GDC-UTP ELECTRICITY FORECASTING USING FUZZY SYSTEM
This report represents the approach for short term load forecasting by using fuzzy logic approach. As depicted in Chapter I, in order for Gas District Cooling to operate at maximum efficiency and minimum generating costs, it must be able to forecast the load demanded by the sole customer, Univers...
Saved in:
Main Author: | |
---|---|
Format: | Final Year Project |
Language: | English |
Published: |
Universiti Teknologi PETRONAS
2011
|
Subjects: | |
Online Access: | http://utpedia.utp.edu.my/10488/1/2011%20-%20GDC-UTP%20Electricity%20Forecasting%20using%20Fuzzy%20System.pdf http://utpedia.utp.edu.my/10488/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universiti Teknologi Petronas |
Language: | English |
id |
my-utp-utpedia.10488 |
---|---|
record_format |
eprints |
spelling |
my-utp-utpedia.104882017-01-25T09:42:22Z http://utpedia.utp.edu.my/10488/ GDC-UTP ELECTRICITY FORECASTING USING FUZZY SYSTEM Nordin, Farah Tasya TK Electrical engineering. Electronics Nuclear engineering This report represents the approach for short term load forecasting by using fuzzy logic approach. As depicted in Chapter I, in order for Gas District Cooling to operate at maximum efficiency and minimum generating costs, it must be able to forecast the load demanded by the sole customer, University Teknologi PETRONAS. Based on the literature review in Chapter 2, there are several fuctors that affect the forecasting such as weather condition, the type offorecast day and history of the load demand. In Chapter 3 of this report, this project proposes a load forecasting method by using fuzzy logic approach, based on similar days to obtain the next week's forecasted load. The fuzzyTECH software is used to develop a week-week-ahead load forecasting model together with Microsoft Excel as data interface. The test result, as shown in in Chapter 4, show that the proposed forecasting method could provide a considerable improvement of the forecasting accuracy especially as it shows how to reduce forecast error. Several recommendations for future improvements are included in Chapter 5. The suitability of the proposed approach is illustrated through an application to actual load data of the Gas District Cooling ofUniversity Teknologi PETRONAS. Universiti Teknologi PETRONAS 2011-05 Final Year Project NonPeerReviewed application/pdf en http://utpedia.utp.edu.my/10488/1/2011%20-%20GDC-UTP%20Electricity%20Forecasting%20using%20Fuzzy%20System.pdf Nordin, Farah Tasya (2011) GDC-UTP ELECTRICITY FORECASTING USING FUZZY SYSTEM. Universiti Teknologi PETRONAS. (Unpublished) |
institution |
Universiti Teknologi Petronas |
building |
UTP Resource Centre |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Teknologi Petronas |
content_source |
UTP Electronic and Digitized Intellectual Asset |
url_provider |
http://utpedia.utp.edu.my/ |
language |
English |
topic |
TK Electrical engineering. Electronics Nuclear engineering |
spellingShingle |
TK Electrical engineering. Electronics Nuclear engineering Nordin, Farah Tasya GDC-UTP ELECTRICITY FORECASTING USING FUZZY SYSTEM |
description |
This report represents the approach for short term load forecasting by using fuzzy logic
approach. As depicted in Chapter I, in order for Gas District Cooling to operate at
maximum efficiency and minimum generating costs, it must be able to forecast the load
demanded by the sole customer, University Teknologi PETRONAS. Based on the
literature review in Chapter 2, there are several fuctors that affect the forecasting such as
weather condition, the type offorecast day and history of the load demand. In Chapter 3
of this report, this project proposes a load forecasting method by using fuzzy logic
approach, based on similar days to obtain the next week's forecasted load. The
fuzzyTECH software is used to develop a week-week-ahead load forecasting model
together with Microsoft Excel as data interface. The test result, as shown in in Chapter
4, show that the proposed forecasting method could provide a considerable
improvement of the forecasting accuracy especially as it shows how to reduce forecast
error. Several recommendations for future improvements are included in Chapter 5. The
suitability of the proposed approach is illustrated through an application to actual load
data of the Gas District Cooling ofUniversity Teknologi PETRONAS. |
format |
Final Year Project |
author |
Nordin, Farah Tasya |
author_facet |
Nordin, Farah Tasya |
author_sort |
Nordin, Farah Tasya |
title |
GDC-UTP ELECTRICITY FORECASTING USING FUZZY SYSTEM |
title_short |
GDC-UTP ELECTRICITY FORECASTING USING FUZZY SYSTEM |
title_full |
GDC-UTP ELECTRICITY FORECASTING USING FUZZY SYSTEM |
title_fullStr |
GDC-UTP ELECTRICITY FORECASTING USING FUZZY SYSTEM |
title_full_unstemmed |
GDC-UTP ELECTRICITY FORECASTING USING FUZZY SYSTEM |
title_sort |
gdc-utp electricity forecasting using fuzzy system |
publisher |
Universiti Teknologi PETRONAS |
publishDate |
2011 |
url |
http://utpedia.utp.edu.my/10488/1/2011%20-%20GDC-UTP%20Electricity%20Forecasting%20using%20Fuzzy%20System.pdf http://utpedia.utp.edu.my/10488/ |
_version_ |
1739831811278635008 |