Monitoring and Control of a Process by SCADA via Grafcet and Ladder Diagram Programming

This report discusses the development of a Supervisory Control and Data Acquisition (SCADA) system for the monitoring and control of a process using Programmable Logic Controller (PLC) via Grafcet and Ladder Diagram (LD) programming. The report explains the background and several methods to progr...

Full description

Saved in:
Bibliographic Details
Main Author: FAUZI, AHMAD FAIZ
Format: Final Year Project
Language:English
Published: Universiti Teknologi PETRONAS 2007
Subjects:
Online Access:http://utpedia.utp.edu.my/9583/1/2007%20-%20Monitoring%20and%20Control%20of%20a%20Process%20by%20Scade%20via%20Grafcet%20and%20Ladder%20Diagram%20Programming.pdf
http://utpedia.utp.edu.my/9583/
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Teknologi Petronas
Language: English
id my-utp-utpedia.9583
record_format eprints
spelling my-utp-utpedia.95832017-01-25T09:45:48Z http://utpedia.utp.edu.my/9583/ Monitoring and Control of a Process by SCADA via Grafcet and Ladder Diagram Programming FAUZI, AHMAD FAIZ TK Electrical engineering. Electronics Nuclear engineering This report discusses the development of a Supervisory Control and Data Acquisition (SCADA) system for the monitoring and control of a process using Programmable Logic Controller (PLC) via Grafcet and Ladder Diagram (LD) programming. The report explains the background and several methods to program a PLC. When dealing with a PLC, Grafcet is becoming the preferable method to work with because of its easiness and the clear flow of program. In this work, the Tidal Gate Control System (TGCS) is selected as a case study to investigate the advantages and disadvantages of Grafcet over LD. A literature review to track the achievements of researchers in using Grafcet and about Grafcet have been conducted. Procedure and tools required to develop TGCS are elucidated. Results on the implementation of the project are discussed. Programming the PLC to implement the monitoring and control of TGCS via Grafcet is more convenient compared to programming via LD. The recommendations on the future works of this project are also discussed. Universiti Teknologi PETRONAS 2007-06 Final Year Project NonPeerReviewed application/pdf en http://utpedia.utp.edu.my/9583/1/2007%20-%20Monitoring%20and%20Control%20of%20a%20Process%20by%20Scade%20via%20Grafcet%20and%20Ladder%20Diagram%20Programming.pdf FAUZI, AHMAD FAIZ (2007) Monitoring and Control of a Process by SCADA via Grafcet and Ladder Diagram Programming. Universiti Teknologi PETRONAS. (Unpublished)
institution Universiti Teknologi Petronas
building UTP Resource Centre
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Petronas
content_source UTP Electronic and Digitized Intellectual Asset
url_provider http://utpedia.utp.edu.my/
language English
topic TK Electrical engineering. Electronics Nuclear engineering
spellingShingle TK Electrical engineering. Electronics Nuclear engineering
FAUZI, AHMAD FAIZ
Monitoring and Control of a Process by SCADA via Grafcet and Ladder Diagram Programming
description This report discusses the development of a Supervisory Control and Data Acquisition (SCADA) system for the monitoring and control of a process using Programmable Logic Controller (PLC) via Grafcet and Ladder Diagram (LD) programming. The report explains the background and several methods to program a PLC. When dealing with a PLC, Grafcet is becoming the preferable method to work with because of its easiness and the clear flow of program. In this work, the Tidal Gate Control System (TGCS) is selected as a case study to investigate the advantages and disadvantages of Grafcet over LD. A literature review to track the achievements of researchers in using Grafcet and about Grafcet have been conducted. Procedure and tools required to develop TGCS are elucidated. Results on the implementation of the project are discussed. Programming the PLC to implement the monitoring and control of TGCS via Grafcet is more convenient compared to programming via LD. The recommendations on the future works of this project are also discussed.
format Final Year Project
author FAUZI, AHMAD FAIZ
author_facet FAUZI, AHMAD FAIZ
author_sort FAUZI, AHMAD FAIZ
title Monitoring and Control of a Process by SCADA via Grafcet and Ladder Diagram Programming
title_short Monitoring and Control of a Process by SCADA via Grafcet and Ladder Diagram Programming
title_full Monitoring and Control of a Process by SCADA via Grafcet and Ladder Diagram Programming
title_fullStr Monitoring and Control of a Process by SCADA via Grafcet and Ladder Diagram Programming
title_full_unstemmed Monitoring and Control of a Process by SCADA via Grafcet and Ladder Diagram Programming
title_sort monitoring and control of a process by scada via grafcet and ladder diagram programming
publisher Universiti Teknologi PETRONAS
publishDate 2007
url http://utpedia.utp.edu.my/9583/1/2007%20-%20Monitoring%20and%20Control%20of%20a%20Process%20by%20Scade%20via%20Grafcet%20and%20Ladder%20Diagram%20Programming.pdf
http://utpedia.utp.edu.my/9583/
_version_ 1739831690996482048