The impediments in adopting the environmental management system (EMS) implementation among local authorities in Malaysia / Nero Madi, Corina Joseph and Mariam Rahmat
The Government has introduced five major initiatives to transform the nation, namely, 1 Malaysia, the New Economic Model (NEM), the Government Transformation Programme (GTP), the Economic Transformation Plan (ETP), and the Tenth Malaysia Plan (Annuar, 2011). The NEM lists eight Strategic Reform Init...
Saved in:
Main Authors: | , , |
---|---|
Format: | Research Reports |
Language: | English |
Published: |
Faculty of Accountancy
2016
|
Subjects: | |
Online Access: | http://ir.uitm.edu.my/id/eprint/28699/1/LP_NERO%20MADI%20RMI%20B%2016_5pdf..PDF http://ir.uitm.edu.my/id/eprint/28699/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universiti Teknologi Mara |
Language: | English |
id |
my.uitm.ir.28699 |
---|---|
record_format |
eprints |
spelling |
my.uitm.ir.286992020-03-24T09:46:00Z http://ir.uitm.edu.my/id/eprint/28699/ The impediments in adopting the environmental management system (EMS) implementation among local authorities in Malaysia / Nero Madi, Corina Joseph and Mariam Rahmat Madi, Nero Joseph, Corina Rahmat, Mariam Environmental policy and economic development. Sustainable development. Environmental management The Government has introduced five major initiatives to transform the nation, namely, 1 Malaysia, the New Economic Model (NEM), the Government Transformation Programme (GTP), the Economic Transformation Plan (ETP), and the Tenth Malaysia Plan (Annuar, 2011). The NEM lists eight Strategic Reform Initiatives (SRI) to drive the Malaysian economy towards high income, inclusive and sustainable economy. One of the initiatives is strengthening the public sector via numerous reform agenda, such as implementing environmental management system (EMS). In this study, local authorities were chosen as a sample because of their important role in advancing towards sustainable development. Moreover, only three out of 149 local authorities in Malaysia to date have implemented EMS. The three local authorities are Dewan Bandaraya Kuching Utara (DBKU), Majlis Perbandaran Seberang Perai (MPSP), and Majlis Perbandaran Pasir Gudang. (MPPG). Hence, the study inten orities. The survey instrument was developed based on the results from Joseph et al. (2014), which was distributed via mail to all 146 local authorities in Malaysia. It was expected that the findings would be used to encourage the use of ISO 14001 as a tool for implementing sustainability agenda as practised in other countries, as well as to promote the use of EMS to address the requirement for a plan to implement sustainable development programme, such as Local Agenda 21. It was also expected that the survey findings would fill in the gaps in the literature in better understanding the ISO14001 adoption stage. Faculty of Accountancy 2016-11 Research Reports NonPeerReviewed text en http://ir.uitm.edu.my/id/eprint/28699/1/LP_NERO%20MADI%20RMI%20B%2016_5pdf..PDF Madi, Nero and Joseph, Corina and Rahmat, Mariam (2016) The impediments in adopting the environmental management system (EMS) implementation among local authorities in Malaysia / Nero Madi, Corina Joseph and Mariam Rahmat. [Research Reports] (Unpublished) |
institution |
Universiti Teknologi Mara |
building |
Tun Abdul Razak Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Teknologi Mara |
content_source |
UiTM Institutional Repository |
url_provider |
http://ir.uitm.edu.my/ |
language |
English |
topic |
Environmental policy and economic development. Sustainable development. Environmental management |
spellingShingle |
Environmental policy and economic development. Sustainable development. Environmental management Madi, Nero Joseph, Corina Rahmat, Mariam The impediments in adopting the environmental management system (EMS) implementation among local authorities in Malaysia / Nero Madi, Corina Joseph and Mariam Rahmat |
description |
The Government has introduced five major initiatives to transform the nation, namely, 1 Malaysia, the New Economic Model (NEM), the Government Transformation Programme (GTP), the Economic Transformation Plan (ETP), and the Tenth Malaysia Plan (Annuar, 2011). The NEM lists eight Strategic Reform Initiatives (SRI) to drive the Malaysian economy towards high income, inclusive and sustainable economy. One of the initiatives is strengthening the public sector via numerous reform agenda, such as implementing environmental management system (EMS). In this study, local authorities were chosen as a sample because of their important role in advancing towards sustainable development. Moreover, only three out of 149 local authorities in Malaysia to date have implemented EMS. The three local authorities are Dewan Bandaraya Kuching Utara (DBKU), Majlis Perbandaran Seberang Perai (MPSP), and Majlis Perbandaran Pasir Gudang. (MPPG). Hence, the study inten orities. The survey instrument was developed based on the results from Joseph et al. (2014), which was distributed via mail to all 146 local authorities in Malaysia. It was expected that the findings would be used to encourage the use of ISO 14001 as a tool for implementing sustainability agenda as practised in other countries, as well as to promote the use of EMS to address the requirement for a plan to implement sustainable development programme, such as Local Agenda 21. It was also expected that the survey findings would fill in the gaps in the literature in better understanding the ISO14001 adoption stage. |
format |
Research Reports |
author |
Madi, Nero Joseph, Corina Rahmat, Mariam |
author_facet |
Madi, Nero Joseph, Corina Rahmat, Mariam |
author_sort |
Madi, Nero |
title |
The impediments in adopting the environmental management system (EMS) implementation among local authorities in Malaysia / Nero Madi, Corina Joseph and Mariam Rahmat |
title_short |
The impediments in adopting the environmental management system (EMS) implementation among local authorities in Malaysia / Nero Madi, Corina Joseph and Mariam Rahmat |
title_full |
The impediments in adopting the environmental management system (EMS) implementation among local authorities in Malaysia / Nero Madi, Corina Joseph and Mariam Rahmat |
title_fullStr |
The impediments in adopting the environmental management system (EMS) implementation among local authorities in Malaysia / Nero Madi, Corina Joseph and Mariam Rahmat |
title_full_unstemmed |
The impediments in adopting the environmental management system (EMS) implementation among local authorities in Malaysia / Nero Madi, Corina Joseph and Mariam Rahmat |
title_sort |
impediments in adopting the environmental management system (ems) implementation among local authorities in malaysia / nero madi, corina joseph and mariam rahmat |
publisher |
Faculty of Accountancy |
publishDate |
2016 |
url |
http://ir.uitm.edu.my/id/eprint/28699/1/LP_NERO%20MADI%20RMI%20B%2016_5pdf..PDF http://ir.uitm.edu.my/id/eprint/28699/ |
_version_ |
1685650448683368448 |