The application of ACOTEC system in the industrialised building system: the case study of medium cost apartment in Sungai Nibong, Pulau Pinang / Ahmad Mu’az Ahmad
Industry of construction has been revolved from many centuries. As we known the traditional method of construction has many disadvantages than advantages. Within the past the engineer has been develop new technology to clear the disadvantages that been faced by many contractors. The technology is ca...
Saved in:
Main Author: | |
---|---|
Format: | Student Project |
Language: | English |
Published: |
2017
|
Subjects: | |
Online Access: | https://ir.uitm.edu.my/id/eprint/56630/1/56630.pdf https://ir.uitm.edu.my/id/eprint/56630/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universiti Teknologi Mara |
Language: | English |
id |
my.uitm.ir.56630 |
---|---|
record_format |
eprints |
spelling |
my.uitm.ir.566302022-03-06T00:11:42Z https://ir.uitm.edu.my/id/eprint/56630/ The application of ACOTEC system in the industrialised building system: the case study of medium cost apartment in Sungai Nibong, Pulau Pinang / Ahmad Mu’az Ahmad Ahmad, Ahmad Mu’az TH Building construction Systems of building construction. Industrialized building Industry of construction has been revolved from many centuries. As we known the traditional method of construction has many disadvantages than advantages. Within the past the engineer has been develop new technology to clear the disadvantages that been faced by many contractors. The technology is called as Industrialised Building System(IBS) that a technology that give the east to do work. Also the IBS has effect the cost of construction and duration of construction. This report will enlighten readers about the Industrialised Building System(IBS) that been applicate to the construction of Medium Cost Apartment. To gain the information about this title report, the writer did an observation by himself at the site and also referred to books from the USM library and writer also did a few interviews with the site personnel. The tittle of this report is “The Application of ACOTEC System in the Industrialised Building System (IBS): The case Study of Medium Cost Apartment in Sungai Nibong” as a case study. 2017 Student Project NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/56630/1/56630.pdf ID56630 Ahmad, Ahmad Mu’az (2017) The application of ACOTEC system in the industrialised building system: the case study of medium cost apartment in Sungai Nibong, Pulau Pinang / Ahmad Mu’az Ahmad. [Student Project] |
institution |
Universiti Teknologi Mara |
building |
Tun Abdul Razak Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Teknologi Mara |
content_source |
UiTM Institutional Repository |
url_provider |
http://ir.uitm.edu.my/ |
language |
English |
topic |
TH Building construction Systems of building construction. Industrialized building |
spellingShingle |
TH Building construction Systems of building construction. Industrialized building Ahmad, Ahmad Mu’az The application of ACOTEC system in the industrialised building system: the case study of medium cost apartment in Sungai Nibong, Pulau Pinang / Ahmad Mu’az Ahmad |
description |
Industry of construction has been revolved from many centuries. As we known the traditional method of construction has many disadvantages than advantages. Within the past the engineer has been develop new technology to clear the disadvantages that been faced by many contractors. The technology is called as Industrialised Building System(IBS) that a technology that give the east to do work. Also the IBS has effect the cost of construction and duration of construction. This report will enlighten readers about the Industrialised Building System(IBS) that been applicate to the construction of Medium Cost Apartment. To gain the information about this title report, the writer did an observation by himself at the site and also referred to books from the USM library and writer also did a few interviews with the site personnel. The tittle of this report is “The Application of ACOTEC System in the Industrialised Building System (IBS): The case Study of Medium Cost Apartment in Sungai Nibong” as a case study. |
format |
Student Project |
author |
Ahmad, Ahmad Mu’az |
author_facet |
Ahmad, Ahmad Mu’az |
author_sort |
Ahmad, Ahmad Mu’az |
title |
The application of ACOTEC system in the industrialised building system: the case study of medium cost apartment in Sungai Nibong, Pulau Pinang
/ Ahmad Mu’az Ahmad |
title_short |
The application of ACOTEC system in the industrialised building system: the case study of medium cost apartment in Sungai Nibong, Pulau Pinang
/ Ahmad Mu’az Ahmad |
title_full |
The application of ACOTEC system in the industrialised building system: the case study of medium cost apartment in Sungai Nibong, Pulau Pinang
/ Ahmad Mu’az Ahmad |
title_fullStr |
The application of ACOTEC system in the industrialised building system: the case study of medium cost apartment in Sungai Nibong, Pulau Pinang
/ Ahmad Mu’az Ahmad |
title_full_unstemmed |
The application of ACOTEC system in the industrialised building system: the case study of medium cost apartment in Sungai Nibong, Pulau Pinang
/ Ahmad Mu’az Ahmad |
title_sort |
application of acotec system in the industrialised building system: the case study of medium cost apartment in sungai nibong, pulau pinang
/ ahmad mu’az ahmad |
publishDate |
2017 |
url |
https://ir.uitm.edu.my/id/eprint/56630/1/56630.pdf https://ir.uitm.edu.my/id/eprint/56630/ |
_version_ |
1726795683203121152 |