Modelling of Ethylene Cracker
The major operation problem in steam cracking industry is coke formation and equipments. Ethylene producers have been actively seeking ways to reduce coke formation in order to achieve longer furnace run length. Nowadays many efforts have been made by academics and industrial personnel to understand...
Saved in:
Main Author: | |
---|---|
Format: | Final Year Project |
Published: |
Universiti Teknologi Petronas
2011
|
Subjects: | |
Online Access: | http://utpedia.utp.edu.my/395/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universiti Teknologi Petronas |
id |
my-utp-utpedia.395 |
---|---|
record_format |
eprints |
spelling |
my-utp-utpedia.3952017-01-19T15:45:37Z http://utpedia.utp.edu.my/395/ Modelling of Ethylene Cracker Wan Ahmad Faiz Bin Wan Razali, Wan Ahmad Faiz TP Chemical technology The major operation problem in steam cracking industry is coke formation and equipments. Ethylene producers have been actively seeking ways to reduce coke formation in order to achieve longer furnace run length. Nowadays many efforts have been made by academics and industrial personnel to understand the coking problem. Numerous techniques have been considered on how to reduce coke formation and/or coke collection on the inner surfaces of the coils in furnaces producing ethylene, propylene, etc. Such reduction would lead to several beneficial events including much reduced production costs. All ethylene furnaces until about 10 years ago had to be decoked after 30-60 days to remove the coke that collected in the coil. Such coke has several adverse effects. First yields of ethylene and other desired hydrocarbons are reduced. Second resistances to heat transfer from the hot combustion gases to the hydrocarbon gases being cracked increase. Hence, energy demands for operating the furnaces increase. Third, resistances to the gas flow in the coils increases as the thickness of the coke increases. Fourth when the furnaces are decoked, production of the desired products is stopped for significant time periods. Due to this consideration, the project was planned to increase the run length by minimizing the formation of coke. Universiti Teknologi Petronas 2011-05 Final Year Project NonPeerReviewed Wan Ahmad Faiz Bin Wan Razali, Wan Ahmad Faiz (2011) Modelling of Ethylene Cracker. Universiti Teknologi Petronas, Sri Iskandar,Tronoh,Perak. (Unpublished) |
institution |
Universiti Teknologi Petronas |
building |
UTP Resource Centre |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Teknologi Petronas |
content_source |
UTP Electronic and Digitized Intellectual Asset |
url_provider |
http://utpedia.utp.edu.my/ |
topic |
TP Chemical technology |
spellingShingle |
TP Chemical technology Wan Ahmad Faiz Bin Wan Razali, Wan Ahmad Faiz Modelling of Ethylene Cracker |
description |
The major operation problem in steam cracking industry is coke formation and equipments. Ethylene producers have been actively seeking ways to reduce coke formation in order to achieve longer furnace run length. Nowadays many efforts have been made by academics and industrial personnel to understand the coking problem. Numerous techniques have been considered on how to reduce coke formation and/or coke collection on the inner surfaces of the coils in furnaces producing ethylene, propylene, etc. Such reduction would lead to several beneficial events including much reduced production costs. All ethylene furnaces until about 10 years ago had to be decoked after 30-60 days to remove the coke that collected in the coil. Such coke has several adverse effects. First yields of ethylene and other desired hydrocarbons are reduced. Second resistances to heat transfer from the hot combustion gases to the hydrocarbon gases being cracked increase. Hence, energy demands for operating the furnaces increase. Third, resistances to the gas flow in the coils increases as the thickness of the coke increases. Fourth when the furnaces are decoked, production of the desired products is stopped for significant time periods. Due to this consideration, the project was planned to increase the run length by minimizing the formation of coke. |
format |
Final Year Project |
author |
Wan Ahmad Faiz Bin Wan Razali, Wan Ahmad Faiz |
author_facet |
Wan Ahmad Faiz Bin Wan Razali, Wan Ahmad Faiz |
author_sort |
Wan Ahmad Faiz Bin Wan Razali, Wan Ahmad Faiz |
title |
Modelling of Ethylene Cracker |
title_short |
Modelling of Ethylene Cracker |
title_full |
Modelling of Ethylene Cracker |
title_fullStr |
Modelling of Ethylene Cracker |
title_full_unstemmed |
Modelling of Ethylene Cracker |
title_sort |
modelling of ethylene cracker |
publisher |
Universiti Teknologi Petronas |
publishDate |
2011 |
url |
http://utpedia.utp.edu.my/395/ |
_version_ |
1739830653499736064 |