Integrative mechanisms in the design process of building refurbishment projects / Azlan Shah Ali

This thesis reports an empirical study on uncertainty aspects in the design process of refurbishment projects in Malaysia. The study focuses on the identification of the project variables that are associated with design performance. The investigation also introduced the functions of integrative mech...

Full description

Saved in:
Bibliographic Details
Main Author: Ali, Azlan Shah
Format: Thesis
Language:English
Published: 2008
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/43437/2/43437.pdf
https://ir.uitm.edu.my/id/eprint/43437/
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Teknologi Mara
Language: English
id my.uitm.ir.43437
record_format eprints
spelling my.uitm.ir.434372024-02-14T00:06:33Z https://ir.uitm.edu.my/id/eprint/43437/ Integrative mechanisms in the design process of building refurbishment projects / Azlan Shah Ali Ali, Azlan Shah Maintenance and repair Management of the construction site. Superintendence of building construction Building fittings and their installation This thesis reports an empirical study on uncertainty aspects in the design process of refurbishment projects in Malaysia. The study focuses on the identification of the project variables that are associated with design performance. The investigation also introduced the functions of integrative mechanisms, which consist of coordination devices and the degree of involvement of key participants in decision-making, as a means to integrate management into the design process. This is paramount in order to increase information processing capacity during the design process. The study adopted a triangulation technique that combined both quantitative and qualitative methods of data collection. One-thousand-five-hundred-and-fifty-two (1552) questionnaires were sent out to registered professional architects in the preliminary questionnaire survey to partially validate the theoretical framework of the study and to obtain a general profile of refurbishment design activities in Malaysia and a 24 percent response rate was achieved. In addition, 21 semi-structured interviews were carried out with selected respondents. The third part of the triangulation involved a final questionnaire survey. Eighty-two (82) out of 234 questionnaires from the final questionnaire were found to be useful and formed a database for data analysis purposes. The Statistical Package for Social Science (SPSS) was used in the data analysis for both descriptive and inferential statistics. The study identified fifteen (15) dominant project variables concerned with the design process of refurbishment projects and, of those, eight variables were found to be significantly correlated to design performance. The variables are: availability of design information, structural content, services content, statutory requirements, clients' attributes, clients' needs, design fees and project funding. The greater part of design process suffers from uncertainty nature of the projects. Almost half of refurbishment projects prepare design with less than 70 percent information available. It was also found that integrative mechanisms contribute toward the improvement of the design performance. All coordination devices were found to be significantly associated with at least one of the performance variables. In addition, a high degree of involvement by architect and M&E engineer during the construction stage improved refurbishment design performance. The design performance recorded more than three-quarters of refurbishment projects exceed the targeted design time and cost. From the findings, it could be concluded that the major part of the design process of refurbishment projects suffered from the uncertain nature of the projects. The implementation of integrative mechanisms indicated the possibility of improving some of the design performance. However, the use of integrative mechanisms in the design process is based mainly on the degree of uncertainty that occurs in refurbishment projects. 2008 Thesis NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/43437/2/43437.pdf Integrative mechanisms in the design process of building refurbishment projects / Azlan Shah Ali. (2008) PhD thesis, thesis, Universiti Teknologi MARA.
institution Universiti Teknologi Mara
building Tun Abdul Razak Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Mara
content_source UiTM Institutional Repository
url_provider http://ir.uitm.edu.my/
language English
topic Maintenance and repair
Management of the construction site. Superintendence of building construction
Building fittings and their installation
spellingShingle Maintenance and repair
Management of the construction site. Superintendence of building construction
Building fittings and their installation
Ali, Azlan Shah
Integrative mechanisms in the design process of building refurbishment projects / Azlan Shah Ali
description This thesis reports an empirical study on uncertainty aspects in the design process of refurbishment projects in Malaysia. The study focuses on the identification of the project variables that are associated with design performance. The investigation also introduced the functions of integrative mechanisms, which consist of coordination devices and the degree of involvement of key participants in decision-making, as a means to integrate management into the design process. This is paramount in order to increase information processing capacity during the design process. The study adopted a triangulation technique that combined both quantitative and qualitative methods of data collection. One-thousand-five-hundred-and-fifty-two (1552) questionnaires were sent out to registered professional architects in the preliminary questionnaire survey to partially validate the theoretical framework of the study and to obtain a general profile of refurbishment design activities in Malaysia and a 24 percent response rate was achieved. In addition, 21 semi-structured interviews were carried out with selected respondents. The third part of the triangulation involved a final questionnaire survey. Eighty-two (82) out of 234 questionnaires from the final questionnaire were found to be useful and formed a database for data analysis purposes. The Statistical Package for Social Science (SPSS) was used in the data analysis for both descriptive and inferential statistics. The study identified fifteen (15) dominant project variables concerned with the design process of refurbishment projects and, of those, eight variables were found to be significantly correlated to design performance. The variables are: availability of design information, structural content, services content, statutory requirements, clients' attributes, clients' needs, design fees and project funding. The greater part of design process suffers from uncertainty nature of the projects. Almost half of refurbishment projects prepare design with less than 70 percent information available. It was also found that integrative mechanisms contribute toward the improvement of the design performance. All coordination devices were found to be significantly associated with at least one of the performance variables. In addition, a high degree of involvement by architect and M&E engineer during the construction stage improved refurbishment design performance. The design performance recorded more than three-quarters of refurbishment projects exceed the targeted design time and cost. From the findings, it could be concluded that the major part of the design process of refurbishment projects suffered from the uncertain nature of the projects. The implementation of integrative mechanisms indicated the possibility of improving some of the design performance. However, the use of integrative mechanisms in the design process is based mainly on the degree of uncertainty that occurs in refurbishment projects.
format Thesis
author Ali, Azlan Shah
author_facet Ali, Azlan Shah
author_sort Ali, Azlan Shah
title Integrative mechanisms in the design process of building refurbishment projects / Azlan Shah Ali
title_short Integrative mechanisms in the design process of building refurbishment projects / Azlan Shah Ali
title_full Integrative mechanisms in the design process of building refurbishment projects / Azlan Shah Ali
title_fullStr Integrative mechanisms in the design process of building refurbishment projects / Azlan Shah Ali
title_full_unstemmed Integrative mechanisms in the design process of building refurbishment projects / Azlan Shah Ali
title_sort integrative mechanisms in the design process of building refurbishment projects / azlan shah ali
publishDate 2008
url https://ir.uitm.edu.my/id/eprint/43437/2/43437.pdf
https://ir.uitm.edu.my/id/eprint/43437/
_version_ 1792159318654582784