Effects of unethical behavior among professionals in Klang valley construction industry
Professionals are integral to the project. However, conflicts of interest among professional such as clients and contractors, project managers, architects play an important role in unethical practices that have an adverse effect in the construction industry. Therefore, this study aims to identify th...
Saved in:
Main Authors: | , , , , , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
UKM Press
2022
|
Subjects: | |
Online Access: | http://irep.iium.edu.my/100117/2/100117_Effects%20of%20unethical%20behavior%20among%20professionals.pdf http://irep.iium.edu.my/100117/ http://www.ukm.my/jkukm/wp-content/uploads/2022/3405/09.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universiti Islam Antarabangsa Malaysia |
Language: | English |
id |
my.iium.irep.100117 |
---|---|
record_format |
dspace |
spelling |
my.iium.irep.1001172022-09-21T07:30:03Z http://irep.iium.edu.my/100117/ Effects of unethical behavior among professionals in Klang valley construction industry Woei Lynn, Sarah Wong Md Noh, Nur Ilya Farhana Surol, Salihah Zakiah, Ahmad Lin, Ng Jing Chaia, Lee Jin Syamsunur, Deprizon Al-Mansob, Ramez Razman, Ruzaimah TA Engineering (General). Civil engineering (General) Professionals are integral to the project. However, conflicts of interest among professional such as clients and contractors, project managers, architects play an important role in unethical practices that have an adverse effect in the construction industry. Therefore, this study aims to identify the effects of unethical issues that occur among the professionals in Klang Valley construction industry. The data collection has been conducted via questionnaire survey and has been analyzed using SPSS. Most respondents agree that “Delay of construction project” is the main effect of unethical behavior with a mean of 4.36 and SD= 0.848. When a project is delayed, it would cause major problems such as project abandonment, cost overrun, conflicts against parties and poor-quality works. This is because a project depends on the cost and time in order to be completed. Furthermore, a delayed project leads to a rushed project that will cause defective works. Frequent maintenance will be needed for repairing works, thus increasing the cost to bear in the project itself. Lastly, it is recommended that the timeframe for future studies should be increased to allow researchers to have sufficient time to collect more data in order to improve the accuracy and reliability of data collected. UKM Press 2022-09-30 Article PeerReviewed application/pdf en http://irep.iium.edu.my/100117/2/100117_Effects%20of%20unethical%20behavior%20among%20professionals.pdf Woei Lynn, Sarah Wong and Md Noh, Nur Ilya Farhana and Surol, Salihah and Zakiah, Ahmad and Lin, Ng Jing and Chaia, Lee Jin and Syamsunur, Deprizon and Al-Mansob, Ramez and Razman, Ruzaimah (2022) Effects of unethical behavior among professionals in Klang valley construction industry. Jurnal Kejuruteraan, 34 (5). pp. 831-835. ISSN 0128-0198 E-ISSN 2289-7526 http://www.ukm.my/jkukm/wp-content/uploads/2022/3405/09.pdf |
institution |
Universiti Islam Antarabangsa Malaysia |
building |
IIUM Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
International Islamic University Malaysia |
content_source |
IIUM Repository (IREP) |
url_provider |
http://irep.iium.edu.my/ |
language |
English |
topic |
TA Engineering (General). Civil engineering (General) |
spellingShingle |
TA Engineering (General). Civil engineering (General) Woei Lynn, Sarah Wong Md Noh, Nur Ilya Farhana Surol, Salihah Zakiah, Ahmad Lin, Ng Jing Chaia, Lee Jin Syamsunur, Deprizon Al-Mansob, Ramez Razman, Ruzaimah Effects of unethical behavior among professionals in Klang valley construction industry |
description |
Professionals are integral to the project. However, conflicts of interest among professional such as clients and contractors, project managers, architects play an important role in unethical practices that have an adverse effect in the construction industry. Therefore, this study aims to identify the effects of unethical issues that occur among the professionals in Klang Valley construction industry. The data collection has been conducted via questionnaire survey and has been analyzed using SPSS. Most respondents agree that “Delay of construction project” is the main effect of unethical behavior with a mean of 4.36 and SD= 0.848. When a project is delayed, it would cause major problems such as project abandonment, cost overrun, conflicts against parties and poor-quality works. This is because a project depends on the cost and time in order to be completed. Furthermore, a delayed project leads to a rushed project that will cause defective works. Frequent maintenance will be needed for repairing works, thus increasing the cost to bear in the project itself. Lastly, it is recommended that the timeframe for future studies should be increased to allow researchers to have sufficient time to collect more data in order to improve the accuracy and reliability of data collected. |
format |
Article |
author |
Woei Lynn, Sarah Wong Md Noh, Nur Ilya Farhana Surol, Salihah Zakiah, Ahmad Lin, Ng Jing Chaia, Lee Jin Syamsunur, Deprizon Al-Mansob, Ramez Razman, Ruzaimah |
author_facet |
Woei Lynn, Sarah Wong Md Noh, Nur Ilya Farhana Surol, Salihah Zakiah, Ahmad Lin, Ng Jing Chaia, Lee Jin Syamsunur, Deprizon Al-Mansob, Ramez Razman, Ruzaimah |
author_sort |
Woei Lynn, Sarah Wong |
title |
Effects of unethical behavior among professionals in Klang valley construction industry |
title_short |
Effects of unethical behavior among professionals in Klang valley construction industry |
title_full |
Effects of unethical behavior among professionals in Klang valley construction industry |
title_fullStr |
Effects of unethical behavior among professionals in Klang valley construction industry |
title_full_unstemmed |
Effects of unethical behavior among professionals in Klang valley construction industry |
title_sort |
effects of unethical behavior among professionals in klang valley construction industry |
publisher |
UKM Press |
publishDate |
2022 |
url |
http://irep.iium.edu.my/100117/2/100117_Effects%20of%20unethical%20behavior%20among%20professionals.pdf http://irep.iium.edu.my/100117/ http://www.ukm.my/jkukm/wp-content/uploads/2022/3405/09.pdf |
_version_ |
1744648645259558912 |