Dynamic safety risk analysis of water plant chlorination using dynamic bow-tie approach / Nor Aqilah Muhamad Nasir

Chlorine is one of the hazardous materials and needs to be handled carefully. In water chlorination system at water treatment plant (WTP), there was potential hazard to the workers and the population nearby the water treatment plant. To identify this hazard, risk assessment is the one of the techniq...

Full description

Saved in:
Bibliographic Details
Main Author: Muhamad Nasir, Nor Aqilah
Format: Student Project
Language:English
Published: 2020
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/38284/1/38284.pdf
https://ir.uitm.edu.my/id/eprint/38284/
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Teknologi Mara
Language: English
id my.uitm.ir.38284
record_format eprints
spelling my.uitm.ir.382842022-10-25T07:57:18Z https://ir.uitm.edu.my/id/eprint/38284/ Dynamic safety risk analysis of water plant chlorination using dynamic bow-tie approach / Nor Aqilah Muhamad Nasir Muhamad Nasir, Nor Aqilah Physical and theoretical chemistry Chemical elements Self-assembly (Chemistry). Decomposition (Chemistry) Flocculation, precipitation, adsorption, etc. Coagulation Sewage disposal systems Treatment, purification, etc. Chlorine is one of the hazardous materials and needs to be handled carefully. In water chlorination system at water treatment plant (WTP), there was potential hazard to the workers and the population nearby the water treatment plant. To identify this hazard, risk assessment is the one of the techniques that can be used to eliminate the hazard and measure the risk other than to identify the hazard. But due to the limitation of being static of conventional risk assessment, many researchers were study to update the conventional risk assessment to the dynamic risk assessment. This paper was aimed to update the conventional bow-tie analysis to the dynamic one by mapping bow-tie (BT) into bayesian network (BN) using Genie software. Posterior probability was used to replace the prior probability in this study to update the conventional to the dynamic. Three time interval was mapping into BN to show the dynamic risk assessment by assuming no maintenance for three years. To conduct this study, Kelar water treatment plant was chosen as the case study. Failure mode effect analysis (FMEA) was used to determine the potential hazard in the water chlorination system. Chlorine leakage from drum was chosen as the worst-case accident for this study of the top event to map the BT and BN. Besides that, ALOHA modeling software was also being used to determine the area concentration of chlorine emission nearby the population of Kelar WTP if there was a chlorine leakage. The worst cases of the accident was a leaking from 5 mm hole of body drum that would affect about 15 villages nearby the Kelar WTP. By implementing this approach, the accident can be prevented as well as eliminated. 2020-09 Student Project NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/38284/1/38284.pdf Dynamic safety risk analysis of water plant chlorination using dynamic bow-tie approach / Nor Aqilah Muhamad Nasir. (2020) [Student Project] <http://terminalib.uitm.edu.my/38284.pdf> (Unpublished)
institution Universiti Teknologi Mara
building Tun Abdul Razak Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Mara
content_source UiTM Institutional Repository
url_provider http://ir.uitm.edu.my/
language English
topic Physical and theoretical chemistry
Chemical elements
Self-assembly (Chemistry). Decomposition (Chemistry)
Flocculation, precipitation, adsorption, etc. Coagulation
Sewage disposal systems
Treatment, purification, etc.
spellingShingle Physical and theoretical chemistry
Chemical elements
Self-assembly (Chemistry). Decomposition (Chemistry)
Flocculation, precipitation, adsorption, etc. Coagulation
Sewage disposal systems
Treatment, purification, etc.
Muhamad Nasir, Nor Aqilah
Dynamic safety risk analysis of water plant chlorination using dynamic bow-tie approach / Nor Aqilah Muhamad Nasir
description Chlorine is one of the hazardous materials and needs to be handled carefully. In water chlorination system at water treatment plant (WTP), there was potential hazard to the workers and the population nearby the water treatment plant. To identify this hazard, risk assessment is the one of the techniques that can be used to eliminate the hazard and measure the risk other than to identify the hazard. But due to the limitation of being static of conventional risk assessment, many researchers were study to update the conventional risk assessment to the dynamic risk assessment. This paper was aimed to update the conventional bow-tie analysis to the dynamic one by mapping bow-tie (BT) into bayesian network (BN) using Genie software. Posterior probability was used to replace the prior probability in this study to update the conventional to the dynamic. Three time interval was mapping into BN to show the dynamic risk assessment by assuming no maintenance for three years. To conduct this study, Kelar water treatment plant was chosen as the case study. Failure mode effect analysis (FMEA) was used to determine the potential hazard in the water chlorination system. Chlorine leakage from drum was chosen as the worst-case accident for this study of the top event to map the BT and BN. Besides that, ALOHA modeling software was also being used to determine the area concentration of chlorine emission nearby the population of Kelar WTP if there was a chlorine leakage. The worst cases of the accident was a leaking from 5 mm hole of body drum that would affect about 15 villages nearby the Kelar WTP. By implementing this approach, the accident can be prevented as well as eliminated.
format Student Project
author Muhamad Nasir, Nor Aqilah
author_facet Muhamad Nasir, Nor Aqilah
author_sort Muhamad Nasir, Nor Aqilah
title Dynamic safety risk analysis of water plant chlorination using dynamic bow-tie approach / Nor Aqilah Muhamad Nasir
title_short Dynamic safety risk analysis of water plant chlorination using dynamic bow-tie approach / Nor Aqilah Muhamad Nasir
title_full Dynamic safety risk analysis of water plant chlorination using dynamic bow-tie approach / Nor Aqilah Muhamad Nasir
title_fullStr Dynamic safety risk analysis of water plant chlorination using dynamic bow-tie approach / Nor Aqilah Muhamad Nasir
title_full_unstemmed Dynamic safety risk analysis of water plant chlorination using dynamic bow-tie approach / Nor Aqilah Muhamad Nasir
title_sort dynamic safety risk analysis of water plant chlorination using dynamic bow-tie approach / nor aqilah muhamad nasir
publishDate 2020
url https://ir.uitm.edu.my/id/eprint/38284/1/38284.pdf
https://ir.uitm.edu.my/id/eprint/38284/
_version_ 1748183837893984256