Implementation of Industrialised Building System (IBS) in Construction Industry Malaysia: A Study in Perlis

In Malaysia, the implementation of IBS still can be improved by giving encouragement among the developer in construction industry as there are still many states in Malaysia has very low IBS implementation such as Perlis. Therefore, it is importance for the government to have a plan to find out th...

Full description

Saved in:
Bibliographic Details
Main Author: Wong, Ng Ni
Format: Thesis
Language:English
Published: 2021
Subjects:
Online Access:http://eprints.intimal.edu.my/1558/1/Wong%20Ng%20Ni.pdf
http://eprints.intimal.edu.my/1558/
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: INTI International University
Language: English
id my-inti-eprints.1558
record_format eprints
spelling my-inti-eprints.15582021-10-13T13:09:08Z http://eprints.intimal.edu.my/1558/ Implementation of Industrialised Building System (IBS) in Construction Industry Malaysia: A Study in Perlis Wong, Ng Ni T Technology (General) TA Engineering (General). Civil engineering (General) In Malaysia, the implementation of IBS still can be improved by giving encouragement among the developer in construction industry as there are still many states in Malaysia has very low IBS implementation such as Perlis. Therefore, it is importance for the government to have a plan to find out the way in increasing the IBS implementation. On the other hand, government must not only focus on encouraging the companies to implement IBS, but also need to focus on the percentage of the IBS manufacturer exist in Malaysia. If a lot of companies implement IBS but there is lack of IBS manufacturer also no point for the companies to implement it. The implementation of IBS will actually bring a lot of benefits to the companies such as faster completion for a project, waste reduction on site and reduce pollution on site. These will ensure the project that come out is more valuable. However, there are some barriers which cause a lot of developer companies not to implement this IBS such as high initial cost, available of cheap foreign labour, lack of technical knowledge, lack of creativity in design, etc. All these barriers cause the percentage of IBS implementation in Malaysia still need to be improved. Therefore, some strategies were figure out which can be used to enhance the implementation of IBS such as raising awareness, benchmark of IBS technology or maximize value of IBS. Lastly, all the data will collecting by literature review and quantitative research method. Then, will analyzed by quantitative data analysis. 2021-01 Thesis NonPeerReviewed text en http://eprints.intimal.edu.my/1558/1/Wong%20Ng%20Ni.pdf Wong, Ng Ni (2021) Implementation of Industrialised Building System (IBS) in Construction Industry Malaysia: A Study in Perlis. Other thesis, INTI International University, Nilai, Malaysia.
institution INTI International University
building INTI Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider INTI International University
content_source INTI Institutional Repository
url_provider http://eprints.intimal.edu.my
language English
topic T Technology (General)
TA Engineering (General). Civil engineering (General)
spellingShingle T Technology (General)
TA Engineering (General). Civil engineering (General)
Wong, Ng Ni
Implementation of Industrialised Building System (IBS) in Construction Industry Malaysia: A Study in Perlis
description In Malaysia, the implementation of IBS still can be improved by giving encouragement among the developer in construction industry as there are still many states in Malaysia has very low IBS implementation such as Perlis. Therefore, it is importance for the government to have a plan to find out the way in increasing the IBS implementation. On the other hand, government must not only focus on encouraging the companies to implement IBS, but also need to focus on the percentage of the IBS manufacturer exist in Malaysia. If a lot of companies implement IBS but there is lack of IBS manufacturer also no point for the companies to implement it. The implementation of IBS will actually bring a lot of benefits to the companies such as faster completion for a project, waste reduction on site and reduce pollution on site. These will ensure the project that come out is more valuable. However, there are some barriers which cause a lot of developer companies not to implement this IBS such as high initial cost, available of cheap foreign labour, lack of technical knowledge, lack of creativity in design, etc. All these barriers cause the percentage of IBS implementation in Malaysia still need to be improved. Therefore, some strategies were figure out which can be used to enhance the implementation of IBS such as raising awareness, benchmark of IBS technology or maximize value of IBS. Lastly, all the data will collecting by literature review and quantitative research method. Then, will analyzed by quantitative data analysis.
format Thesis
author Wong, Ng Ni
author_facet Wong, Ng Ni
author_sort Wong, Ng Ni
title Implementation of Industrialised Building System (IBS) in Construction Industry Malaysia: A Study in Perlis
title_short Implementation of Industrialised Building System (IBS) in Construction Industry Malaysia: A Study in Perlis
title_full Implementation of Industrialised Building System (IBS) in Construction Industry Malaysia: A Study in Perlis
title_fullStr Implementation of Industrialised Building System (IBS) in Construction Industry Malaysia: A Study in Perlis
title_full_unstemmed Implementation of Industrialised Building System (IBS) in Construction Industry Malaysia: A Study in Perlis
title_sort implementation of industrialised building system (ibs) in construction industry malaysia: a study in perlis
publishDate 2021
url http://eprints.intimal.edu.my/1558/1/Wong%20Ng%20Ni.pdf
http://eprints.intimal.edu.my/1558/
_version_ 1715194504035696640