Installation of waterproofing / Nurul Atikah Mursidi

The use of waterproofing had been the necessary item in construction. People are well known with the importance of it. So that it is cannot be taken easily on its installation, on choosing of it, and so on. Building is a shelter for us to live longer. If we are not aware of some defect on building l...

Full description

Saved in:
Bibliographic Details
Main Author: Mursidi, Nurul Atikah
Format: Student Project
Language:English
Published: 2018
Subjects:
Online Access:http://ir.uitm.edu.my/id/eprint/43385/1/43385.pdf
http://ir.uitm.edu.my/id/eprint/43385/
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Teknologi Mara
Language: English
id my.uitm.ir.43385
record_format eprints
spelling my.uitm.ir.433852021-03-12T03:27:15Z http://ir.uitm.edu.my/id/eprint/43385/ Installation of waterproofing / Nurul Atikah Mursidi Mursidi, Nurul Atikah Building materials Malaysia Details in building design and construction.Including walls, roofs Maintenance and repair Building inspection Building failures, errors, defects, etc. The use of waterproofing had been the necessary item in construction. People are well known with the importance of it. So that it is cannot be taken easily on its installation, on choosing of it, and so on. Building is a shelter for us to live longer. If we are not aware of some defect on building like dampness that will affect the building structure and directly toward us, it will be no other than harming. People’s fiancé, living lifestyle, emotional and physical will get affect if there is no initial act taken from getting the building a waterproofing to prevent sort of defects. So the installation of waterproofing firstly needs to be carried out well. The neat steps taken will produce an effective functional of waterproofing. Other than that, any goods way and action also should be taken. Long short, first chapter is basically explaining my company organisation that I have been doing my internship about 4 month a semester. How many section and department in total and its function gathered in the chapter. Each of sections and departments are playing different and specific roles. Total of staff also can be allocated. They have a leader and work together as a team to reach the main objective of JKR and to ensure the process and progress goes smooth. Second chapter is the medium for understanding of the title of this report, Installation of Waterproofing. This chapter contain the information, knowledge, point of the waterproofing for building. The needs of waterproofing and implication of not apply it were stated in this chapter. Awareness of using waterproofing has been point out. Building really needs to be in a good condition and one of it can be by using the waterproofing. Case study chapter is on the third chapter. There are lots of site I have been visit and 3 of them are related to my investigation/observation, about waterproofing. There are different type of waterproofing have been used on each site. Furthermore, method installations are also not the same. The two of them are on the new construction project while the other one is for maintenance project. As I have observe the process, the chapter will showing the output. Chapter 4 and 5 are the closing of the report. While going through my observation and study process, there are not all in a good term. There must be some lacking as natural everything being imperfect. So, chapter 4 spotted the problems in doing the study also some unpopular relatable suggestion to improvise it. Meanwhile, chapter 5 conclude the whole report generally since conclusion are about to reach the objective of the report like knowing about the title of report, waterproofing. 2018 Student Project NonPeerReviewed text en http://ir.uitm.edu.my/id/eprint/43385/1/43385.pdf Mursidi, Nurul Atikah (2018) Installation of waterproofing / Nurul Atikah Mursidi. [Student Project] (Unpublished)
institution Universiti Teknologi Mara
building Tun Abdul Razak Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Mara
content_source UiTM Institutional Repository
url_provider http://ir.uitm.edu.my/
language English
topic Building materials
Malaysia
Details in building design and construction.Including walls, roofs
Maintenance and repair
Building inspection
Building failures, errors, defects, etc.
spellingShingle Building materials
Malaysia
Details in building design and construction.Including walls, roofs
Maintenance and repair
Building inspection
Building failures, errors, defects, etc.
Mursidi, Nurul Atikah
Installation of waterproofing / Nurul Atikah Mursidi
description The use of waterproofing had been the necessary item in construction. People are well known with the importance of it. So that it is cannot be taken easily on its installation, on choosing of it, and so on. Building is a shelter for us to live longer. If we are not aware of some defect on building like dampness that will affect the building structure and directly toward us, it will be no other than harming. People’s fiancé, living lifestyle, emotional and physical will get affect if there is no initial act taken from getting the building a waterproofing to prevent sort of defects. So the installation of waterproofing firstly needs to be carried out well. The neat steps taken will produce an effective functional of waterproofing. Other than that, any goods way and action also should be taken. Long short, first chapter is basically explaining my company organisation that I have been doing my internship about 4 month a semester. How many section and department in total and its function gathered in the chapter. Each of sections and departments are playing different and specific roles. Total of staff also can be allocated. They have a leader and work together as a team to reach the main objective of JKR and to ensure the process and progress goes smooth. Second chapter is the medium for understanding of the title of this report, Installation of Waterproofing. This chapter contain the information, knowledge, point of the waterproofing for building. The needs of waterproofing and implication of not apply it were stated in this chapter. Awareness of using waterproofing has been point out. Building really needs to be in a good condition and one of it can be by using the waterproofing. Case study chapter is on the third chapter. There are lots of site I have been visit and 3 of them are related to my investigation/observation, about waterproofing. There are different type of waterproofing have been used on each site. Furthermore, method installations are also not the same. The two of them are on the new construction project while the other one is for maintenance project. As I have observe the process, the chapter will showing the output. Chapter 4 and 5 are the closing of the report. While going through my observation and study process, there are not all in a good term. There must be some lacking as natural everything being imperfect. So, chapter 4 spotted the problems in doing the study also some unpopular relatable suggestion to improvise it. Meanwhile, chapter 5 conclude the whole report generally since conclusion are about to reach the objective of the report like knowing about the title of report, waterproofing.
format Student Project
author Mursidi, Nurul Atikah
author_facet Mursidi, Nurul Atikah
author_sort Mursidi, Nurul Atikah
title Installation of waterproofing / Nurul Atikah Mursidi
title_short Installation of waterproofing / Nurul Atikah Mursidi
title_full Installation of waterproofing / Nurul Atikah Mursidi
title_fullStr Installation of waterproofing / Nurul Atikah Mursidi
title_full_unstemmed Installation of waterproofing / Nurul Atikah Mursidi
title_sort installation of waterproofing / nurul atikah mursidi
publishDate 2018
url http://ir.uitm.edu.my/id/eprint/43385/1/43385.pdf
http://ir.uitm.edu.my/id/eprint/43385/
_version_ 1695534673090838528