Task allocation in production systems using firefly algorithm / Nurhani Zawani Zulkifli
The assembly line process has been widely used by most manufacturing industries all over the world. In the production systems, the workpieces of the products will be assembled in line and passed through several workstations before they turn into finished products. However, there exists a problem in...
Saved in:
Main Author: | |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2020
|
Subjects: | |
Online Access: | http://ir.uitm.edu.my/id/eprint/35151/1/35151.pdf http://ir.uitm.edu.my/id/eprint/35151/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universiti Teknologi Mara |
Language: | English |
id |
my.uitm.ir.35151 |
---|---|
record_format |
eprints |
spelling |
my.uitm.ir.351512020-10-15T15:40:23Z http://ir.uitm.edu.my/id/eprint/35151/ Task allocation in production systems using firefly algorithm / Nurhani Zawani Zulkifli Zawani Zulkifli, Nurhani Manufacturing industries Algorithms The assembly line process has been widely used by most manufacturing industries all over the world. In the production systems, the workpieces of the products will be assembled in line and passed through several workstations before they turn into finished products. However, there exists a problem in the assembly line process by which the management always deal with unbalancing of the assembly work among the workstations. It is hard for the management to optimize the number of workstations without violating the restriction of the line such as precedence relations among the task. Therefore, from the above matter, this study will solve the Simple Assembly Line Balancing Problem Type 1 (SALBP-1) by minimizing the number of workstations to complete all tasks based on the given cycle time and task time using firefly algorithm. Hence, the number of tasks assigned for each workstation is determined where the total task time for each workstation will not exceeding the cycle time. Thus, the optimal number of workstations needed for 9 tasks is 4 and the total task time for each workstation is not exceeding 10 minutes. As for the recommendation, other metaheuristic and the trend for algorithm hybridization can be applied with the aims of minimizing the number of workstation for SALBP-1. 2020-10-13 Thesis NonPeerReviewed text en http://ir.uitm.edu.my/id/eprint/35151/1/35151.pdf Zawani Zulkifli, Nurhani (2020) Task allocation in production systems using firefly algorithm / Nurhani Zawani Zulkifli. Degree thesis, Universiti Teknologi Mara Perlis. |
institution |
Universiti Teknologi Mara |
building |
Tun Abdul Razak Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Teknologi Mara |
content_source |
UiTM Institutional Repository |
url_provider |
http://ir.uitm.edu.my/ |
language |
English |
topic |
Manufacturing industries Algorithms |
spellingShingle |
Manufacturing industries Algorithms Zawani Zulkifli, Nurhani Task allocation in production systems using firefly algorithm / Nurhani Zawani Zulkifli |
description |
The assembly line process has been widely used by most manufacturing industries all over the world. In the production systems, the workpieces of the products will be assembled in line and passed through several workstations before they turn into finished products. However, there exists a problem in the assembly line process by which the management always deal with unbalancing of the assembly work among the workstations. It is hard for the management to optimize the number of workstations without violating the restriction of the line such as precedence relations among the task. Therefore, from the above matter, this study will solve the Simple Assembly Line Balancing Problem Type 1 (SALBP-1) by minimizing the number of workstations to complete all tasks based on the given cycle time and task time using firefly algorithm. Hence, the number of tasks assigned for each workstation is determined where the total task time for each workstation will not exceeding the cycle time. Thus, the optimal number of workstations needed for 9 tasks is 4 and the total task time for each workstation is not exceeding 10 minutes. As for the recommendation, other metaheuristic and the trend for algorithm hybridization can be applied with the aims of minimizing the number of workstation for SALBP-1. |
format |
Thesis |
author |
Zawani Zulkifli, Nurhani |
author_facet |
Zawani Zulkifli, Nurhani |
author_sort |
Zawani Zulkifli, Nurhani |
title |
Task allocation in production systems using firefly algorithm / Nurhani Zawani Zulkifli |
title_short |
Task allocation in production systems using firefly algorithm / Nurhani Zawani Zulkifli |
title_full |
Task allocation in production systems using firefly algorithm / Nurhani Zawani Zulkifli |
title_fullStr |
Task allocation in production systems using firefly algorithm / Nurhani Zawani Zulkifli |
title_full_unstemmed |
Task allocation in production systems using firefly algorithm / Nurhani Zawani Zulkifli |
title_sort |
task allocation in production systems using firefly algorithm / nurhani zawani zulkifli |
publishDate |
2020 |
url |
http://ir.uitm.edu.my/id/eprint/35151/1/35151.pdf http://ir.uitm.edu.my/id/eprint/35151/ |
_version_ |
1685651270194429952 |