The proper ways of assessing damages for defective building works
Damages are one of the remedies available for a breach of contract. In these circumstances, defective building works constitute a breach of contract by the contractor. This article discusses the proper ways of assessing damages for defective building works. The article reveals three (3) possible...
Saved in:
Main Author: | |
---|---|
Format: | Article |
Published: |
Fakulti Undang - Undang
2006
|
Online Access: | http://journalarticle.ukm.my/1679/ http://ejournal.ukm.my/juum |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universiti Kebangsaan Malaysia |