Aeon Anggun Rawang, Rawang,Selangor Darul Ehsan / Ahmad Mu’az Ahmad ... [et al.]

This report represent the building of the Aeon Anggun Mall Rawang as for the case study for Integrated Final Project (BSR ).subject. From the first day of the visiting, it is to find the building and take the full permission to do the study work from department facilities management of Aeon Anggun R...

Full description

Saved in:
Bibliographic Details
Main Authors: Ahmad, Ahmad Mu’az, Abu Bakar, Azlan, Abdul Razak, Muhammad Zariff, Mohd Rosley, Fahda Amani, Sharom, Nurfazirah
Format: Monograph
Language:English
Published: Universiti Teknologi Mara, Perak 2016
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/50170/1/50170.pdf
https://ir.uitm.edu.my/id/eprint/50170/
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Teknologi Mara
Language: English
id my.uitm.ir.50170
record_format eprints
spelling my.uitm.ir.501702021-09-07T01:28:00Z https://ir.uitm.edu.my/id/eprint/50170/ Aeon Anggun Rawang, Rawang,Selangor Darul Ehsan / Ahmad Mu’az Ahmad ... [et al.] Ahmad, Ahmad Mu’az Abu Bakar, Azlan Abdul Razak, Muhammad Zariff Mohd Rosley, Fahda Amani Sharom, Nurfazirah Maintenance and repair Building inspection Building fittings and their installation Maintenance and repair Architectural engineering. Structural engineering of buildings Sustainable buildings. Sustainable construction This report represent the building of the Aeon Anggun Mall Rawang as for the case study for Integrated Final Project (BSR ).subject. From the first day of the visiting, it is to find the building and take the full permission to do the study work from department facilities management of Aeon Anggun Rawang’s. There are tons of information that have to find and collect through a few ways regarding to the several chapters such as building background, building design, building services, maintenance management, legal aspect, and maintenance financial budget. The method to get the information is by general research, observation, took some photos as the evidence, interview session and from lecturer notes. The building have two main floor which the ground floor and 1st floor is full with various of tenant such as Old Town White Coffee, Big Apple, Penang xpress. AEON Anggun Mall Rawang using two maintenance department which are in house and also out source. Moreover, every service is run by special skill work. Maintenance strategy was performed to observe and managed the function of the building to be in good condition, safe and comfortable for the occupants and system in the building. AEON Anggun Rawang has 104 tenant that has been agree with the requirement that been list by the AEON Department.The contract content for the tenant and maintenance must follow the contract , if any problem happened AEON Anggun Rawang can take an action on ending the contract for example the tenant not paying the rent. Next is the regulation of AEON Anggun Rawang comply with the Uniform Building By Law 1994 (UBBL 1984), Street Drainage & Building 1974 (ACT 1974), Occupational Safety & Health 1994 (OSHA) and Electricity Supply Act 1990 (Act 447). As for the cash flow, the income of AEON Anggun Rawang gained from the allocation maintenance, tenant rental, kiosks, weighing scale machine, parking lot and massage chair. The expenditure is on the maintenance outsource, utilities, general expenditure such as office expenditures, staff salaries and network bills. Universiti Teknologi Mara, Perak 2016 Monograph NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/50170/1/50170.pdf ID50170 Ahmad, Ahmad Mu’az and Abu Bakar, Azlan and Abdul Razak, Muhammad Zariff and Mohd Rosley, Fahda Amani and Sharom, Nurfazirah (2016) Aeon Anggun Rawang, Rawang,Selangor Darul Ehsan / Ahmad Mu’az Ahmad ... [et al.]. Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)
institution Universiti Teknologi Mara
building Tun Abdul Razak Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Mara
content_source UiTM Institutional Repository
url_provider http://ir.uitm.edu.my/
language English
topic Maintenance and repair
Building inspection
Building fittings and their installation
Maintenance and repair
Architectural engineering. Structural engineering of buildings
Sustainable buildings. Sustainable construction
spellingShingle Maintenance and repair
Building inspection
Building fittings and their installation
Maintenance and repair
Architectural engineering. Structural engineering of buildings
Sustainable buildings. Sustainable construction
Ahmad, Ahmad Mu’az
Abu Bakar, Azlan
Abdul Razak, Muhammad Zariff
Mohd Rosley, Fahda Amani
Sharom, Nurfazirah
Aeon Anggun Rawang, Rawang,Selangor Darul Ehsan / Ahmad Mu’az Ahmad ... [et al.]
description This report represent the building of the Aeon Anggun Mall Rawang as for the case study for Integrated Final Project (BSR ).subject. From the first day of the visiting, it is to find the building and take the full permission to do the study work from department facilities management of Aeon Anggun Rawang’s. There are tons of information that have to find and collect through a few ways regarding to the several chapters such as building background, building design, building services, maintenance management, legal aspect, and maintenance financial budget. The method to get the information is by general research, observation, took some photos as the evidence, interview session and from lecturer notes. The building have two main floor which the ground floor and 1st floor is full with various of tenant such as Old Town White Coffee, Big Apple, Penang xpress. AEON Anggun Mall Rawang using two maintenance department which are in house and also out source. Moreover, every service is run by special skill work. Maintenance strategy was performed to observe and managed the function of the building to be in good condition, safe and comfortable for the occupants and system in the building. AEON Anggun Rawang has 104 tenant that has been agree with the requirement that been list by the AEON Department.The contract content for the tenant and maintenance must follow the contract , if any problem happened AEON Anggun Rawang can take an action on ending the contract for example the tenant not paying the rent. Next is the regulation of AEON Anggun Rawang comply with the Uniform Building By Law 1994 (UBBL 1984), Street Drainage & Building 1974 (ACT 1974), Occupational Safety & Health 1994 (OSHA) and Electricity Supply Act 1990 (Act 447). As for the cash flow, the income of AEON Anggun Rawang gained from the allocation maintenance, tenant rental, kiosks, weighing scale machine, parking lot and massage chair. The expenditure is on the maintenance outsource, utilities, general expenditure such as office expenditures, staff salaries and network bills.
format Monograph
author Ahmad, Ahmad Mu’az
Abu Bakar, Azlan
Abdul Razak, Muhammad Zariff
Mohd Rosley, Fahda Amani
Sharom, Nurfazirah
author_facet Ahmad, Ahmad Mu’az
Abu Bakar, Azlan
Abdul Razak, Muhammad Zariff
Mohd Rosley, Fahda Amani
Sharom, Nurfazirah
author_sort Ahmad, Ahmad Mu’az
title Aeon Anggun Rawang, Rawang,Selangor Darul Ehsan / Ahmad Mu’az Ahmad ... [et al.]
title_short Aeon Anggun Rawang, Rawang,Selangor Darul Ehsan / Ahmad Mu’az Ahmad ... [et al.]
title_full Aeon Anggun Rawang, Rawang,Selangor Darul Ehsan / Ahmad Mu’az Ahmad ... [et al.]
title_fullStr Aeon Anggun Rawang, Rawang,Selangor Darul Ehsan / Ahmad Mu’az Ahmad ... [et al.]
title_full_unstemmed Aeon Anggun Rawang, Rawang,Selangor Darul Ehsan / Ahmad Mu’az Ahmad ... [et al.]
title_sort aeon anggun rawang, rawang,selangor darul ehsan / ahmad mu’az ahmad ... [et al.]
publisher Universiti Teknologi Mara, Perak
publishDate 2016
url https://ir.uitm.edu.my/id/eprint/50170/1/50170.pdf
https://ir.uitm.edu.my/id/eprint/50170/
_version_ 1710678961554456576