Menara 2, Kompleks Kejuruteraan, UiTM Shah Alam / Afiq Haiqal Amirudin ... [et al.]
The purpose of the Integrated Final Project is to enable students to apply what they have learnt from the Semester 1 to Semester 5. It was important for the students to carry out this project to produce the Final Project Report to meet the requirement of this subject. By doing this project, we are o...
Saved in:
Main Authors: | , , , , |
---|---|
Format: | Monograph |
Language: | English |
Published: |
Universiti Teknologi Mara, Perak
2017
|
Subjects: | |
Online Access: | https://ir.uitm.edu.my/id/eprint/50245/1/50245.pdf https://ir.uitm.edu.my/id/eprint/50245/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universiti Teknologi Mara |
Language: | English |
Summary: | The purpose of the Integrated Final Project is to enable students to apply what they have learnt from the Semester 1 to Semester 5. It was important for the students to carry out this project to produce the Final Project Report to meet the requirement of this subject. By doing this project, we are obligated to know overall information of our case study from the substructure until the superstructure. We have chosen Tower 2, Faculty of Electrical Engineering, UiTM Shah Alam as our
case study for the Integrated Final Project. The building is an institutional building in a university located at UiTM Main Campus which is in Shah Alam, Selangor. The institute can be access directly from Federal Highwal and NKVE from the city centre while through Guthrie Highway from the Utara-Selatan Highway. FKE Tower 2 was constructed in 2005 and the year of completion in 2007. The design characteristics are based on their shape, material, and orientation of the building. The shape of this building is C – Curve shape. The gross floor area of tee building is approximately around 17,781.50 m2. The building is mainly used of education purpose, with lecture rooms, computer labs, seminar room, and lecturers room. As the conclusion, completing this Integrated Final Project we have gained more output and knowledge regarding the maintenance work, building design, financial analysis and legal aspect. We are thankful due to this project we get to gain experience on site and how to handle the whole project to produce a report. We hope that our hardwork in producing the report will satisfy the requirement needed for the subject and we get to deliver the best of it. |
---|