Project manager's competency framework in managing Industrialised Building System (IBS) construction project / Izatul Laili Jabar
Industrialised Building System (IBS) has been introduced to promote a systematic construction process. The application of IBS offers numerous benefits such as cost and time reduction and enhancing construction quality and safety. In the Malaysian construction industry, IBS application was also expec...
Saved in:
Main Author: | |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2017
|
Subjects: | |
Online Access: | http://ir.uitm.edu.my/id/eprint/18882/1/TP_IZATUL%20LAILI%20JABAR%20AP%2017_5.pdf http://ir.uitm.edu.my/id/eprint/18882/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universiti Teknologi Mara |
Language: | English |
id |
my.uitm.ir.18882 |
---|---|
record_format |
eprints |
spelling |
my.uitm.ir.188822018-01-25T02:39:59Z http://ir.uitm.edu.my/id/eprint/18882/ Project manager's competency framework in managing Industrialised Building System (IBS) construction project / Izatul Laili Jabar Jabar, Izatul Laili Planning. Business planning. Strategic planning Industrialised Building System (IBS) has been introduced to promote a systematic construction process. The application of IBS offers numerous benefits such as cost and time reduction and enhancing construction quality and safety. In the Malaysian construction industry, IBS application was also expected to minimise the dependency on unskilled foreign labour. There are various issues associated with IBS construction projects such as poor quality building and construction delay, and thus, a qualified and experienced organisation led by a competent project manager is required to overcome the issues. The project manager who possesses the necessary competencies may lead the project to success and achieve its objectives. The objectives of this research are to investigate the competencies required for a project manager in managing IBS construction project; to determine the competencies required within the project management phases; to analyse the most significant competencies within the project management phases and to develop a competency framework for a project manager in managing the IBS construction project. This research is adopting a mixed method approach. A qualitative approach of semi-structured interviews was carried out to fourteen interviewees consisting of project managers of construction organisations, managers of installer companies and managers of manufacturing companies. Fifty competencies have been identified during the semi-structured interviews and categorised into project management phases. The identified competencies were then re-evaluated through a quantitative approach to determine the most significant competencies for a project manager. A questionnaire survey was used to measure the significant level of competencies for the project manager. SPSS version 20 was used to analyse the data from the questionnaire survey. The competencies were ranked by using Mean Analysis and Relative Importance Index (RII). Pareto Analysis was then used to cut-off the most significant competencies. Thirty-five competencies out of fifty listed competencies were identified as the most significant competencies formed the primary competencies section; meanwhile, another fifteen competencies established the secondary competencies section in the framework. The framework of project manager's competency in managing IBS construction project (PM-IBS Competency Framework) were validated by panels represented from the construction organisation, Association of Construction Project Manager (ACPM), Public Work Department (PWD), Malaysian Asset and Project Management Association (MAPMA), Construction Industry Development Board (CIDB) and project management trainer. 2017 Thesis NonPeerReviewed text en http://ir.uitm.edu.my/id/eprint/18882/1/TP_IZATUL%20LAILI%20JABAR%20AP%2017_5.pdf Jabar, Izatul Laili (2017) Project manager's competency framework in managing Industrialised Building System (IBS) construction project / Izatul Laili Jabar. PhD thesis, Universiti Teknologi MARA. |
institution |
Universiti Teknologi Mara |
building |
Tun Abdul Razak Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Teknologi Mara |
content_source |
UiTM Institutional Repository |
url_provider |
http://ir.uitm.edu.my/ |
language |
English |
topic |
Planning. Business planning. Strategic planning |
spellingShingle |
Planning. Business planning. Strategic planning Jabar, Izatul Laili Project manager's competency framework in managing Industrialised Building System (IBS) construction project / Izatul Laili Jabar |
description |
Industrialised Building System (IBS) has been introduced to promote a systematic construction process. The application of IBS offers numerous benefits such as cost and time reduction and enhancing construction quality and safety. In the Malaysian construction industry, IBS application was also expected to minimise the dependency on unskilled foreign labour. There are various issues associated with IBS construction projects such as poor quality building and construction delay, and thus, a qualified and experienced organisation led by a competent project manager is required to overcome the issues. The project manager who possesses the necessary competencies may lead the project to success and achieve its objectives. The objectives of this research are to investigate the competencies required for a project manager in managing IBS construction project; to determine the competencies required within the project management phases; to analyse the most significant competencies within the project management phases and to develop a competency framework for a project manager in managing the IBS construction project. This research is adopting a mixed method approach. A qualitative approach of semi-structured interviews was carried out to fourteen interviewees consisting of project managers of construction organisations, managers of installer companies and managers of manufacturing companies. Fifty competencies have been identified during the semi-structured interviews and categorised into project management phases. The identified competencies were then re-evaluated through a quantitative approach to determine the most significant competencies for a project manager. A questionnaire survey was used to measure the significant level of competencies for the project manager. SPSS version 20 was used to analyse the data from the questionnaire survey. The competencies were ranked by using Mean Analysis and Relative Importance Index (RII). Pareto Analysis was then used to cut-off the most significant competencies. Thirty-five competencies out of fifty listed competencies were identified as the most significant competencies formed the primary competencies section; meanwhile, another fifteen competencies established the secondary competencies section in the framework. The framework of project manager's competency in managing IBS construction project (PM-IBS Competency Framework) were validated by panels represented from the construction organisation, Association of Construction Project Manager (ACPM), Public Work Department (PWD), Malaysian Asset and Project Management Association (MAPMA), Construction Industry Development Board (CIDB) and project management trainer. |
format |
Thesis |
author |
Jabar, Izatul Laili |
author_facet |
Jabar, Izatul Laili |
author_sort |
Jabar, Izatul Laili |
title |
Project manager's competency framework in managing Industrialised Building System (IBS) construction project / Izatul Laili Jabar |
title_short |
Project manager's competency framework in managing Industrialised Building System (IBS) construction project / Izatul Laili Jabar |
title_full |
Project manager's competency framework in managing Industrialised Building System (IBS) construction project / Izatul Laili Jabar |
title_fullStr |
Project manager's competency framework in managing Industrialised Building System (IBS) construction project / Izatul Laili Jabar |
title_full_unstemmed |
Project manager's competency framework in managing Industrialised Building System (IBS) construction project / Izatul Laili Jabar |
title_sort |
project manager's competency framework in managing industrialised building system (ibs) construction project / izatul laili jabar |
publishDate |
2017 |
url |
http://ir.uitm.edu.my/id/eprint/18882/1/TP_IZATUL%20LAILI%20JABAR%20AP%2017_5.pdf http://ir.uitm.edu.my/id/eprint/18882/ |
_version_ |
1685649139983974400 |