of Automation System in Industrialised Building System (IBS) in Enhancing Malaysian Construction Industry’s Performance Siti Azira, Abd Rahim* Mohd Amir Shazwan, Hashim* Wong, Sook Shen T Technology (General) TH Building construction Automation is one of the advanced technologies which can be used for improving the efficiency and performance of construction projects in various aspects of the construction industry. Although the introduction of automation technologies can enhance efficiency, many manufacturers of the Malaysian Industrialized Building System (IBS) do not support the presence of automation technology. Construction-related IBS problems such as declining efficiency and productivity, labour shortages, weak occupational safety, and unsafe working environment have hindered the implementation of IBS in Malaysia, but have opened up opportunities for more practical ideas within the industry. Another prospective choice is to implement advanced building technology such as automation through the IBS, which has the potential to enhance the industry in terms of efficiency, protection, and quality and IBS adoption rate in Malaysia. Automation means replacement of human labours by machines; or the operation of a machine or device automatically, or remote control which enhanced productivity, quality and also reduce human efforts. This paper study on the potential implication of Automation through IBS in enhancing Malaysian construction industry’s performance. In order to achieve research goals, qualitative method is adopted which is through in-depth interview with industry experts. Content analysis and descriptive statistic is used to explore and categorize the opinions from professionals. The result is expected to provide a clearer understanding of the current construction problems facing the industry without the implementation of the Automation system in IBS, other than as a guidance for contractors to enhance their current approach and practise. INTI International University 2020-09 Article PeerReviewed text en cc_by_4 http://eprints.intimal.edu.my/1422/1/ij2020_14.pdf Siti Azira, Abd Rahim* and Mohd Amir Shazwan, Hashim* and Wong, Sook Shen (2020) A Potential Study of Automation System in Industrialised Building System (IBS) in Enhancing Malaysian Construction Industry’s Performance. INTI JOURNAL, 2020 (14). ISSN e2600-7320 http://intijournal.newinti.edu.my |
institution |
INTI International University |
building |
INTI Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
INTI International University |
content_source |
INTI Institutional Repository |
url_provider |
http://eprints.intimal.edu.my |
language |
English |
topic |
T Technology (General) TH Building construction |
spellingShingle |
T Technology (General) TH Building construction Siti Azira, Abd Rahim* Mohd Amir Shazwan, Hashim* Wong, Sook Shen A Potential Study of Automation System in Industrialised Building System (IBS) in Enhancing Malaysian Construction Industry’s Performance |
description |
Automation is one of the advanced technologies which can be used for improving the efficiency
and performance of construction projects in various aspects of the construction industry. Although
the introduction of automation technologies can enhance efficiency, many manufacturers of the
Malaysian Industrialized Building System (IBS) do not support the presence of automation
technology. Construction-related IBS problems such as declining efficiency and productivity,
labour shortages, weak occupational safety, and unsafe working environment have hindered the
implementation of IBS in Malaysia, but have opened up opportunities for more practical ideas
within the industry. Another prospective choice is to implement advanced building technology
such as automation through the IBS, which has the potential to enhance the industry in terms of
efficiency, protection, and quality and IBS adoption rate in Malaysia. Automation means
replacement of human labours by machines; or the operation of a machine or device automatically,
or remote control which enhanced productivity, quality and also reduce human efforts. This paper
study on the potential implication of Automation through IBS in enhancing Malaysian construction
industry’s performance. In order to achieve research goals, qualitative method is adopted which is
through in-depth interview with industry experts. Content analysis and descriptive statistic is used
to explore and categorize the opinions from professionals. The result is expected to provide a
clearer understanding of the current construction problems facing the industry without the
implementation of the Automation system in IBS, other than as a guidance for contractors to
enhance their current approach and practise. |
format |
Article |
author |
Siti Azira, Abd Rahim* Mohd Amir Shazwan, Hashim* Wong, Sook Shen |
author_facet |
Siti Azira, Abd Rahim* Mohd Amir Shazwan, Hashim* Wong, Sook Shen |
author_sort |
Siti Azira, Abd Rahim* |
title |
A Potential Study of Automation System in Industrialised Building System (IBS) in Enhancing Malaysian Construction Industry’s Performance |
title_short |
A Potential Study of Automation System in Industrialised Building System (IBS) in Enhancing Malaysian Construction Industry’s Performance |
title_full |
A Potential Study of Automation System in Industrialised Building System (IBS) in Enhancing Malaysian Construction Industry’s Performance |
title_fullStr |
A Potential Study of Automation System in Industrialised Building System (IBS) in Enhancing Malaysian Construction Industry’s Performance |
title_full_unstemmed |
A Potential Study of Automation System in Industrialised Building System (IBS) in Enhancing Malaysian Construction Industry’s Performance |
title_sort |
potential study of automation system in industrialised building system (ibs) in enhancing malaysian construction industry’s performance |
publisher |
INTI International University |
publishDate |
2020 |
url |
http://eprints.intimal.edu.my/1422/1/ij2020_14.pdf http://eprints.intimal.edu.my/1422/ http://intijournal.newinti.edu.my |
_version_ |
1794645201823727616 |