PUSH OVER ANALYSIS OF UNIFORM CORRSION DAMAGED ON FIXED JACKET STRCUTURE

Oil and gas industry has been one of the major industries in the world nowadays. The exploration of the oil and gas has been started between the ranges of 1800s to 1900s. Since then the business of oil and gas has been improving from time to time. As the year goes on, many of the offshore platforms...

Full description

Saved in:
Bibliographic Details
Main Author: ZA’ABA, ZULHELMY
Format: Final Year Project
Language:English
Published: IRC 2015
Subjects:
Online Access:http://utpedia.utp.edu.my/16005/1/1.%20Final%20Dissertation%20Zulhelmy%20Za%27aba%2016951.pdf
http://utpedia.utp.edu.my/16005/
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Teknologi Petronas
Language: English
Description
Summary:Oil and gas industry has been one of the major industries in the world nowadays. The exploration of the oil and gas has been started between the ranges of 1800s to 1900s. Since then the business of oil and gas has been improving from time to time. As the year goes on, many of the offshore platforms are still operating and was build years ago and was build in an outdated criteria. Regarding the condition of the platform, the condition assessment need to be done according to the damages that was course by the corrosion and will be analyze in this study. SACS 5.3 software will be used in this study. The primary goal of this study is to study the effect of average mean corrosion and severe mean corrosion to the platform. In this study, collapse analysis will be adopted to get the ultimate strength and the reserve strength ratio (RSR) of the platform.