The application of ACOTEC system in the industrialised building system: the case study of medium cost apartment in Sungai Nibong, Pulau Pinang / Ahmad Mu’az Ahmad

Industry of construction has been revolved from many centuries. As we known the traditional method of construction has many disadvantages than advantages. Within the past the engineer has been develop new technology to clear the disadvantages that been faced by many contractors. The technology is ca...

Full description

Saved in:
Bibliographic Details
Main Author: Ahmad, Ahmad Mu’az
Format: Student Project
Language:English
Published: 2017
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/56630/1/56630.pdf
https://ir.uitm.edu.my/id/eprint/56630/
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Teknologi Mara
Language: English
id my.uitm.ir.56630
record_format eprints
spelling my.uitm.ir.566302022-03-06T00:11:42Z https://ir.uitm.edu.my/id/eprint/56630/ The application of ACOTEC system in the industrialised building system: the case study of medium cost apartment in Sungai Nibong, Pulau Pinang / Ahmad Mu’az Ahmad Ahmad, Ahmad Mu’az TH Building construction Systems of building construction. Industrialized building Industry of construction has been revolved from many centuries. As we known the traditional method of construction has many disadvantages than advantages. Within the past the engineer has been develop new technology to clear the disadvantages that been faced by many contractors. The technology is called as Industrialised Building System(IBS) that a technology that give the east to do work. Also the IBS has effect the cost of construction and duration of construction. This report will enlighten readers about the Industrialised Building System(IBS) that been applicate to the construction of Medium Cost Apartment. To gain the information about this title report, the writer did an observation by himself at the site and also referred to books from the USM library and writer also did a few interviews with the site personnel. The tittle of this report is “The Application of ACOTEC System in the Industrialised Building System (IBS): The case Study of Medium Cost Apartment in Sungai Nibong” as a case study. 2017 Student Project NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/56630/1/56630.pdf ID56630 Ahmad, Ahmad Mu’az (2017) The application of ACOTEC system in the industrialised building system: the case study of medium cost apartment in Sungai Nibong, Pulau Pinang / Ahmad Mu’az Ahmad. [Student Project]
institution Universiti Teknologi Mara
building Tun Abdul Razak Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Mara
content_source UiTM Institutional Repository
url_provider http://ir.uitm.edu.my/
language English
topic TH Building construction
Systems of building construction. Industrialized building
spellingShingle TH Building construction
Systems of building construction. Industrialized building
Ahmad, Ahmad Mu’az
The application of ACOTEC system in the industrialised building system: the case study of medium cost apartment in Sungai Nibong, Pulau Pinang / Ahmad Mu’az Ahmad
description Industry of construction has been revolved from many centuries. As we known the traditional method of construction has many disadvantages than advantages. Within the past the engineer has been develop new technology to clear the disadvantages that been faced by many contractors. The technology is called as Industrialised Building System(IBS) that a technology that give the east to do work. Also the IBS has effect the cost of construction and duration of construction. This report will enlighten readers about the Industrialised Building System(IBS) that been applicate to the construction of Medium Cost Apartment. To gain the information about this title report, the writer did an observation by himself at the site and also referred to books from the USM library and writer also did a few interviews with the site personnel. The tittle of this report is “The Application of ACOTEC System in the Industrialised Building System (IBS): The case Study of Medium Cost Apartment in Sungai Nibong” as a case study.
format Student Project
author Ahmad, Ahmad Mu’az
author_facet Ahmad, Ahmad Mu’az
author_sort Ahmad, Ahmad Mu’az
title The application of ACOTEC system in the industrialised building system: the case study of medium cost apartment in Sungai Nibong, Pulau Pinang / Ahmad Mu’az Ahmad
title_short The application of ACOTEC system in the industrialised building system: the case study of medium cost apartment in Sungai Nibong, Pulau Pinang / Ahmad Mu’az Ahmad
title_full The application of ACOTEC system in the industrialised building system: the case study of medium cost apartment in Sungai Nibong, Pulau Pinang / Ahmad Mu’az Ahmad
title_fullStr The application of ACOTEC system in the industrialised building system: the case study of medium cost apartment in Sungai Nibong, Pulau Pinang / Ahmad Mu’az Ahmad
title_full_unstemmed The application of ACOTEC system in the industrialised building system: the case study of medium cost apartment in Sungai Nibong, Pulau Pinang / Ahmad Mu’az Ahmad
title_sort application of acotec system in the industrialised building system: the case study of medium cost apartment in sungai nibong, pulau pinang / ahmad mu’az ahmad
publishDate 2017
url https://ir.uitm.edu.my/id/eprint/56630/1/56630.pdf
https://ir.uitm.edu.my/id/eprint/56630/
_version_ 1726795683203121152