A framework of the economic factors and cost in the implementation of mechanisation and automation (M&A) in Industrialised Building System (IBS) approach / Siti Syariazulfa Kamaruddin
Industrialised Building System (IBS) has been introduced to promote a systematic construction process. The application of IBS offers numerous benefits such as cost, time reduction and enhancing construction quality and safety. In the Malaysian construction industry, IBS application was also expected...
Saved in:
Main Author: | |
---|---|
Format: | Book Section |
Language: | English |
Published: |
Institute of Graduate Studies, UiTM
2018
|
Subjects: | |
Online Access: | http://ir.uitm.edu.my/id/eprint/22016/1/ABS_SITI%20SYARIAZULFA%20KAMARUDDIN%20TDRA%20VOL%2014%20IGS%2018.pdf http://ir.uitm.edu.my/id/eprint/22016/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universiti Teknologi Mara |
Language: | English |