Menara Yayasan Selangor / Muhammad Shaiful Nezam Lokman ... [et al.]

In Diploma of Building Surveying, the report of Integrated Final Project is the most important for student of building surveyor which it is the core subject for the final year student of Building Surveyor. This report required a group of students to study and analyze the organization management and...

Full description

Saved in:
Bibliographic Details
Main Authors: Muhammad Shaiful Nezam, Lokman, Muhammad Zuhdi, Ahmad, Norman, Frankie, Nur Athirah Fatin, Mohayidin, Najihah Mahfuzah, Mazlan
Format: Student Project
Language:English
Published: 2019
Subjects:
Online Access:http://ir.uitm.edu.my/id/eprint/34407/1/34407.pdf
http://ir.uitm.edu.my/id/eprint/34407/
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Teknologi Mara
Language: English
id my.uitm.ir.34407
record_format eprints
spelling my.uitm.ir.344072020-09-10T04:25:55Z http://ir.uitm.edu.my/id/eprint/34407/ Menara Yayasan Selangor / Muhammad Shaiful Nezam Lokman ... [et al.] Muhammad Shaiful Nezam, Lokman Muhammad Zuhdi, Ahmad Norman, Frankie Nur Athirah Fatin, Mohayidin Najihah Mahfuzah, Mazlan Maintenance and repair Management of the construction site. Superintendence of building construction Building inspection In Diploma of Building Surveying, the report of Integrated Final Project is the most important for student of building surveyor which it is the core subject for the final year student of Building Surveyor. This report required a group of students to study and analyze the organization management and the building management of a case study building. At the end of the study the students will able to know how a building can be manage through its organization and their maintenance management. This project consists of nine chapter. For the first chapter we will tells about the background of the organization and building and its occupants. For the Chapter 2, we will discuss about the main organization and the maintenance organization. Inthis chapter we will able to know their roles and its responsibility to the building. For the chapter 3, we will full described about maintenance policy, planning and programme at the case study. From this it can be conclude that the building is fully organized and have a proper maintenance planning to keep the building function well. Chapter 4 will cover about the building design and concept of the building and also the special features, building services and facilities, external works and also the special technologies and features that implemented in the building. Next, Chapter 5 will discuss about the building condition assessment of the building. We will analyze the defect and its rectification cost. Moving to the chapter 6, we will describe on details about how the maintenance strategy implemented to the building. Then, in the chapter 7, student have to analyze the legal aspect that implemented to the building. In this chapter we will see the how the tenant occupied in the building. we also have to identify the budget of the maintenance for the building. And determine the forecast budget for the organization in 3 years ahead. Lastly, in chapter 9, we will identify the problem from the chapter 1 to the chapter 8 and make the recommendation from the problem. From the overall chapter that covered of the building, student have to make its conclusion. 2019 Student Project NonPeerReviewed text en http://ir.uitm.edu.my/id/eprint/34407/1/34407.pdf Muhammad Shaiful Nezam, Lokman and Muhammad Zuhdi, Ahmad and Norman, Frankie and Nur Athirah Fatin, Mohayidin and Najihah Mahfuzah, Mazlan (2019) Menara Yayasan Selangor / Muhammad Shaiful Nezam Lokman ... [et al.]. [Student Project] (Unpublished)
institution Universiti Teknologi Mara
building Tun Abdul Razak Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Mara
content_source UiTM Institutional Repository
url_provider http://ir.uitm.edu.my/
language English
topic Maintenance and repair
Management of the construction site. Superintendence of building construction
Building inspection
spellingShingle Maintenance and repair
Management of the construction site. Superintendence of building construction
Building inspection
Muhammad Shaiful Nezam, Lokman
Muhammad Zuhdi, Ahmad
Norman, Frankie
Nur Athirah Fatin, Mohayidin
Najihah Mahfuzah, Mazlan
Menara Yayasan Selangor / Muhammad Shaiful Nezam Lokman ... [et al.]
description In Diploma of Building Surveying, the report of Integrated Final Project is the most important for student of building surveyor which it is the core subject for the final year student of Building Surveyor. This report required a group of students to study and analyze the organization management and the building management of a case study building. At the end of the study the students will able to know how a building can be manage through its organization and their maintenance management. This project consists of nine chapter. For the first chapter we will tells about the background of the organization and building and its occupants. For the Chapter 2, we will discuss about the main organization and the maintenance organization. Inthis chapter we will able to know their roles and its responsibility to the building. For the chapter 3, we will full described about maintenance policy, planning and programme at the case study. From this it can be conclude that the building is fully organized and have a proper maintenance planning to keep the building function well. Chapter 4 will cover about the building design and concept of the building and also the special features, building services and facilities, external works and also the special technologies and features that implemented in the building. Next, Chapter 5 will discuss about the building condition assessment of the building. We will analyze the defect and its rectification cost. Moving to the chapter 6, we will describe on details about how the maintenance strategy implemented to the building. Then, in the chapter 7, student have to analyze the legal aspect that implemented to the building. In this chapter we will see the how the tenant occupied in the building. we also have to identify the budget of the maintenance for the building. And determine the forecast budget for the organization in 3 years ahead. Lastly, in chapter 9, we will identify the problem from the chapter 1 to the chapter 8 and make the recommendation from the problem. From the overall chapter that covered of the building, student have to make its conclusion.
format Student Project
author Muhammad Shaiful Nezam, Lokman
Muhammad Zuhdi, Ahmad
Norman, Frankie
Nur Athirah Fatin, Mohayidin
Najihah Mahfuzah, Mazlan
author_facet Muhammad Shaiful Nezam, Lokman
Muhammad Zuhdi, Ahmad
Norman, Frankie
Nur Athirah Fatin, Mohayidin
Najihah Mahfuzah, Mazlan
author_sort Muhammad Shaiful Nezam, Lokman
title Menara Yayasan Selangor / Muhammad Shaiful Nezam Lokman ... [et al.]
title_short Menara Yayasan Selangor / Muhammad Shaiful Nezam Lokman ... [et al.]
title_full Menara Yayasan Selangor / Muhammad Shaiful Nezam Lokman ... [et al.]
title_fullStr Menara Yayasan Selangor / Muhammad Shaiful Nezam Lokman ... [et al.]
title_full_unstemmed Menara Yayasan Selangor / Muhammad Shaiful Nezam Lokman ... [et al.]
title_sort menara yayasan selangor / muhammad shaiful nezam lokman ... [et al.]
publishDate 2019
url http://ir.uitm.edu.my/id/eprint/34407/1/34407.pdf
http://ir.uitm.edu.my/id/eprint/34407/
_version_ 1685651190658891776