Challenges in the rehabilitation of the Pusu River
River rehabilitation efforts in the world are increasing to conserve the ecosystem. These efforts, generally, face challenges from various sources. Major constraints which can turn such a program into a failed project have been discussed explicitly in the first portion of this paper. In the latte...
Saved in:
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English English English |
Published: |
Editura Universitatea Alexendru Ion Cuza
2017
|
Subjects: | |
Online Access: | http://irep.iium.edu.my/57007/1/1%20IJCS-17-13_Published.pdf http://irep.iium.edu.my/57007/7/57007_Challenges%20in%20the%20rehabilitation_WOS.pdf http://irep.iium.edu.my/57007/8/57007_Challenges%20in%20the%20rehabilitation_SCOPUS.pdf http://irep.iium.edu.my/57007/ http://eds.a.ebscohost.com/eds/pdfviewer/pdfviewer?sid=c97dda60-8677-46ef-9f60-cf09b0250898%40sessionmgr4010&vid=1&hid=4202 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universiti Islam Antarabangsa Malaysia |
Language: | English English English |
id |
my.iium.irep.57007 |
---|---|
record_format |
dspace |
spelling |
my.iium.irep.570072017-05-23T05:03:56Z http://irep.iium.edu.my/57007/ Challenges in the rehabilitation of the Pusu River Nuruzzaman, Md. Mamun, Abdullah Al Salleh, Md Noor TA170 Environmental engineering River rehabilitation efforts in the world are increasing to conserve the ecosystem. These efforts, generally, face challenges from various sources. Major constraints which can turn such a program into a failed project have been discussed explicitly in the first portion of this paper. In the latter portion of the paper, focus has been given on the problems of rehabilitation of the Pusu Rive at Gombak District in Malaysia. Water sampling from the river and its catchment has been done in different periods and events. Pollution loadings into the river have been calculated for different parameters. Based on analysis, sand mining activities, point source pollution and catchment landuse have been identified as the major impediments of Pusu River rehabilitation. These problems must be addressed before the rehabilitation of the river to ensure the rehabilitation of the river is successful. Editura Universitatea Alexendru Ion Cuza 2017 Article REM application/pdf en http://irep.iium.edu.my/57007/1/1%20IJCS-17-13_Published.pdf application/pdf en http://irep.iium.edu.my/57007/7/57007_Challenges%20in%20the%20rehabilitation_WOS.pdf application/pdf en http://irep.iium.edu.my/57007/8/57007_Challenges%20in%20the%20rehabilitation_SCOPUS.pdf Nuruzzaman, Md. and Mamun, Abdullah Al and Salleh, Md Noor (2017) Challenges in the rehabilitation of the Pusu River. International Journal of Conservation Science, 8 (1). pp. 121-130. ISSN 2067-533X http://eds.a.ebscohost.com/eds/pdfviewer/pdfviewer?sid=c97dda60-8677-46ef-9f60-cf09b0250898%40sessionmgr4010&vid=1&hid=4202 |
institution |
Universiti Islam Antarabangsa Malaysia |
building |
IIUM Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
International Islamic University Malaysia |
content_source |
IIUM Repository (IREP) |
url_provider |
http://irep.iium.edu.my/ |
language |
English English English |
topic |
TA170 Environmental engineering |
spellingShingle |
TA170 Environmental engineering Nuruzzaman, Md. Mamun, Abdullah Al Salleh, Md Noor Challenges in the rehabilitation of the Pusu River |
description |
River rehabilitation efforts in the world are increasing to conserve the ecosystem. These
efforts, generally, face challenges from various sources. Major constraints which can turn
such a program into a failed project have been discussed explicitly in the first portion of this
paper. In the latter portion of the paper, focus has been given on the problems of
rehabilitation of the Pusu Rive at Gombak District in Malaysia. Water sampling from the
river and its catchment has been done in different periods and events. Pollution loadings into
the river have been calculated for different parameters. Based on analysis, sand mining
activities, point source pollution and catchment landuse have been identified as the major
impediments of Pusu River rehabilitation. These problems must be addressed before the
rehabilitation of the river to ensure the rehabilitation of the river is successful. |
format |
Article |
author |
Nuruzzaman, Md. Mamun, Abdullah Al Salleh, Md Noor |
author_facet |
Nuruzzaman, Md. Mamun, Abdullah Al Salleh, Md Noor |
author_sort |
Nuruzzaman, Md. |
title |
Challenges in the rehabilitation of the Pusu River |
title_short |
Challenges in the rehabilitation of the Pusu River |
title_full |
Challenges in the rehabilitation of the Pusu River |
title_fullStr |
Challenges in the rehabilitation of the Pusu River |
title_full_unstemmed |
Challenges in the rehabilitation of the Pusu River |
title_sort |
challenges in the rehabilitation of the pusu river |
publisher |
Editura Universitatea Alexendru Ion Cuza |
publishDate |
2017 |
url |
http://irep.iium.edu.my/57007/1/1%20IJCS-17-13_Published.pdf http://irep.iium.edu.my/57007/7/57007_Challenges%20in%20the%20rehabilitation_WOS.pdf http://irep.iium.edu.my/57007/8/57007_Challenges%20in%20the%20rehabilitation_SCOPUS.pdf http://irep.iium.edu.my/57007/ http://eds.a.ebscohost.com/eds/pdfviewer/pdfviewer?sid=c97dda60-8677-46ef-9f60-cf09b0250898%40sessionmgr4010&vid=1&hid=4202 |
_version_ |
1643615046553567232 |