Calculation of proper time of concentration for drainage design in construction projects for urban development
The design and construction of a proper drainage system are important for any urban development project, small or big. Hydrological and hydraulic calculations are used to design the drainage systems. The calculation of peak flow is one of the common hydrological methods applied to determine th...
Saved in:
Main Authors: | , , , , |
---|---|
Format: | Article |
Language: | English English |
Published: |
University Malaysia Pahang
2023
|
Subjects: | |
Online Access: | http://irep.iium.edu.my/109419/7/109419_Calculation%20of%20Proper%20Time%20of%20Concentration.pdf http://irep.iium.edu.my/109419/1/Calculation%20of%20Proper%20Time%20of%20Concentration.pdf http://irep.iium.edu.my/109419/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universiti Islam Antarabangsa Malaysia |
Language: | English English |
id |
my.iium.irep.109419 |
---|---|
record_format |
dspace |
spelling |
my.iium.irep.1094192024-01-03T01:17:21Z http://irep.iium.edu.my/109419/ Calculation of proper time of concentration for drainage design in construction projects for urban development Al-Mamun, Abdullah Ibrahim, Saerahany Legori Masbah, Dani Irwan Daoud, Jamal Ibrahim Yahya Khan, N.K.M.E. TA197 Engineering meteorology The design and construction of a proper drainage system are important for any urban development project, small or big. Hydrological and hydraulic calculations are used to design the drainage systems. The calculation of peak flow is one of the common hydrological methods applied to determine the drain sizes for all construction projects. Peak flows and hydrographs can be calculated using several techniques. In order to calculate the peak flow, the design rainfall duration has to be appropriate, which will reflect the critical storm duration. The critical storm duration, on the other hand, depends on the time of concentration (tc) of the catchment. However, most of the equations for tc available in the literature are empirical. At least 23 equations could be traced in various references, which consist of different geophysical and other hydrological parameters. This paper is intended to explain the importance of the proper use of tc to calculate peak runoff flow for construction projects, as accurately as possible. A review of the existing methods used to calculate the time of concentration revealed inconsistencies among a few methods found in the literature. The correct value of the time of concentration (tc) is important for the application of the Rational Method, as the value of tc helps the designer assume the storm duration critical to get the maximum peak flow value. If the critical storm duration is not used in the Rational Method, the drain will be undersized, and the overflow of the storm runoff may happen. Therefore, ample attention should be given to the calculation of the time of concentration to ensure the safety, economy, and sustainability of the drainage system in any development project. University Malaysia Pahang 2023-12-21 Article PeerReviewed application/pdf en http://irep.iium.edu.my/109419/7/109419_Calculation%20of%20Proper%20Time%20of%20Concentration.pdf application/pdf en http://irep.iium.edu.my/109419/1/Calculation%20of%20Proper%20Time%20of%20Concentration.pdf Al-Mamun, Abdullah and Ibrahim, Saerahany Legori and Masbah, Dani Irwan and Daoud, Jamal Ibrahim and Yahya Khan, N.K.M.E. (2023) Calculation of proper time of concentration for drainage design in construction projects for urban development. Journal of Construction, 3 (2). pp. 190-195. ISSN 2785-8731 DOI: https://doi.org/10.15282/construction.v3i2.9664 |
institution |
Universiti Islam Antarabangsa Malaysia |
building |
IIUM Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
International Islamic University Malaysia |
content_source |
IIUM Repository (IREP) |
url_provider |
http://irep.iium.edu.my/ |
language |
English English |
topic |
TA197 Engineering meteorology |
spellingShingle |
TA197 Engineering meteorology Al-Mamun, Abdullah Ibrahim, Saerahany Legori Masbah, Dani Irwan Daoud, Jamal Ibrahim Yahya Khan, N.K.M.E. Calculation of proper time of concentration for drainage design in construction projects for urban development |
description |
The design and construction of a proper drainage system are important for any
urban development project, small or big. Hydrological and hydraulic calculations are used to
design the drainage systems. The calculation of peak flow is one of the common hydrological
methods applied to determine the drain sizes for all construction projects. Peak flows and
hydrographs can be calculated using several techniques. In order to calculate the peak flow,
the design rainfall duration has to be appropriate, which will reflect the critical storm duration.
The critical storm duration, on the other hand, depends on the time of concentration (tc) of the
catchment. However, most of the equations for tc available in the literature are empirical. At
least 23 equations could be traced in various references, which consist of different geophysical
and other hydrological parameters. This paper is intended to explain the importance of the
proper use of tc to calculate peak runoff flow for construction projects, as accurately as
possible. A review of the existing methods used to calculate the time of concentration revealed
inconsistencies among a few methods found in the literature. The correct value of the time of
concentration (tc) is important for the application of the Rational Method, as the value of tc
helps the designer assume the storm duration critical to get the maximum peak flow value. If
the critical storm duration is not used in the Rational Method, the drain will be undersized, and
the overflow of the storm runoff may happen. Therefore, ample attention should be given to
the calculation of the time of concentration to ensure the safety, economy, and sustainability
of the drainage system in any development project. |
format |
Article |
author |
Al-Mamun, Abdullah Ibrahim, Saerahany Legori Masbah, Dani Irwan Daoud, Jamal Ibrahim Yahya Khan, N.K.M.E. |
author_facet |
Al-Mamun, Abdullah Ibrahim, Saerahany Legori Masbah, Dani Irwan Daoud, Jamal Ibrahim Yahya Khan, N.K.M.E. |
author_sort |
Al-Mamun, Abdullah |
title |
Calculation of proper time of concentration for drainage design in construction projects for urban development |
title_short |
Calculation of proper time of concentration for drainage design in construction projects for urban development |
title_full |
Calculation of proper time of concentration for drainage design in construction projects for urban development |
title_fullStr |
Calculation of proper time of concentration for drainage design in construction projects for urban development |
title_full_unstemmed |
Calculation of proper time of concentration for drainage design in construction projects for urban development |
title_sort |
calculation of proper time of concentration for drainage design in construction projects for urban development |
publisher |
University Malaysia Pahang |
publishDate |
2023 |
url |
http://irep.iium.edu.my/109419/7/109419_Calculation%20of%20Proper%20Time%20of%20Concentration.pdf http://irep.iium.edu.my/109419/1/Calculation%20of%20Proper%20Time%20of%20Concentration.pdf http://irep.iium.edu.my/109419/ |
_version_ |
1787131941768658944 |