Architectural work quality standard for BinaRaya Group PKINK / Muhammad Shahrin Safri
Quality Standard in construction industry consists of three main work which are Structural work, Architectural work and Mechanical work. A quality construction project should be carry out by expertise project team in handling the quality standard assessment and should be applying in building work An...
Saved in:
Main Author: | |
---|---|
Format: | Monograph |
Language: | English |
Published: |
Universiti Teknologi Mara, Perak
2014
|
Subjects: | |
Online Access: | http://ir.uitm.edu.my/id/eprint/48510/1/48510.pdf http://ir.uitm.edu.my/id/eprint/48510/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universiti Teknologi Mara |
Language: | English |
id |
my.uitm.ir.48510 |
---|---|
record_format |
eprints |
spelling |
my.uitm.ir.485102021-07-09T05:44:48Z http://ir.uitm.edu.my/id/eprint/48510/ Architectural work quality standard for BinaRaya Group PKINK / Muhammad Shahrin Safri Safri, Muhammad Shahrin Theory. Philosophy. Including aesthetics, architectonics, classification, semiotics. Symbolism in architecture Architecture in relation to special subjects Malaysia Sustainable architecture Malaysia Architectural drawing and design Quality Standard in construction industry consists of three main work which are Structural work, Architectural work and Mechanical work. A quality construction project should be carry out by expertise project team in handling the quality standard assessment and should be applying in building work An Architect, Main Contractor, Quantity Surveyor, M&E Consultant and C&S Consultant should be take any Quality Standard Assessment for building work as their guidance to carry out any building work. Nowadays, this assessment is rarely use due to the attitude such as quickly going to be finished a project and to get more profit from a project. During the practical period in Kelantan where the site is specifically located in Rantau Panjang under the Binaraya PKINK company, the construction works are fully done through the structural work since the practical started. What is only left are finishing work and cleaning work. Thus, it is a constraint and limitation to develop the knowledge in construction. Universiti Teknologi Mara, Perak 2014 Monograph NonPeerReviewed text en http://ir.uitm.edu.my/id/eprint/48510/1/48510.pdf ID48510 Safri, Muhammad Shahrin (2014) Architectural work quality standard for BinaRaya Group PKINK / Muhammad Shahrin Safri. Industrial / Practical Training Report. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished) |
institution |
Universiti Teknologi Mara |
building |
Tun Abdul Razak Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Teknologi Mara |
content_source |
UiTM Institutional Repository |
url_provider |
http://ir.uitm.edu.my/ |
language |
English |
topic |
Theory. Philosophy. Including aesthetics, architectonics, classification, semiotics. Symbolism in architecture Architecture in relation to special subjects Malaysia Sustainable architecture Malaysia Architectural drawing and design |
spellingShingle |
Theory. Philosophy. Including aesthetics, architectonics, classification, semiotics. Symbolism in architecture Architecture in relation to special subjects Malaysia Sustainable architecture Malaysia Architectural drawing and design Safri, Muhammad Shahrin Architectural work quality standard for BinaRaya Group PKINK / Muhammad Shahrin Safri |
description |
Quality Standard in construction industry consists of three main work which are Structural work, Architectural work and Mechanical work. A quality construction project should be carry out by expertise project team in handling the quality standard assessment and should be applying in building work An Architect, Main Contractor, Quantity Surveyor, M&E Consultant and C&S Consultant should be take any Quality Standard Assessment for building work as their guidance to carry out any building work. Nowadays, this assessment is rarely use due to the attitude such as quickly going to be finished a project and to get more profit from a project. During the practical period in Kelantan where the site is specifically located in Rantau
Panjang under the Binaraya PKINK company, the construction works are fully done through the structural work since the practical started. What is only left are finishing work and cleaning work. Thus, it is a constraint and limitation to develop the knowledge in construction. |
format |
Monograph |
author |
Safri, Muhammad Shahrin |
author_facet |
Safri, Muhammad Shahrin |
author_sort |
Safri, Muhammad Shahrin |
title |
Architectural work quality standard for BinaRaya Group PKINK / Muhammad Shahrin Safri |
title_short |
Architectural work quality standard for BinaRaya Group PKINK / Muhammad Shahrin Safri |
title_full |
Architectural work quality standard for BinaRaya Group PKINK / Muhammad Shahrin Safri |
title_fullStr |
Architectural work quality standard for BinaRaya Group PKINK / Muhammad Shahrin Safri |
title_full_unstemmed |
Architectural work quality standard for BinaRaya Group PKINK / Muhammad Shahrin Safri |
title_sort |
architectural work quality standard for binaraya group pkink / muhammad shahrin safri |
publisher |
Universiti Teknologi Mara, Perak |
publishDate |
2014 |
url |
http://ir.uitm.edu.my/id/eprint/48510/1/48510.pdf http://ir.uitm.edu.my/id/eprint/48510/ |
_version_ |
1705059595672616960 |